Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Analysis Of Pillar Design Practices And Techniques For U.S. Limestone Mines
By A. T. Iannacchione
Synopsis Underground stone mining Is an emerging sector of the U.S. mining industry. As this expansion takes mines under deeper cover, and as more efficient mining methods are utilized, effective sto
-
Analysis of Plugging Effect for Open-Ended Piles in Sandy Soil
By Sangseom Jeong, Moonkyung Chung, Junyoung Ko
"Abstract The plugging effect of open-ended piles in sandy soil is analyzed by full-scale field test and plugging measurement. PLR (plug length ratio) measurement data from 144 field cases are analyze
Jan 1, 2014
-
Analysis of Poly Amine Deactivation/Depression System for Cu-Activated Pyrrhotite using Eh-Ph Stability Diagrams
By S. Kelebek, E. Yalcin
"Diethylenetriamine (DETA) and/or triethylenetetramine (TETA) are reagents that can generally be categorized under ""flotation modifiers"". These polyamines are known to be effective for the deactivat
Jan 1, 2009
-
Analysis Of Porosity And Flexural Strength Changes Of Red Ceramic Pieces Incorporated With Ornamental Rock Waste
By C. B. Piazzarollo
Red Ceramic materials are widely used in Civil Construction in Tropical Countries. However, these materials have high porosity and low mechanical strength. Thus, in order to improve these properties,
Jan 1, 2015
-
Analysis of Post Detonation Fumes from Commercial Explosives in an Underground Operating Environment
By Jones IO, Coles A, Austin D
This research project came about as a result of ICI Australia offering a scholarship to a final-year mining engineering student at the Western Australian School of Mines. A signifi-cant part of this y
Jan 1, 1984
-
Analysis of Potential Failure Mechanisms during the Construction of a Rockfill Dyke on a Submerged Tailings Beach
By Edouard Masengo
A long dyke will be constructed in a lake with rockfill placed by end dumping method. Its crest will be at elevation 521.5 m compared to the nominal lake level at 520 m. In the first portion, its heig
May 1, 2003
-
Analysis of Powder Processing in the Roller Press Using Finite Element Modeling
By Richard K. Komarek, Antonios Zavaliangos, Roman T. Dec
"The work in the paper introduces a 2-dimensional finite element model for analyzing particular material processing in a roller press. Two basic roller geometries are considered: (a) smooth rolls (use
Jan 1, 2003
-
Analysis of Powder Processing in the Roller Press Using Finite Element Modeling
By Richard K. Komarek, Antonios Zavaliangos, Roman T. Dec
Roller presses are widely utilized in mineral industry for fine milling and compaction. Recently used models are providing only limited information about the material behavior in the roll bite. This p
Jan 1, 2003
-
Analysis Of Power Draw In Tumbling Mills
By B. K. Mishra
Power draw of the mill has been accepted as an indicator of the performance of the mill, yet the problem of predicting power under a given set of mill operating conditions still remains to be solved.
Jan 1, 1993
-
Analysis Of Practical Ground Control Issues In Highwall Mining
By R. Karl Zipf, Suresh Bhatt
Highwall mining is an important coal mining method. It appears that upwards of 60 highwall miners are presently in operation, and they may account for approximately 4% of total U.S. coal production.
-
Analysis Of Practical Ground Control Issues In Highwall Mining
By R. Karl Zipf
Highwall mining is an important coal mining method. Upwards of 60 highwall miners are presently in operation, and they may account for approximately 4% of total U.S. coal production. A review of the M
Jan 1, 2004
-
Analysis of premature failure of rock bolts and cable bolts failed in underground coal mines
By P Craig, A Crosky, H Ramandi, S Saydam, H Chen
Frequency of reports on premature failure of rock bolts and cable bolts have increased in past two decades. Such a failure threatens both the safety of underground mine workers and the economic viabil
Nov 30, 2018
-
Analysis of pressure drop and hold-up during vertical transport of limestone slurry in lean phase and heterogeneous regime
By J. K. Pothal, S. Basu, R. Barik, P. K. Senapati, A. Dubey
The aim of this paper is to study the characteristics of limestone particles (size varies from 4 mm to 20 mm) during its transportation from open cast mines through pipes. The influence of four differ
Mar 4, 2025
-
Analysis of Procedures and Drivers for Industrial Waste Management
Analysis of Procedures and Drivers for Industrial Waste Management
Sep 13, 2010
-
Analysis Of Productivity Trends At A Surface Coal Mine Utilizing A Shovel And Bucket Wheel Excavator
By Richard F. Roethe
Surface coal mining productivity in the U.S. and Illinois has shown a general declining trend since 1969. The U.S. Department of Energy conducted an analysis in 1980 of the causes of declining product
Jan 1, 1983
-
Analysis Of Productivity Trends At A Surface Coal Mine Utilizing A Shovel And Bucket Wheel Excavator
By Y. P. Chugh, R. F. Roethe
Surface coal mining productivity in the US and Illinois has declined since 1969. The US Department of Energy conducted an analysis in 1980 of the causes of declining productivity in different states.
Jan 1, 1985
-
Analysis of Progressive Seismicity and its Correlation with Geotechnical Variables at the El Teniente Mine
By A Brzovic, E Córdova
In an underground mine, different mining activities such as undercutting and cave progression generate redistribution in the present in situ stress field, and these changes are represented in the rock
May 9, 2016
-
Analysis of raise boring with grouting as an optimal method for ore pass construction in incompetent rock mass - A case study
By Wedam Nyaaba, Edward Wellman, Angelina Anani, Eduardo Cordova, Sefiu O, Cluber Rojas, Adewuyi
This study aims to investigate the optimal method for ore pass construction in incompetent rock masses. We evaluated the conventional and raise boring methods based on safety, efficiency, excavation c
Dec 1, 2024
-
Analysis Of Real-Time Shield Pressures For The Evaluation Of Longwall Ground Control Problems
By K. Saikiran, A. R. Nalla
Longwall management, regular shield maintenance, and evaluation of ground control problems can be performed using real-time shield monitoring program. Based on real-time shield pressure data, evaluat
Jan 1, 2000
-
Analysis Of Recent Advances In Smelter Gas Cleaning Systems
Smelter operating and environmental requirements demand high on-stream time (high reliability) from the primary smelter sulfur retention device - the sulfuric acid plant. The key to reliable smelter s
Jan 1, 1992