Search Documents

Sort by

  • NIOSH
    RI 9279 Yielding Steel Posts

    By J. P. Dunford

    This U.S. Bureau of Mines report describes the development of a yielding steel post for underground mine support. The report covers concept development, laboratory tests, modifications, and field eval

    Jan 1, 1989

  • SME
    An Introductory Review - Investment and Project Evaluation

    By R. V. Ramani

    It is common knowledge that there is an endless stream of possibilities, proposals, and projects - each representing a demand on available capital - for improving the mining company's performance

    Jan 1, 1989

  • AUSIMM
    The Effect of Sulphide and Lead on the Rate of Cold Cyanidation

    By Tumilty JA, Schmidt CG

    Sulphide ion is a powerful poison in gold cyanidation, however, the detrimental effect is less severe in plant practice. This is thought to be due to the presence of depassivating elements in the o

    Jan 1, 1989

  • SME
    Mine And Surface Facility Closure

    By D. H. Warren

    This presentation we hope will provide you with an orderly approach co mine and surface plant closure taken from our experience over the past several years on six different projects within the intermo

    Jan 1, 1989

  • SME
    Discussion – In situ leaching of disseminated gold deposits—geological factors by J. G. Wargo Technical Papers, MINING ENGINEERING, Vol. 40, No. 10 October 1988, pp. 973-975

    By J. D. Megeath

    In the October 1988 issue of MINING ENGINEERING, J.G. Wargo's paper discusses the problem of measuring and analyzing permeability, porosity, and fracturing in its relation to in situ leaching of

    Jan 1, 1989

  • SME-ICGCM
    Supercomputer Assisted Three-Dimensional Finite Element Analysis Of A Longwall Panel

    By Duk-Won Park

    The excavation of a longwall panel causes a continuous stress redistribution in the surrounding strata for every face advancement. The understanding of the behavior of rock to high level of stresses i

    Jan 1, 1989

  • AUSIMM
    Ballymoney Lignite Deposit

    This paper presents an overview of the strategy adopted to bring the Ballymoney opencut lignite deposit to an advanced stage of mine design and confidence. Certain aspects of the project differentia

    Jan 1, 1989

  • SME-ICGCM
    Cavability Investigation Of A Stratabound Copper Deposit, Tong Kuang Yu Mine, Shanxi Province, China

    By W. C. Lacy

    Stratabound copper ore bodies in thick Proterozoic metamorphosed sedimentary and volcanic rocks at the Tong Kuang Yu Mine in southern Shanxi Province of China were considered as possibly being amenabl

    Jan 1, 1989

  • SME
    A Data Base For Failure And Non-Performance Analysis Of Mining And Construction Equipment

    By Lawrence Adler

    [An innovative framework is proposed which most efficiently and systematically handles the large quantity of information needed for equipment failure and other non-performance analyses. It is based on

    Jan 1, 1989

  • NIOSH
    The Chemical Properties of Silica Particle Surface in Relation to Silica-Cell Interactions

    By X. N. Hu, X. Shi, V. Vallyathan, N. S. Dalai

    "Although silicosis has been studied extensively, the mechanism is still not fully under stood. Experiments do provide evidence that the actions of unique properties of silica surface on the cell memb

    Jan 1, 1989

  • TMS
    Preparation Of High Purity Scandium Oxide By Extraction Chromatography

    By Guo Gongyi

    An extraction chromatography by which 99.99 % pure scandium oxide can be prepared from the starting materiel containing about 70% scandium oxide has been developed by taking advantage of some peculiar

    Jan 1, 1989

  • SME
    A Solution To The Problem Of Scheduling And Replacement In Open-Pit Mines

    By Qing Wang

    A longterm overburden removal plan can be realistic and optimum only when the cost and capacity profiles off the equipment assigned to the operation are taken into consideration. Therefore, the planni

    Jan 1, 1989

  • SME
    Support Characteristics Of In-Cycle Roof Trusses (A Photoelastic Analysis) (833371b9-62db-43ad-a16e-cb19cfdf5c2a)

    By Jr. Gambrell

    Support characteristics of in-cycle trusses are analyzed using a photo-elastic model loaded by tightening a truss in the sequence normally used in an underground mine. Stresses in the roof at its cent

    Jan 1, 1989

  • AUSIMM
    The Assessment of Cast Blasting Practices Using Monitoring Techniques

    By Moxon N. T, Berndt J. R

    BHP-Utah Coal Limited's Peak Downs Mine is located in Cen- tral Queensland, approximately 200 km south west of Mackay. The annual raw coal production of the mine is over 8 million tpa, requirin

    Jan 1, 1989

  • CIM
    Microsilica dust in the ferrosilicon industry

    By M. A. EI Zeky, A. E. El-Nikbaily, M. A. Shahin

    "Possible mechanisms of microsilica dust formation and factors affecting its quantity have been discussed. General mathematical models to predict the dust quantity based on electrical and coke consump

    Jan 1, 1989

  • RMCMI
  • AUSIMM
    Expert Reports and NCSC Policy Release No. 149

    It's my privilege to welcome you here this afternoon on behalf of the Sydney Branch of the Australasian Institute of Mining and Metallurgy. This is a most important gathering. You, the delegate

    Jan 1, 1989

  • SME
    Optimum Use Of Diamond Wire Equipment In Stone Quarrying

    Diamond wire rock cutting is the most widely used technology in carbonate stone quarrying owing to technical performance and block face quality. Interest is also growing for siliceous deposits. This p

    Jan 1, 1989

  • DFI
    Design, Construction And Applications Of Auger Piling System For Earth Retention And Underpinning Of Structures

    By A. A. Gupte

    Auger piling system which was developed in the United States in the 1940's is gaining acceptance in many parts of the world. Although primarily used to support foundations, the system is very use

    Jan 1, 1989

  • SME
    Column Flotation Of Western Phosphate Ores

    By Samuel Polinsky, Lawrence W. Bierman, Wayne Perkins

    [A column float beneficiation plant using 9, 8.5 foot diameter, cells was constructed by the Simplot Company and the Smoky Canyon Facility in the fall of 1986 and has been in operation since May of 19

    Jan 1, 1989