Search Documents

Sort by

  • NIOSH
    RI 8853 - An Analyzer for Determining Helium-4 in the Parts-Per-Billion Range

    By Philip W. Holland

    The Bureau of Mines has developed a trace helium analyzer for deter-mining helium-4 in the parts-per-billion range. The instrument is used for analyzing pure gases, laboratory-prepared standards, and

    Jan 1, 1984

  • AUSIMM
    Performance of the Standard Semi-Variogram Estimator Using a Simulated Data Set

    Estimation of the semi-variogram is basic to the geostatistical processing of data. The most widely used arithmetic average estimator is here employed with various sampling patterns to calculate exper

    Jan 1, 1984

  • ISEE
    Retardation of an Underground Coal Fire in an Industrial Area by Means of Blasting

    By Claude Cunningham

    Late in 1982 a fire began in the shallow, abandoned workings of the Uitkyk Colliery near Witbank, South Africa. Urgent measures had to be taken to quench the fire, before the surface caving it caused

    Jan 1, 1984

  • AIME
    Lithologic Controls on Subsidence (f474b715-e7e5-4cb2-83cf-d644e7a4e2db)

    By J. F. Abel, F. T. Lee

    Subsidence is controlled by a complex com¬bination of mining and geologic factors. For example, a compilation of worldwide data shows that, as the percentage of shale in the overlying rock mass decrea

    Jan 1, 1984

  • NIOSH
    IC 8978 Manganese Availability - Market Economy Countries - A Minerals Availability Program Appraisal

    By Joseph S. Coffman

    To determine the availability of manganese for metallurgical purposes from selected world resources, the Bureau of Mines evaluated the potential production of contained manganese in concentrates based

    Jan 1, 1984

  • NIOSH
    Small Diameter Pumps For In Situ Leaching - Objective

    Reduce well construction and operation costs associated with in situ leach mining while increasing mineral recovery. Approach To accommodate the size of centrifugal pumps presently in use, in

    Jan 1, 1984

  • AIME
    Engineering Design For The Recovery Of Precious Metals From Heap Leach Solutions

    By Roger M. Nendick

    The recovery of precious metals from heap leach solutions can be accomplished by two processes: 1. The Carbon Adsorption Process 2. The Merrill-Crowe Zinc Precipitation Process A brief rev

    Jan 1, 1984

  • SME-ICGCM
    Design Factors In Near-Seam Interaction

    By A. Grenoble

    The mining of seams in close proximity can greatly accentuate interaction problems. At distances of less than 110 feet vertically interaction can occur for both over and under mining. Research into gr

    Jan 1, 1984

  • SME
    Shaft Design Criteria ? Introduction

    By Kot F. Unrug

    When reading different studies discussing trends in coal mining, it appears that a substantial expansion of output by the year 2000 is predicted, even in the most pessimistic forecasts. Depletion of s

    Jan 1, 1984

  • AUSIMM
    Technical Note - Rapid Production of High Quality Polished Sections for Automated Image Analysis of Minerals

    By Wittenberg J. C, Reid A. F

    A method is described for the rapid and effective production of polished section mounts of ore and mineral particulates to the standards required for automated image analysis. This requires mounting w

    Jan 1, 1984

  • SME
    Portable Rock Strength Tester And Economic Benefits Of Rapid Testing

    By Z. J. Hladysz

    The Hladysz Rock Tester was developed at the South Dakota School of Mines as a portable rock strength tester. The hand held device is placed against a rock surface and struck by a hammer. The impacted

    Jan 1, 1984

  • AIME
    Repository Exploration

    By David L. Pentz

    This paper discusses exploration objectives and requirements for a nuclear repository in the U.S.A. The importance of designing the exploration program to meet the system performance objectives is emp

    Jan 1, 1984

  • IIMP
    Comercialización de la plata

    By Charles Stahl

    El presente texto describe la comercialización de la plata a corto y mediano plazo. El periodo de corto plazo se refiere a cualquier negociación dentro de un período de 5 minutos y tres semanas, mien

    Jan 1, 1984

  • SME-ICGCM
    Stability of Slopes in Discontinuously Jointed Rock (4d3fd7d1-f3a8-44f5-b86c-03d96a9b1123)

    By T. M. Tharp

    Attempts to analyze the stability of slopes, foundations and underground openings in discontinuously jointed rock have generally assumed full joint continuity or ignored the role of stress concentrati

    Jan 1, 1984

  • SME
    An Empirical Relationship For Trona Mine Design

    By William G. Fischer

    This paper attempts to close the gap between extensive rock testing with field measurements and the mine operator's need for safe mine layouts and alternatives. It was found that many of the vari

    Jan 1, 1984

  • AIME
    Optimizing Grades of Coal Cleaning in Mineral Processing - Circuit Analysis (e548b55d-7923-4ea4-a114-14cbb89d7ef6)

    By T. P. Meloy

    Economic constraints require that the optimum mineral processing circuit be chosen for a given ore and then the circuit be optimized. Meloy (1983) developed a general methodology for finding the best

    Jan 1, 1984

  • AUSIMM
    Screening Efficiency Revisited

    As partition curves are widely employed to characterize screening efficiency which, by definition, should include a time parameter, it is shown, perhaps for the first time, that time is already in

    Jan 1, 1984

  • SME
    Current Approach To Mineral Exploration In The United States

    By Mark E. Emerson

    Foreign and domestic companies find the mineral potential of this country's stern public lands, its capital markets, political stability, and "open-door" policy attractive for hard mineral explor

    Jan 1, 1984

  • AIME
    Ore Zoning Applied To Geologic Reserve Estimation Of Molybdenum Deposits

    By D. E. Ranta, M. W. Ganster, A. D. Ward

    An ore zoning technique developed by Climax geologists during the past forty years has been used to contour drill-hole assay values on cross-sections for fourteen porphyry molybdenum deposits in weste

    Jan 1, 1984

  • SME
    Tailings Disposal And Reclamation Concepts At Two Diverse Locations ? I. Summary

    By O. K. Brown

    U.S. Borax has two tailings disposal requirements which are uniquely different in many respects, but with the common goal to minimize the impact on the environment, utilize dependable technology and m

    Jan 1, 1984