Search Documents

Sort by

  • SME
    Requirements And Quality Parameters Of Fluxed Iron Ore Pellets Used In The Federal Republic Of Germany

    By H. A. Kortmann

    Blast furnace operators have been steadily increasing their quality requirements on burden material. These requirements include a high reduction rate of the ore burden as well as good strength at the

    Jan 1, 1989

  • TMS
    Influence of Accelerated Electron Treatment on Mineral Processing

    By A. F. Sidorov

    A method of improving mineral recoveries from ores by modifying the physical and chemical properties of minerals using radioisotope radiation was tested. It was observed that irradiation modifies mine

    Jan 1, 1989

  • SME
    Indicator Conditioned Estimator (25d65824-d33d-4da1-8117-5abe26a82e3f)

    By H. Zhu

    Qualitative and interpretative information as obtained from geological and/or geophysical studies, in addition to precise measurement, is incorporated into the estimation process through an indicator

    Jan 1, 1989

  • SME-ICGCM
    Prediction of surface movement with emphasis on horizontal deformation due to mining

    By Mao Bai

    In predicting the integrity of under-mined structures, surface horizontal displacements and curvatures are frequently of greater importance than the more homogeneous vertical displacements. Accurate e

    Jan 1, 1989

  • SME
    Gold Recovery At Gold Fields - Chimney Creek

    By James R. Arnold

    Gold Fields Mining Corporation started processing ore from it's Chimney Creek operation in northern Nevada in November, 1987. Since that time production has averaged about 200,000 ounces per year

    Jan 1, 1989

  • SME
    The Fundamentals For An Expert System, Designed To Assist The Layout Planning Of Face Operations For An Underground Coal Mine

    By F. L. Wilke

    The prototype of an expert system, designed to assist layout planning of face operations, is presented. By specific combination of knowledge-based and conventional EDP techniques it has been possible

    Jan 1, 1989

  • SME
    Utilization Of Automation And Data Transfer In The Operation Of LHD Machines

    By Pentti Kallio

    From the aspect of economic feasibility of mining, ineffective use of expensive mechanization investments is becoming a problem. In many cases, the machinery is in operation only 50 - 60 % of the tota

    Jan 1, 1989

  • SME
    Pipe Heading In Highly Curved Routes Using As An Example The Nebensammler Neuland; Sections IV And V

    By Siegfried Zell

    Preface Pipe heading is a customary and proven technology for the underground installation of all types of piping. In over 90 % of all cases, straight pipe sections are used between shaft construct

    Jan 1, 1989

  • SAIMM
    SPOTLIGHT on Developments in Froth Flotation

    The International Colloquium on Developments in Froth Flotation, which replaced the Annual University of Cape Town (UCT)/University of Stelenbosch (US) Minerals Processing Symposium, was held at the V

    Jan 1, 1989

  • NIOSH
    RI 9260 - Effect of Energy and Impact Direction on Coal Fragmentation

    By Jon I. Voltz

    The U.S. Bureau of Mines has conducted fundamental coal fragmentation studies to evaluate the effects of impact energy and direction of bedding planes on dust generation, size distribution, and impact

    Jan 1, 1989

  • AUSIMM
    Determination of Noble Metals at Crustal Abundances

    By Ryan CG, Cousens DR, Suter GF, Griffin WL

    A novel method utilizing PIXE with microbeams following fire-assay has been developed to determine PGE and Au at sub-ppm levels suitable for application in exploration. Analyses of the prills from

    Jan 1, 1989

  • NIOSH
    Indentification of Fracture in Coal by AE in Dynamic Test

    By A. Wahab Khair, S. Jung

    "This paper deals with the fracturing process of laterally confined blocks of coal subjected to impact indentation. During the test, blocks of coal with approximate dimensions of 10 in. x 10 in. x 6 i

    Jan 1, 1989

  • SME
    AMAX Belle Ayr Coal Drying Facilities

    By Thomas J. Lien

    AMAX Coal Company has constructed the first commercial demonstration sub-bituminous coal dryer at its Belle Ayr Mine south of Gillette, Wyoming. This 215 ton per hour facility is projected to produce

    Jan 1, 1989

  • NIOSH
    RI 9259 - Impact of Water Sprays on Scrubber Ventilation Effectiveness

    By Jon C. Volkwein

    The U.S. Bureau of Mines conducted a study to assess the impact of a directional water spray system on a unique single inlet dust scrubber on a low-profile mining machine. Tests were conducted in a fu

    Jan 1, 1989

  • SME
    Improved Face Ventilation Techniques Reduce Quartz Dust Levels On Continuous Mining Operations

    By Robert A. Jankowski, Charles A. Babbitt, Natesa I. Jayaraman

    Today, approximately 31% of underground coal mining operations have designated occupations or areas with more stringent (below 2.0 mg/m3) respirable dust standards in place. Many U.S. coal mines have

    Jan 1, 1989

  • DFI
    Instrumented Driven Steel Tube Piles At Canary Wharf, London

    By A. R. Gaba

    Phase I of the Canary Wharf development in London's docklands involves the construction of six fifteen storey buildings located predominantly over water of the West India Docks. The buildings are

    Jan 1, 1989

  • SME
    Off-Highway Vehicles Monitoring At Surface Coal Mines In Western Canada

    By J. K. Szymanski, Val Srajer

    In this decade mining companies in western Canada have searched for reliable and inexpensive ways to improve mine productivity. Truck dispatching systems, equipment vital sign monitoring and sensing,

    Jan 1, 1989

  • CIM
    Maintaining a successful loss prevention program

    By G. R. Larocque

    "The Loss Prevention Program and management style applied at Kidd Creek enabled them to maintain a 1.02/200 000 man-hours accident frequency over a 20-year period. Falconbridge Limited, Kidd Creek Div

    Jan 1, 1989

  • AUSIMM
    Achieving Acceptable Dredge Availability at Grey River Gold Mining Limited

    The achievement of high availability of the Grey River Gold Mining Limited's alluvial gold dredge is a tortuous task which will rely upon the dedication of all staff employed at Grey River Gold M

    Jan 1, 1989

  • SME
    Design And Construction Of The Keystone Tunnel Widening Project

    By Stephen J. Klein, Fernando Orduz, Randall J. Essex

    INTRODUCTION The Keystone Tunnel project consists of widening an existing 7.3 m-wide (24 ft) highway tunnel to a width of 13.7 m (45 ft) to provide a three-lane, two-directional highway tunnel. The

    Jan 1, 1989