Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-153-83 System Study Of Mine Rescue Through Electromagnetic MeansBy Robert L. Lagace
This report describes the results of a system study of the factors influencing mine rescue attempts based on the use of electromagnetic VF rescue transmitters by trapped miners and helicopterborne sea
Jan 1, 1982
-
OFR-3-83 Off-Highway Haulage Truck Overload DetectionBy J. A. Bartol
A survey was made of accident data and operating practices related to overloading and uneven load distribution on haulage trucks in noncoal open pit mines. Safety and economic aspects were analyzed. A
Jan 1, 1982
-
OFR-11-83 Portable Trailing Cables, Splices, And Couplers Design And Installation ConsiderationsBy L. A. Morley
This report summarizes the work performed on Bureau of Mines Contract J0199106, "Portable Trailing Cables, Splices, and Couplers - Design and Installation Considerations," from May 1, 1979 until Decem
Jan 1, 1982
-
OFR-196-83 Shearer Mounted Dust Collector Laboratory TestingEffective control of respirable dust is one of the most serious problems associated with longwall mining in the United States. This report describes the development and laboratory testing of dust coll
Jan 1, 1982
-
OFR-17-83 A Ventilation Study With Pressure Cycling In A Kerr-McGee Mine At Ambrosia Lake, NMBy J. E. Cleveland
The major health concern for uranium miners is the release of radon gas and the resultant ingrowth of the short lived daughters in the mine atmosphere. Present methods of control are the utilization o
Jan 1, 1982
-
OFR-25(2)-83 Monitoring And Modeling Of Shallow Ground Water Systems In The Powder River Basin - AppendicesBy Donald Koch
The project investigated regional impacts of mining on the ground water system of the Powder River Basin by: 1) establishment of a regional ground water monitoring network. and 2)development at a set
Jan 1, 1982
-
Introduction (224f115c-6433-44d9-9ff0-9a561493ec2d)Research 82 highlights significant studies conducted during the past fiscal year at Bureau facilities and offices. Readers who want more information about the projects and studies summarized here can
Jan 1, 1982
-
OFR-20-84 Feasibility Study Of In-Mine Coal Preparation FacilitiesThis work examined the feasibility of in-mine coal preparation in two phases. Phase I included a survey of previous investigations and a preliminary analysis of the economic and technical feasibility
Jan 1, 1982
-
OFR-174-82 Impact Of Surface Mining On Soil Compaction In The Midwestern U.S.A.By Steve C. Albrecht
The objective of this study is "to assess the impact of surface mining on soil compaction in the Midwest". The study revolves around a unique field sampling program targeted at four mine sites utilizi
Jan 1, 1982
-
OFR-180-82 Guidelines For Environmental Monitoring In Underground Coal Mines ? Phase 1By H. A. Wright
This report assesses the economic, legal, institutional and technical factors that affect the current and future status of implementation of mine monitoring systems in the United States. It begins wit
Jan 1, 1982
-
OFR-127-82 Improved Visibility Systems For Large Haulage Vehicles. Volume IIBy James L. Eirls
The objective of this project was to improve a driver's field of view for large trucks used in the mining industry. Rearward viewing was enhanced by improving the rear-view mirror designs. Rear v
Jan 1, 1982
-
OFR-100(2)-83 Evaluation Of Proximity Warning Devices (Phase III, Volume 2)By J. H. Nixon
A three phase program evaluated commercial proximity warning devices, developed and designed a microprocessor-based electrostatic field measurement instrument, and utilized this instrument to investig
Jan 1, 1982
-
OFR-134-83 Mine Waste Location By Satellite ImageryBy Michael A. Anuta
This report describes the potential for utilization of satellite observations for remote sensing of mine waste disposal areas. Four study sites consisting of metal and nonmetal mining areas in differe
Jan 1, 1982
-
The Mineral Industry Of Alabama (add90d76-1ca2-4626-b31c-660156e5ab28)By James R. Boyle
The value of Alabama's nonfuel mineral production in 1980 was $328.6 million, a decrease of $7.8 million from 1979. Cement, crushed stone, lime, clays, and sand and gravel continued as the major
Jan 1, 1982
-
OFR-103-84 Investigation Of The Interaction Between Acid Mine Water And Concentrator WastesBy F. E. Diebold
The wastewater-treatment system of the Anaconda Mining Co., at its Butte, MT., operation has been physically and chemically characterize modeled on a computer and investigated with respect to alternat
Jan 1, 1982
-
IC 8886 Mine Illumination - Proceedings: Second International Mine Lighting Conference Of The International Commission On Illumination (CIE)The U.S. Bureau of Mines, Department of Labor, and United States National Committee of the CIE hosted the TC4.10 Mine Lighting Committee Meeting and Second International CIE Mine Lighting conference a
Jan 1, 1982
-
IC 8901 Real-Time Calculation Of Product-Of-Combustion Spread In A Multilevel MineBy John C. Edwards
A computer program, developed for the Bureau of Mines under contract, predicts in a quasi-steady-state approximation the ventilation and contaminant concentrations and temperatures when a fire occurs
Jan 1, 1982
-
OFR-107-82 Demonstration Of Coal Mine Illumination Systems (Machine Lightning Design For Coal Mine Applications)By William F. Hahn
This project focused effort on three separate areas: demonstration of a low seam longwall illumination system, design of illumination systems for low coal auger miners, and an assessment of machine li
Jan 1, 1982
-
OFR-96-83 A Study Of Explosion-Proof EnclosuresBy P. A. Cox
The purpose of the initial research performed under this contract was to determine the margins of safety in explosion-proof (XP) enclosures, which were designed and certified according to the current
Jan 1, 1982
-
OFR-111-83 Development Of A Prototype Retrofit Noise Control Treatment For Jumbo DrillsBy Nicholas R. Dixon
This report summarizes all work performed under Phases I, II and III of U.S. Bureau of Mines Contract H0387006, "Development of a Prototype Retrofit Noise Control Treatment for Jumbo Drills." The nois
Jan 1, 1982