Contract—A tool for evaluating mining contracts
By D. McCarthy
Contract is a PC-based software program designed to satisfy the main features that have been identified to be lacking from cost estimation systems currently in place in the Australian coal industry. C
Jan 1, 2003
-
Repair works and tests at the Rossio tunnel, Portugal
By F. Pinto, J. V. Lemos, A. Sousa, L. Ribeiro e Sousa
The Rossio railway tunnel was built in 1890 crossing several formations involving limestones, basalts and also sandy and clayey formations. Due to the fact that it is an old underground structure reha
Jan 1, 2003
-
Considering in situ grade variability during mining sequence
By R. Peroni, J. Kopp
Mine planning and scheduling is based on using a geological model for the deposit. Blocks are used to discretize the deposit into mineable volumes where grade values are assigned. Traditional estimati
Jan 1, 2003
-
A design protocol for mining remnants in hard rock mining operations utilising a rock mass classification system
A well known rock mass classification system has been altered slightly to address the issues found under remnant mining conditions. By detail study of the expected fracture patterns and local geology,
Jan 1, 2003
-
Shear behaviour of graphite infilled joints based on Constant Normal Stiffness (CNS) test conditions
Due to the reduction in frictional resistance, the characteristics of joint infill have a major role to play on rock mass instability. This paper elucidates the laboratory behaviour of graphite infill
Jan 1, 2003
-
The role of an advanced shotcrete constitutive model for reliable predictions of the ground-shotcrete interaction in tunneling
By D. Boldini, R. Lackner, H. A. Mang
ABSTRACT: In this paper, the strong interaction between the hardening shotcrete lining and the surrounding ground in NATM tunneling is investigated by means of axisymmetric analyses, accounting for th
Jan 1, 2003
-
Modelling water uptake in highly compacted bentonite in environmental sealing barriers
By W. Wittke, J. Gattermann
ABSTRACT: One alternative to close a radioactive waste repository in rock salt is the construction of a “Cross Section Closure (CSC)“ sealing barrier. The proposed material for the CSC is highly compa
Jan 1, 2003
-
Guidelines for geotechnically anomalous conditions in tabular hard rock mines
By A. R. Leach
Anomalous mining conditions can be described where the level of hazard is increased relative to normal conditions within a mining area. Normal conditions would be those defined as a Ground Control Dis
Jan 1, 2003
-
Study on nonlinear damage localization process of rocks under water chemical corrosion
By Li. S., C. Sili
Abstract. Study on nonlinear damage localization process of rocks under water chemical corrosion is a more interesting topic in rock mechanics research world widely. It is very important in estimating
Jan 1, 2003
-
A Laboratory Investigation Into The Effect Of Specimen Size On The Strength Of Coal Samples From Different Areas
By J. N. Van der Merwe
The results of over 900 coal strength tests done during the period 1993?1994 for the SIMRAC project COL021A were re-analysed with a view to find a method to delineate areas or seams that can be groupe
Jan 1, 2003
-
Comparison of the fractography of rockbursts and impact structures
By W. U. Reimold, R. Armstrong, R. G. Charlesworth
For many years rockbursts have plagued the mining industry. Although much research has gone into studying this phenomenon only a small proportion of it has been on the actual source mechanism. A study
Jan 1, 2003
-
Utilization of blast movement measurements in grade control
By I. R. Firth, D. L. Taylor
Metal mining operations, in particular gold mining operations, use intensive ore control procedures in order to manage the extraction of ore zones from benches containing both ore and waste material.
Jan 1, 2003
-
Masjed-e-Soleiman HEPP, Iran Rock Engineering Investigations, Analysis, Design and Construction
By F. B. Samani, B. Stabel
The 1,000 MW Hydro Power Station Masjed-e-Soleiman (formerly called Godar-e-Landar) in Iran is under construction since 1992. The rock engineering aspects of the major underground structure, i.e. the
Jan 1, 2003
-
Problems with the introduction of personal sampling of respirable dust in underground coal mines in the UK
By D. Mark, S. R. Hunneyball
The ongoing revision of the Respirable Dust Regulations (RDR) by the UK coal mining industry includes the introduction of personal exposure monitoring for underground mines, rather than the fixed poin
Jan 1, 2003
-
The application of Microsoft® Active Server Page technology in the mining environment as a management information tool
By D. S. Richards
Computers have revolutionized the collection of data on modern mines. Never before has it been possible to collect data from all aspects of the mining value chain at rates now common. With this has co
Jan 1, 2003
-
Practical aspects of large-scale conditional simulations
By M. E. Rossi
All large-scale applications of conditional simulations intend to benefit from the ‘correct’ (or’ accurate’) characterization of uncertainty, adequately describing the variability observed from the da
Jan 1, 2003
-
Considerations in regard to the safety of RF shot firing equipment
By C. Cunningham
The process of initiating opencast blasts through long cables is onerous. An obvious alternative is to replace these with radio controlled firing apparatus. Such devices appear from time to time and w
Jan 1, 2003
-
The Minerals Educational Trust - Increasing The Support For South African Universities And Technikons - Origins
In the 1980s and?90s the gold mining industry in South Africa came under pressure from the continued poor dollar gold price and escalating Rand based costs, furthermore the external impacts on the ind
Jan 1, 2003
-
Probabilistic approach in rock slope stability analysis for Himalayan conditions
By S. Pathak, B. Nilsen
Abstract: In recent years, probabilistic approach with the calculation of probability of failure instead of a factor of safety against failure is emerging in practice. The main objective of the paper
Jan 1, 2003
-
The Effect Of The Proposed Royalty Billon Mineral Property Values - Introduction
By E. V. Lilford
The South African Minerals Development Act (?the Act?) has been promulgated and will come into full force and effect once it is gazetted. Thereafter, all Old Order mineral rights will have to be conve
Jan 1, 2003