Protection of Environment in Conveying of Bulk Powder MaterialsBy C Pypno, P Nowakowski, T Opasiak, C
Belt conveyors are machines for continuous transport with most applications in mining industry in Poland. This is a result of simple construction and cheap operating costs. But conveying materials by
Jan 1, 2003
-
Environmentally and Publicly Acceptable Options for Remediation at Tui Mine Site, Te ArohaBy J Webster-Brown
The Tui Mine is an abandoned Pb-Zn mine giving rise to water quality problems in the Te Aroha region of Coromandel, New Zealand. When sampled in September 2002, for example, both the Tui and Tunakohoi
Jan 1, 2003
-
Laboratory Experiments of As(V) and As(III) Sorption Onto Pit-Lake Sediments From Three Different Orebody TypesBy D L. Decker, G C. Miller, C Papelis
Arsenic, often associated with precious metals ore deposits, is a major contaminant released during large-scale gold mining. Because of the complex oxidation/reduction and sorption behaviour of As, pr
Jan 1, 2003
-
CAES System at KCGM ù Four Years OnBy L O. ÆNeill, J Bebek
When Kalgoorlie Consolidated Gold Mines (KCGM) purchased its fleet of 18 CaterpillarÆs dump trucks in 1999, as part of its change to owner operated mining, five CaterpillarÆs Computer Aided Earthmovin
Jan 1, 2003
-
Lihir Gold Five Years On ù Maximising Throughput and Capital UtilisationDuring the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future
Jan 1, 2003
-
Acid Rock Drainage Treatment Technologies ù Identifying Appropriate SolutionsBy N Murphy and, S Santomartino, M Cramer
Acid rock drainage (ARD) can have detrimental effects on mining infrastructure, water reuse options and environmental discharge. As a result, some form of short- or long-term treatment is required at
Jan 1, 2003
-
Metallurgical Processing Plant Ramp-Up Periods ù How to Reap the æRewardsÆFundamentally, the development of a minerals processing project is a very risky enterprise. Most mining companies do not have sufficient financial resources to undertake significant projects and hence
Jan 1, 2003
-
Flotation Circuit Analysis at WMC Ltd Olympic Dam OperationBy P Wigley
New methods of analysing and modelling flotation circuits have been developed as part of the AMIRA P9 mineral processing research project. A study using these techniques was conducted on the Olympic D
Jan 1, 2003
-
Rehabilitation of the Lake George Mine at Captains Flat NSW ù 25 Years OnBy J Brisebois
The derelict Lake George Mine is located at Captains Flat in NSW, acommunity of approximately 450, which lies some 43 km southeast ofQueanbeyan. It straddles the Molonglo River, which flows toQueanbey
Jan 1, 2003
-
Blasting Improvements at KCGMBlasting is a common practice in mining whereby solid rock is fractured, using explosives, to a more manageable size. The effectiveness of blasting influences a number of downstream activities such as
Jan 1, 2003
-
Use of Mineralogical Analysis in Risk Assessment for Coal MiningA comprehensive understanding of the rocks associated with coal seams, and also of the coal itself, is essential in assessing the likely behaviour of the materials before, during and after the mining
Jan 1, 2003
-
The Practical Implementation of Dewatering and Depressurisation in Large Open PitsAll large open pits in Australia have been mined, or are planned to be mined well below the local water table. This raises several issues that impact on mine safety, mining costs and regulatory approv
Jan 1, 2003
-
Staff Development and Training at Geita Gold Mine, TanzaniaBy C Kusi-Manu, E Nyamusika
Geita Gold Mining Limited (GGML) is owned and jointly managed by Ashanti Goldfields Company (Ghana) and Anglogold (South Africa). The mine is currently one of the largest gold producing open pit opera
Jan 1, 2003
-
Characterising the In Situ Conditions Within Rehabilitated Spoils at South African Opencast CollieriesBy F D. I Hodgson
Twenty-seven observation test pits were excavated at four different spoils dumps at three collieries in the Witbank Coalfield. The holes were dug into the upper three metres of the spoils to ascertain
Jan 1, 2003
-
Factors Affecting Underground Leaching of OresBy G M. T, M Zh Bitimbayev, F K. Shadiyev
In the paper a complex problem was formulated for studying and establishing an effective and safe technology of selective underground leaching of useful components from polymetallic ores. Solving this
Jan 1, 2003
-
River Health Monitoring in Mining AreasBy S Choy
Aquatic macroinvertebrates have been used as a monitoring tool for many years. They are ubiquitous and occupy a central role in the ecology of rivers. They are a key link in the aquatic food chain, fo
Jan 1, 2003
-
Water Recovery From a Mine in the Atacama DesertBy H Plewes, A Bur, L Murray, J Pottie
Water recovery from tailings for reuse in mineral processing is essential to operation of mines in the Atacama Desert of Chile. With annual rainfall of 5 mm, the prudent and efficient use of available
Jan 1, 2003
-
Field Studies of Semi-Passive Biogeochemical Treatment of Acid Rock Drainage at the Island Copper Mine Pit LakeBy M Wen, J Gerit, C A. Pelletier, D Muggli
On-land waste rock dumps at BHP Billiton Base MetalsÆ Island Copper Mine (ICM) near the northern end of Vancouver Island, B.C. continue to discharge ARD. These waters, which amount to approximately fi
Jan 1, 2003
-
Evaluation of Complex Systems to Develop Key Water Quality Influences at the DeBeers Snap Lake Diamond ProjectBy R L. Verburg, R Johnstone
DeBeers Canada Mining Inc (DeBeers) recently submitted an Environmental Assessment (EA) for its proposed Snap Lake Diamond Mine located in Northwest Territories, Canada. As part of the EA process, a s
Jan 1, 2003
-
The Measurement and Control of Dilution in an Underground Coal OperationDilution in underground coal operations can be underestimated by up to five times during feasibility studies, with disastrous economic consequences. Every one per cent of stone waste introduced can re
Jan 1, 2003