Search Documents

Sort by

  • NIOSH
    OFR-138(4)-84 The Development Of Guidelines For Closing Underground Mines: Michigan Case Histories ? Introduction

    The Menominee Range of northern Michigan was a major producer of direct shipping iron ore for nearly a century. When the last underground mine on the Range ceased operation in 1978, it marked the end

    Jan 1, 1983

  • NIOSH
    OFR-14-84 Improved Crowd Limit Switches And Greenhorn For Electric Shovels

    By Gary Choate

    The work presented in this report represents the background activity which led to the fabrication and testing of a greenhorn and crowd limit switch system for electric shovels. The program began With

    Jan 1, 1983

  • NIOSH
    RI 8764 Velocity and Orientation Effects on the 10-mm Dorr-Oliver Cyclone

    By Andrew B. Cecala

    The Bureau of Mines conducted a brief laboratory study on the 10-mm diam Dorr-Oliver nylon cyclone to investigate (1) whether high wind speed (>300 ft/min), or sampler inlet orientation with respect t

    Jan 1, 1983

  • TMS
    Advances In Gas Cleaning Technology

    By P. D. Nolan

    Smelters operating under pollution control orders have become increasingly dependent upon the reliable operation of sulphuric acid plants and no factor affects the long term reliability of those plant

    Jan 1, 1983

  • AUSIMM
    The Fan Installation at Laleham Colliery

    Underground mine ventilation is now com monly simulated on a digital computer. Such a programme, incorporating natural ventilation has been modified by others to account for methane emission and el

    Jan 1, 1983

  • SME
    Ground Control Aspects Of Longwall Coal Mining

    By D. S. Choi, D. L. McCain

    INTRODUCTION Coal is forecast to be an increasingly important and economical source of energy for the future as the supply of oil and gas declines relative to overall energy demand and perhaps in a

    Jan 1, 1983

  • AIME
    Computer Programs For Statistical Graphics In Safety Analysis

    By Jon Kogut

    This paper describes three programs, currently in use within MSHA, for graphic analysis of accident frequency data. The first program, TREND, plots confidence bands for curved trends in data compiled

    Jan 1, 1983

  • AIME
    Glauconite (90472e3b-b168-4708-9a15-ec6aeb9e860c)

    By John Hower, Frank J. Markewicz, William Lodding

    Greensand, greensand marl, and green earth are names given to sediments rich in the bluish green to greenish black mineral known as glauconite by the mineralogist. The word glauconite is from the Gree

    Jan 1, 1983

  • CIM
    Improving productivity and efficiency in the mining industry: tile challenge of the 80s

    By G. R. Tostengard

    "The paper identifies functional areas which frequently can yield significant productivity improvement. Emphasis is placed on the repair and maintenance, material supply and training functions. Succes

    Jan 1, 1983

  • AIME
    Prediction of Caving Mine Drift Deformations

    By Robert A. Cummings, Francis S. Kendorski

    The behavior of the rock mass during block caving affects the production of the mine and dictates the loads and deformations placed on required drifts. Traditionally, the drifts used are massively rei

    Jan 1, 1983

  • SME
    Applied Geology: The Foundation For Mine Design At Exxon Minerals Company?s Crandon Deposit

    By Roger G. Rowe

    The Crandon deposit, located in northern Wisconsin, is a 65.8 million ton Precambrian volcanogenic massive sulfide deposit which averages 1.4% copper and 5.8% zinc. The deposit is classic in origin, m

    Jan 1, 1983

  • AIME
    Stopewall Closure and High-Modulus Backfill (65c9b931-0145-4c86-8198-2e0724790337)

    By K. Stout, L. Friel

    Some rock mechanics theorists believe that if a hydraulically placed backfill can be introduced in a stoped out area, which will minimize wall closure by taking high stresses across the fill with mini

    Jan 1, 1983

  • NIOSH
    OFR-204-83 Continuous Respirable Dust Monitoring System (CRDMS)

    By Pedro Lilienfeld

    The objective of this program was the development, design, fabrication, and laboratory testing of a mine-worthy continuous respirable dust monitoring system (CRDMS). The operation of the sensor unit o

    Jan 1, 1983

  • TMS
    Availability Of Toxic Metals From Non-Ferrous Metallurgical Slags Using Various Testing Procedures

    By D. A. Robbins

    The Resource Conservation and Recovery Act. of 1976 (RCRA) requires testing of waste materials as part of the determination of whether these materials are classified and managed as hazardous wastes. T

    Jan 1, 1983

  • AIME
    Power Determination For Mobile Mining Equipment By Computer Simulation

    By G. T. Lineberry

    Power requirements for a piece of mobile mining equipment are largely dependent on the set of conditions in which they must operate. These conditions are isolated and key parameters are identified. Th

    Jan 1, 1983

  • AIME
    Metalliferous Sediments of the East Pacific

    By Jack R. Dymond, Ronald G. Senechal, Robert O. Rye, Cyrus W. Field, Joseph F. Whelan

    Metalliferous sediments are present through- out much of the ocean basins and are locally prominent in the sedimentary column on and near the Nazca plate of the east-southeast Pacific Ocean. They typi

    Jan 1, 1983

  • TMS
    Thermodynamics And Kinetics Of Cyclones Melting Of Metal Sulphides

    By I. Barin

    The thermodynamics of cyclone smelting of sulphidic copper ores is described using as example the production of copper matte with 75 wt % Cu. Equilibrium calcualtions and material and energy balances

    Jan 1, 1983

  • AIME
    Blasting to Achieve Slope Stability in Weak Rock

    By C. Harries

    The mechanism of blasting and the effect that blasting has on rock properties including the generation of new cracks and the opening of existing joints is discussed and compared with changes in seismi

    Jan 1, 1983

  • TMS
    Economics Of Copper Smelting And Pollution Control

    By R. M. Nadkarni

    This paper examines the broad' economic parameters of copper smelting by conventional and new smelting technology. Location, transportation of products to market and pollution control options are

    Jan 1, 1983

  • NIOSH
    OFR-89-84 Feasibility Of An Underground Hydraulic Coal Mine Near Wilkeson, Washington

    By William C. Cooley

    A technical and economic study was made of the feasibility of establishing an underground hydraulic coal mine in the Wilkeson-Carbonado coal field approximately 25 miles southeast of Tacoma, Washingto

    Jan 1, 1983