Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Whole of mine planning – Evolution Mount Rawdon case study
By M L, G Maddocks, A Ferrier, ers, A Forbes
Evolution’s Mount Rawdon Operation (MRO) produces gold and silver through open pit mining methods. The mining operations are scheduled to be completed in FY24 (Financial Year 2024), after which low-gr
Aug 2, 2023
-
Quantifying the influence of weathering on erosion and degradation of post mining landforms
By G R. Hancock, W D. D P Welivitiya
is placed in a waste rock dump, which is usually later reshaped to be erosionally stable, initiate and sustain vegetation and ultimately integrate with the surrounding undisturbed landscape. However,
Aug 2, 2023
-
Developing a regional data catalogue to support the technical assessment of post-mining land use
By C M. Côte, P Bolz, L Pagliero, M Edraki, M Shaygan, P Erskine
Mines in Queensland must now prepare a Progressive Rehabilitation and Closure (PRC) plan, with the requirement to justify the selection of the post-mining land use (PMLU) for each rehabilitation domai
Aug 2, 2023
-
Polymer-amended tailings dewatering technology for desired closure outcomes
By T Baumgartl, A Costine, B Boshrouyeh, M Edraki
In mineral processing, the management of tailings may become increasingly more challenging with a change of ore type and the quality of water used in the plant. This, in turn, may affect the overall c
Aug 2, 2023
-
Synergies between renewable-powered mines and community development programs throughout mine life cycle and post-closure
By J Joughin, D Kyan, L Rollin
In line with the 2015 Paris Agreement and corresponding climate disclosure requirements, many mining companies have publicly disclosed that they are developing and/or implementing ambitious decarbonis
Aug 2, 2023
-
Viable and feasible decarbonisation – Tent Mountain coalmine repurposing for the clean energy economy
By B D. Saffron
In 1983, open cut coal mining operations were suspended at the Tent Mountain coalmine, located in Alberta, Canada in an area called Crowsnest Pass. Montem Resources (‘Montem’), an Australian mining co
Aug 2, 2023
-
Shifting post-mining land use planning from mine site to regional scale
By C M. Côte, S Worden, K Svobodova
Mines in Queensland are transitioning to the progressive rehabilitation and closure plan (PRCP) framework. Mine operators are required to select and justify appropriate and viable post-mining land use
Aug 2, 2023
-
Economic analyses (EA) and life cycle assessment (LCA) on repurposing of mine waste via geopolymerisation technology
By H M. A Ilyas, M Yahyaei, S Amari, M Darestani
Tailings are generally deposited on or near to the mine sites, occupying the site area, and being an economic burden for mining companies. Tailings can cause several environmental impacts, such as lea
Aug 2, 2023
-
Contour drains and benches – are they an effective long-term run-offand sediment control method?
By G R. Hancock
A common and cost-effective method for post-mining landscapes is to construct linear hillslopes with a break in the hillslope at appropriate distances to reduce hillslope length and resultant erosion
Aug 2, 2023
-
Assessing the effectiveness of erosion predictions from a landform evolution model with field observations from a rehabilitated landform
By G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard
Landform evolution models (LEMs) can assess the effectiveness of landform designs applied to a rehabilitated landform by predicting where erosion may occur. Here, we compare erosion predictions produc
Aug 2, 2023
-
Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mine
By S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi
Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine
Aug 2, 2023
-
Cobalt, copper tailings and the circular economy – a case study from the Capricorn Copper Mine, north-west Queensland minerals province
By L Nicholls, A Parbhakar-Fox
Reprocessing Queensland’s historical copper tailings for critical minerals is an opportunity to circularise the state’s mining industry by converting waste liabilities into assets. Mine waste valorisa
Aug 2, 2023
-
Can biocements stabilise tailings storage facilities?
By G Simpson, S Dressler, A E. Levett
Tailings storage facilities often represent a mining operation’s most significant liability, posing serious environmental, social and safety risks. Almost all mining operations dispose of wet tailings
Aug 2, 2023
-
The Mine Land Rehabilitation Authority – reducing risk for Victoria
By R Mackay, J Brereton
On 30 June 2020, the Mine Land Rehabilitation Authority (the Authority) superseded the Latrobe Valley Mine Rehabilitation Commissioner as the independent overseer of Victoria’s declared mine rehabilit
Aug 2, 2023
-
Traceability of native seed for mine rehabilitation
By A Grant, H Thomas, C Clarke, B Fuller
Native seed and plants are often a core input into the rehabilitation process of mine closure. Native plant establishment rate and performance is a function of many input elements including seed quali
Aug 2, 2023
-
The critical pool levels for the Yallourn Mine determined using the MGRI
By J Butler, N Patel, S Narendranathan, S Rastogi
The Yallourn Mine (YM) commenced mining of brown coal in the 1920s under operation by the State Electricity Commission of Victoria (SECV), prior to it becoming privatised in 1996. The present owners o
Aug 2, 2023
-
The role of the regulator in promoting a highly reliable mining industry
By S Johnston, L Howe, S Stevens
Regulators have an important role to play in fostering and enabling reliable, effective, environmental management. Given this, it is perhaps surprising that there has been relatively little debate on
Aug 2, 2023
-
Above and beyond NPV – determining the life-of-mine from an economic perspective
By C Tapia, B Hay
There is a close relationship between the mining industry, economic growth, and technological and social development. Mining activities benefit all economic agents, but only during a timespan determin
Aug 2, 2023
-
Alternative mineral processing strategies for copper-gold tailings management
By C Antonio, R Narayan, A Scheuermann, S Quintero, M Edraki, M Ziemski
Tailings are mostly loose material and can be classed as non-plastic sandy silts. They also tend to have low permeability, resulting in slow consolidation (settling) rates and low shear strength, even
Aug 2, 2023
-
In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case study
By K Grohs, A Satriawan, S R. Pearce
Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi
Aug 2, 2023