Search Documents

Sort by

  • AUSIMM
    The Assessment and Optimization of Blasting

    Blasting is at first sight a simple operation. Blastholes are drilled in a suitable pattern, primed, charged with explosives, stemmed and finally the blastholes are connected together to give the ap

    Jan 1, 1988

  • AUSIMM
    Learning from Nuclear Waste Repository Design: the Ground-Control Plan (9344425e-0fdb-451a-8179-1134301c90ee)

    With mining development on hold and other underground works in a slowdown, the development of nuclear wa te repositories takes centre tage on the American rock engineering scene. Three repositorie for

    Jan 1, 1988

  • SME
    Loss of selectivity in apatite-dolomite flocculation

    By B. D. Shah, H. S. Soto

    Lack of selectivity in mixed mineral flocculation can be attributed to one or more of the following factors: dissolved ion interference, hetero- coagulation, mechanical entrapment in flocs, and entrai

    Jan 1, 1988

  • SME
    Ultrafine coal flotation by gas phase transport of atomized reagents

    By M. Misra, I. Anazia

    The dispersion of oily collector has a significant effect on the flotation recovery of ultrafine coal. Generally, reagent dispersion is accomplished by mechanical mixing and/or ultrasonic agitation, f

    Jan 1, 1988

  • SME-ICGCM
    Effect Of Longwall Mining Subsidence On The Stability Of Surface Slopes

    By John J. Bowders

    The stability of surface slopes undergoing subsidence due to longwall mining was investigated to examine the effect the subsidence had on the stability of the slopes. Stability analyses were performed

    Jan 1, 1988

  • AUSIMM
    Lithostratigraphic Approach to an Alluvial Goldmine: An Example from Scotland Point in Central Otago

    Gold bearing sediments at Scotland Point occur within the Quaternary Gibbston Fonnation, which underlies Cromwell Flat in Central Otago. Gibbston Fonnation unconformably overlies Teniary Manuherikia G

    Jan 1, 1988

  • NIOSH
    RI 9179 - A Method for Predicting Equilibrium Values in the Solvent Extraction of Copper in Ammoniacal Systems

    By D. N. Nilsen

    A mathematical modeling method was developed by the Bureau of Mines for the prediction of the principal equilibrium species in the solvent extraction of copper. The use of models for predicting the am

    Jan 1, 1988

  • AUSIMM
    Implications of High Productivity Long Wall Systems

    The areas of impact when employing high productivity long wall systems are reviewed and the financial implications of the most significant areas highlighted. A distinction has been made between av

    Jan 1, 1988

  • AUSIMM
    The History Of Coal Mining In The Hunter Valley Of New South Wales

    The development of the lower Hunter Valley, centred around Newcastle and its suburbs is closely linked to the mining of coal and the settlements which grew to house the colliery officials, the mine

    Jan 1, 1988

  • SME
    Practical aspects of corrosion in the wear of grinding media

    By D. M. Smith, M. J. Meulendyke, P. J. Moroz

    An extensive program of marked ball wear testing (MBWT), laboratory corrosion studies, and worn ball surface analyses has been used to gain insight about the role of corrosion in the overall wear proc

    Jan 1, 1988

  • AUSIMM
    Rational Longwall Layout Design Based on Numerical Stress Analysis

    By Klenowski

    Rational design of layouts for longwall operations is greatly facilitated by use of an accurate and economical method for predicting stresses and displacements. The displacement discontinuity meth

    Jan 1, 1988

  • CIM
    Use of fly ash in backfill at Kidd Creek Mines

    By T. R. Yu, D. B. Counter

    "In an effort to increase productivity, the use of fly ash as a binder for consolidated backfill was studied. From laboratory and underground tests f or its cementitious properties and environmental e

    Jan 1, 1988

  • ISEE
    Implementation of Blast Vibration Frequency Control Technology at R & F Coal Company

    By Doug Johnson

    This paper reviews the field implementation of R & F Coal's blasting optimization work concerning analysis, prediction, and control of overburden blasting vibrations using site specific measurements a

    Jan 1, 1988

  • SME
    Flowsheet auditing for improved metallurgical performance

    By D. Malhotra

    This paper discusses the need for periodic auditing of mineral processing flowsheets and the potential benefits a company can gain from a study of this nature. A carefully designed flowsheet audit can

    Jan 1, 1988

  • CIM
    The recovery and utilization of fine coal

    By W. L. Thayer, K. A. Jonasson, R. D. Coleman, J. D. Hazlett, C. E. Capes

    "Loss of coal fines in reject slurries limits the yield of coal cleaning operations. Difficulties in handling fines also limit the extent of physical cleaning in treating coals with finely-disseminate

    Jan 1, 1988

  • AUSIMM
    Water Management to Protect Wetland to the North of the Rhenish Lignite District

    By Trumpff H

    Opencast Lignite Mining requires topwall strata of seams to be fully depleted and footwall aquifers sufficiently depressurized. To prevent a spread of the cone of depression into protected wetlands

    Jan 1, 1988

  • SME
    Coal Recovery. From Refuse Ponds Employing Flotation Techniques

    By G. E. Wasson

    Coal in most refuse ponds including those owned by Consolidation Coal Company can be recovered by froth flotation techniques. Laboratory studies show that the flotation conditions required for coal re

    Jan 1, 1988

  • CIM
    Laboratory and pilot-plant beneficiation of chromite ore from Bird River, Manitoba (1247a540-347d-460b-96be-84ffa86f2377)

    By P. R. A. Andrews, I. Jackman

    "A mineral processing investigation to recover chromite was performed at Lakefield Research, under the guidance of CANMET personnel, on a 70 tonne ore sample from the Bird River deposit in Manitoba. I

    Jan 1, 1988

  • AUSIMM
    Parameters Affecting the Shield Support Efficiency in Longwall Mining

    By Hsiung SM, Jiang YM

    The orientation and location of the hydraulic legs are two very important parameters for the design of shield supports in longwall mining. Studies have shown that leg orientations and locations of

    Jan 1, 1988

  • CIM
    Maintenance Engineering - Failure and repair of a mine hoist drumshaft

    By James E. Rider

    "Fractures in mine hoist drumshafts are rare. We know of no previously reported attempts to repair a fractured drumshaft; any feasible method would involve welding and the associated problems of disto

    Jan 1, 1988