Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
-
A Process for the Recovery of Cobalt from Speiss
By Fennell B
A process for the recovery of cobalt from a speiss produced at Sulphide Corporation is presented. The speiss is leached in oxygenated sulphuric acid to dissolve the metallic iron at a pH of around 4.
Jan 1, 1983
-
A process-based approach to mine rehabilitation decision making using Bayesian modelling and risk-based principles for dispersive spoil rehabilitation
By E Thomas, L McCallum, G Dale, J Bennett, K Reardon-Smith, S Raine
Sustainable closure of coal mines in Australia to a safe, stable, non-polluting condition remains one of the industry’s biggest environmental and social challenges. A significant proportion of mines i
Jul 25, 2018
-
A Producing Miner's View of DCF Methods in Mineral Valuation
By McMahon D
The approach to valuations at the Normandy Poseidon Group is a measured and methodical process that utilises skills sourced from a number of different disciplines. Whilst being subject to a strict
Jan 1, 1994
-
A Progressive, Iterative Approach Leading to Reliable Metallurgical Accounting Sampling Systems
By F F. Pitard
The optimization of metallurgical processes requires knowledge of the heterogeneity carried by constituents of interest. The common scenario, almost an industry standard, is to rely on the engineering
Sep 7, 2015
-
A Proposal for Standard Reference Material Recertification
Largely inherited from the past and from strictly internal laboratory use, the certification of reference material using round-robin assaying is often insufficient for the use made today for external
Jan 1, 2008
-
A Proposed Copper Metallurgical Process
The writer had the pleasure of several months' laboratory tests on a metallurgical process for copper ores devised by Mr. W. H. Corbould, Consulting Engineer, North Queensland. Mr. Corbould'
Jan 1, 1921
-
A Proposed Modification of The Square Set
When the writer first saw the square-set timbering, he was at once impressed with the fact that the frames made by the sets, along the lode amI across it, were composed of panels with rectangular open
Jan 1, 1911
-
A Proposed Modification of the Square Set
By A. J. MOORE
When the writer first saw the square-set timbering, he was at once impressed with the fact that the frames made by the sets, along the lode and across it, were composed of panels with rectangular open
Jan 1, 1912
-
A Proposed Standard for the Objective Measurement of Muck Pile Profiles
Blast Engineers frequently use the terminology "the blast showed good heave", or even "the heave was better this time". It is reasonably obvious that "good" and "better" are not the best terms to us
Jan 1, 1990
-
A Proton Microprobe for the Geosciences
By Ryan CG, Cousens DR, Griffin WL
The proton microprobe is developing into a vital tool in the geosciences, through its high sensitivity for in-situ detection of trace elements in the ppm regime. This paper will describe the instru
Jan 1, 1989
-
A Pyrolysis Approach to Refractory Gold Processing
By Anylmore M, Walker A, Fletcher A
Roasting of sulphide and sulph-arsenide gold ores produces unwanted emission of sulphur and arsenic oxides, and a less than complete recovery of gold. Pyrite loses sulphur and arsenopyrite loses ars
Jan 1, 1992
-
A Quantitative Assessment Model for the Environmental Issue in Gold Production
By J Wei, X Lan, F Wang
This paper presents a quantitative assessment model for the assessment of environmental load in gold production, which is based on environmental ecology, Life Cycle Assessment (LCA) and artificial neu
Jan 1, 2003
-
A Quantitative Assessment of the Factors Influencing the Shaft Versus Trucks Decision
As near-surface underground mines progress deeper, the inevitable question is whether to convert from truck haulage to shaft hoisting. The desire to defer capital expenditure frequently delays investi
Jan 1, 2005
-
A Quantitative Chemical Model of the Broken Hill Lead-Zinc Deposit
A quantitative chemical model of the rocks of the Broken Hill lode environment is presented to illustrate a stratiform orebody in a meaningful form to scientists interested in environmental control on
Jan 1, 1968
-
A quantitative risk assessment tool for geothermal outbursts at Lihir Gold Mine
By M Zoorabadi, Y Zhang, D Bringemeier, S Nicoll, N Kerr
Lihir operations of Newcrest Mining Limited (NML) are on Lihir Island (PNG) which is located approximately 900 km north-north-east of the national capital Port Moresby. The mine is located within the
Nov 29, 2022
-
A Rapid and Cost-Effective Method for Bench Screening of Geochemical Performance and Disposal Options for High-Sulfide Tailings
By M Logsdon, B Johnson, M Fordham
The underground Neves Corvo copper-tin mine in southern Portugal currently disposes of its tailings in a ætraditionalÆ wet tailings impoundment. With the development of new technologies for preparatio
Jan 1, 2003
-
A Rapid, Efficient and Cost-Effective Method for Assessing the Environment in Large or Remote Areas Using Remote Sensing
By Anderson DR, Tassell G
A major environmental impact study carried out in the sand dunes of eastern Cape York used image analysis of remotely sensed data to both select sites for ground investigation and categorise the di
Jan 1, 1987
-
A Re-Interpretation of Burra Burra Copper Deposits
The Burra Burra Aline is in complexly folded Torrensian dolomites and limestones forming the faulted axial region of a major anti cling. The orebody mined was largely of secondary origin and confined
Jan 1, 1963
-
A Re-Interpretation of the Burra Burra Copper Deposits
The Burra Burra Mine is situated in complexly folded Torrensian dolomites and limestones forming the faulted axial region of a major anticline. The orebody mined was largely of secondary origin and co
Jan 1, 1963