Flotation Of Salt-Type MineralsBy P. Somasundaran, H. S. Hanna
The separation of minerals such as apatite and scheelite by flotation from other salt-type minerals such as calcite is extremely complex owing to the close similarity between their physicochemical pro
Jan 1, 1976
-
OFR-106-76 Additional Fluorescent Luminaire Hardware And Assistance In Field Evaluation - 1.0 IntroductionIllumination hardware developed in conjunction with previous Contracts H024202l, H0242049, and H0242023 had not been adequately tested in actual underground work situations. The purpose of this contra
Jan 1, 1976
-
Lime Control System For Highly Alkaline Flotation Circuits ? IntroductionBy A. G. Moon
Kennecott Copper Corporation's Chino Mines Division concentrator is located in Hurley, New Mexico. Construction of the concentrator was started in 1910 and its capacity was progressively increase
Jan 1, 1976
-
RI 8132 Methane Emissions From an Advancing Coal Mine Section in the Pittsburgh Coalbed (ed75533c-eac2-4ff0-b5f1-4dd87e27419c)By P. W. Jerant
The methane emissions from an advancing coal mine section were continuously monitored for 120 days. During this time, the section advanced 2,000 feet into virgin Pittsburgh coalbed producing 54,565 to
Jan 1, 1976
-
Appendix C -Lighting Regulations: Underground Coal MinesBy Cecil E. Lester
Since the advent of coal mining, the minimal lighting in the under¬ground working place has been an obstacle to the safe and efficient performance of the miner's many tasks. Compounding this prob
Jan 1, 1976
-
Relationships between Pipe stress, Ground Particle Velocity and Scale Factors in Blasting DolomiteBy Dennis Alan Clark
An increase in construction and quarry operations has necessitated blasting activities in areas once considered rural and in the close proximity of transmission pipelines. A method to determine the ma
Jan 1, 1976
-
The Use of the Three Dimensional Boundary Integral Equation Method for Determining Stresses at Tunnel IntersectionsBy Hocking G
For some underground structures, the use of the plane strain assumption in stress analyses may not be justified. The finite element method and photoelasticity have been used to obtain complete 3-D
Jan 1, 1976
-
Flow of Particles Through Small Continuous Dry Ball MillsBy K. Shoji, R. Hogg, L. G. Austin
The flow of dry powders through continuous ball mills has been investigated. Based on a physical model of the system, expressions have been derived which relate the holdup of material in the mill and
Jan 1, 1976
-
Variability in the Sampling and Assaying of an OrebodyDifferences in the assay results of replicate samples engender doubts on the reliability of ore sampling and of assaying procedures. An analysis of variance is a technique to estimate the variabil
Jan 1, 1976
-
The Use of Seismic Measurements to Determine the Blastability of RockBy R R. Dimock
A goal of all mine operators is to optimize the breakage of the inplace rock to achieve maximum excavating efficiency. The use of the seismograph at Kennecott Copper Corporation's Nevada Mines Divisio
Jan 1, 1976
-
The Use of Large Diameter Blastholes Underground at Meramec Mining CompanyBy James C. Irvine
Meramec Mining Company's Pea Ridge underground mine is presently involved in a large scale pillar recovery program and has made use of both rotary and down-the-hole drills for large diameter blasthole
Jan 1, 1976
-
RI 8136 Oil and Gas Seeps in Alaska - North-Central Gulf of AlaskaBy Donald P. Blasko
The Bureau of Mines investigated two areas of oil and gas seeps in the north-central Gulf of Alaska--Katalla River to Bering River and Cape Yakataga to Yakutat Bay to determine (1) whether previously
Jan 1, 1976
-
IC 8727 Nonclogging Water Spray System For Continuous-Mining Machines: Installation And Operating GuidelinesBy Edward F. Divers
A new nonclogging water spray system for continuous-mining machines has been developed under contract with the Bureau of Mines. This paper presents installation and operating guidelines for the system
Jan 1, 1976
-
Preheating and Pipeline Charging of High Illinois Coal Blends for Byproduct CokingBy J. J. Knoerzer
A full-scale operational test was conducted on the Coaltek preheating and pipeline charging system at the Semet-Solvay Div. of Allied Chemical at Ironton, Ohio, for the purpose of determining whether
Jan 1, 1976
-
Randolph Preparation Plant: Maximum Production With Minimum MaintenanceBy Lawrence M. Brennan
Early in 1971 the Peabody Design and Preparation group began engineering on a preparation plant which was to process eight mil- lion tons per year of raw coal. For the first five or six years this pro
Jan 1, 1976
-
The Geologic Controls and Extent and Thickness of Coal Seams in the South Auckland Land DistrictIn the consideration of coal resources in this country one of the most neglected aspects and perhaps one of the most important is that of the geologic controls on coal formation. The composition, prop
Jan 1, 1976
-
OFR-123(4)-81 Finite Element Analysis Applied To Resin And Mechanical Roof Bolting Systems For Strata Bound Deposits - Volume IV ? Appendix D - Listing Of Computer Program SAP-S - 1. Program Layout Of SubroutineBy J. C. Gerdeen
It is of upmost importance to keep the size of the program to a minimum for the computer being used. One way is to reduce the size of the data bank by adjusting the large common array A in the main pr
Jan 1, 1976
-
OFR-122-76 The Illumination Of The Greenwich Collieries LongwallThis report describes the development, installation and performance of a lonpwall illumination system. The longwall illumination system was installed at the Greenwich Collieries 112, Cockport, Pa.
Jan 1, 1976
-
OFR-56-77 Personal N02 Sampler System DemonstrationBy Frederick C. Tompkins
A complete service system was established for the monitoring of personnel exposure to N02 based upon the use of passive dosimetry. This system is structured such that minimum effort is required of the
Jan 1, 1976
-
Reagent Manufacture At Nevada Mines Division ? IntroductionBy J. J. Harrington
Manufacture and mixing of flotation reagents at the mill site provides an economic and convenient method of maintaining a continuous and fresh supply of reagents for concentrator operations. Kennecott
Jan 1, 1976