Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Overburden stripping using large slushersBy Lumley G, Rowlands D
The overburden slusher (OS) is proposed as a stripping tool that is expected to find application in overburden stripping operations including open cut coal and oil shale mines. OS is expected to comba
Jan 1, 1986
-
RI 9035 - Measurement of Dielectric Properties of Minerals at Microwave FrequenciesBy W. E. Webb
This report describes a method the Bureau of Mines devised for measuring the dielectric constant and loss tangent of low-loss minerals at microwave frequencies. Determina-tion of these properties make
Jan 1, 1986
-
The Weipa Kaolin ProjectComalco Limited has recently completed construction of a $50 million kaolin plant at the site of its bauxite mining and industrial minerals operation at Weipa. The plant will produce 100,000 tonne
Jan 1, 1986
-
Dewatering Investigation at Koolan IslandBHP Minerals Ltd operates an open cut iron ore mining operation on Koolan Island, off the coast north of Derby in the Kimberley region of Western Australia. The mine comprises a number of pits, the
Jan 1, 1986
-
Tecnical note-lineament guidelines to mine development: a continuing case history, northeastern QueenslandLANDSAT imagery has renewed interest in linear features first recognised by E. S. Hills in a physiographic model of Australia. Certain of these lineaments are aligned with structures which control min
Jan 1, 1986
-
Education and Research for the Mineral IndustryThe success of any industry depends on the planned integration of the policies and resources of the key components of the Australian economic and political structure - government, industry managemen
Jan 1, 1986
-
Regulation and the Regulatory Process in the Mineral IndustryBy F. C. Lendrum
"This paper had its origin in a panel discussion organized by the Canadian Uranium Producers Metallurgical Committee (CUPMC) at their Annual Meeting in Blind River in May, 1964. The reason for the pan
Jan 1, 1986
-
OFR-86-86 Development Of The Capacity To Assess Occupational Noise Overexposure In The Mining IndustryBy A. G. Galaitsis
This report summarizes the work performed under the USBM Contract No. J0245001. The purpose of this work was to expand and improve the scope and accuracy of the method developed under USBM Contract No
Jan 1, 1986
-
OFR-96-86 Flywheel-Powered Shuttle CarBy Donald Christofferson
This report documents the program conducted to demonstrate the application of a flywheel-powered propulsion system to underground mining shuttle cars. Such application can replace the present electric
Jan 1, 1986
-
OFR-21-87 Deserado Mine Computerized Monitoring And Control System EvaluationBy L. A. Eros
The U.S. Bureau of Mines and Western Fuels Utah, Inc. entered into an agreement to plan, install, and evaluate a micro-computer based monitoring and control system at Deserado Mine, an underground coa
Jan 1, 1986
-
IC 9086 Tin Availability-Market Economy Countries - A Minerals Availability AppraisalBy D. I. Bleiwas
The Bureau of Mines determined demonstrated tin resources and costs associated with tin production in order to evaluate the potential for tin production from 18 market economy countries (MEC's).
Jan 1, 1986
-
Data RequirementsBy Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg
GENERAL STATEMENT The primary objectives of any field data gath¬ering effort should be to (1) identify and gather the data necessary for the project and (2) obtain the data in a state-of-the-art mann
Jan 1, 1986
-
Appendix C - Relationship of UnitsBy Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg
Jan 1, 1986
-
Copper mineralization in the Patawarta Diapir, northern Flinders Ranges, South AustraliaBy Both R. A, Daily B
The Patawarta Diapir, located in the northern Flinders Ranges (South Australia), has intruded into late Proterozoic Wilpena Group sedimentary rocks. The diapir contains disrupted blocks of a wide vari
Jan 1, 1986
-
OFR-55-86 Improving The Performance Of Tunnel, Raise And Shaft Boring Machines For Coal Mine ApplicationsBy Levent Ozdemir
A 6-ft. diameter laboratory tunnel, raise and shaft boring machine was designed and constructed to carry out research investigations to enhance the performance of mechanical rock excavation equipment.
Jan 1, 1986
-
Experiences in Developing Applied Mining Research ContractsThe Australian Mineral Industry's growth in the last two decades is directly related to the skill and experience of its consultants in mining, metallurgy, geology, finance, management, marketing
Jan 1, 1986
-
IC 9074 - Underground Coal Mine Lighting Handbook (In Two Parts) 2. ApplicationBy W. H. Lewis
This Bureau of Mines report and its companion report (Information Circular 9073) have been prepared as a complete reference on underground coal mine lighting. This report discusses system design crite
Jan 1, 1986
-
IC 9065 - Evaluation Of Safety Shutoff Valve System On Methane Gas Pipelines Under Mine Fire ConditionsBy Thomas E. Marshall, Patrick A. Kinek, Gerald L. Finfinger
The purpose of this investigation was to evaluate the integrity of the existing shutoff valves and actuators used under high-temperature conditions in the Bureau of Mines' horizontal borehole met
Jan 1, 1986
-
RI 9038 Testing Materials for Support-Wall ConstructionBy Kenneth E. Hay
The Bureau of Mines collected coal and coal waste aggregate material from two different mine sites to determine their strength characteristics for use in concrete. The concrete would be placed undergr
Jan 1, 1986
-
OFR-7-87 Interaction Of Radio Transmissions On Mine Monitoring And Control SystemsBy Larry G. Stolarczyk
This report deals with the creation of an efficient method to determine if command, control, communication and monitoring (3cm) equipment in coal, metal and non-metal mines is susceptible to Radio Fre
Jan 1, 1986