Search Documents

Sort by

  • AUSIMM
    The Art of Coarse Mining (9bfbf208-e7d5-4f60-88bb-3a72fd04f1a8)

    As an Inspector of Mines in Queensland, my main responsibilities include the enforcement of the Mining Act 1968 - 1986, the Mines Regulation Act 1964 - 1989 and the Metalliferous Mining regulations 19

    Jan 1, 1990

  • ISEE
    Pre-Split Economics and Practice at Gold Fields Operating Co. - Chimney Creek Mine

    By Lyle Avey

    For the purpose of this paper, testwork and general pre-splitting practice will be discussed for the Chimney Creek Mine.

    Jan 1, 1990

  • AUSIMM
    The Effect of Detonator Strength on the Initiation of Small Diameter Emulsion Explosives

    By Kerr I. D, Kennedy M

    Flash X-radiographs were obtained of commercial electric No 6 and No 8* strength aluminium tube detonators in small-diameter cartridges of emulsion explosive at various times after fusehead operatio

    Jan 1, 1990

  • AUSIMM
    Sources of Ore-Forming Materials of the Changpo Carbonate Replacement Tin Deposit in the Dachang Tin Field: Evidence from Oxygen, Carbon and Hydrogen Isotopes

    By Gray J, Krouse HR, Changkakoti A, Kwak TAP

    The Dachang tin field with more than one hundred million tonnes of ore at 1% tin and 3% Zn is one of the largest tin fields in the world. It comprises five carbonate replacement tin deposits, of which

    Jan 1, 1990

  • SAIMM
    A pre- burial adsorption model for the genesis of gold in the Witwatersrand

    By R. J. Davidson

    The chemistry related to the adsorption of gold, uranium, and transition-metal ions onto algal biomass (activated carbon) is related to the genesis of the Witwatersrand. Detrital gold being washed int

    Jan 1, 1990

  • SME-ICGCM
    Application Of Short-Term Time-Dependent Plate Loading Tests For Estimation Of In-Situ Elastic And Viscous Parameters Of Weak Floor Strata

    By Gang Chen

    This paper explores the possibility of using short-term time-dependent plate loading tests to estimate the elastic and viscoelastic parameters of the weak floor strata typically associated with coal s

    Jan 1, 1990

  • AUSIMM
    Development of a Dynamic Blasting Simulation

    Blasting, particularly bench blasting, uses finite length cylinders of explosive close to two free faces. The rock to be blasted is usually intersected by a complex 3-D system of joints. To fully si

    Jan 1, 1990

  • NIOSH
    ESR Spin Trapping Detection of Hydroxyl Radicals in the Reactions of Cr(V) Complexes with Hydrogen Peroxide

    By N. S. Dalal, Xianglin Shi

    "Electron spin resonance (ESR) measurements provide direct evidence for the involvement of Cr(V) in the reduction of Cr(VI)· by NAD(P)H. Addition of hydrogen peroxide (H2 O 2) to NAD(P)H-Cr(VI) reacti

    Jan 1, 1990

  • NIOSH
    Computer Program For Seismic Signal Analysis - Objective

    Develop personal computer (PC) based software for analyzing and/or filtering time- and frequency-domain attributes of seismic and electromagnetic signals from geophysical surveys for the enhanced inte

    Jan 1, 1990

  • SME
    Advanced Froth Flotation -A Cost Effective Tool for Reducing An Acid Rain Precursor?

    By K. E. Harrison

    Acid rain legislation as proposed by President Bush [1], if enacted, will immediately refocus current thinking on the economic decision-making as related to coal preparation facilities. Unit operation

    Jan 1, 1990

  • SME
    Characterization Of Carbon In Sediment-Hosted Disseminated Gold Deposits, North Central Nevada

    By Albert Hofstra, Joel Leventhal

    The gray, dark gray and black colors of the sediments and the presence of pyrite in the Carlin, Jerritt Canyon, Horse Canyon, Betze, and Gold Acres sediment-hosted disseminated gold (SHDG) deposits in

    Jan 1, 1990

  • SME
    Selective flotation of fossil resin from Wasatch Plateau high- volatile bituminous coal

    By Y. Ye, J. D. Miller

    Certain bituminous coals are known to contain appreciable quantities of natural fossil or subfossil resin. Such resinous coals are found in the western US, particularly the Wasatch Plateau coalfield o

    Jan 1, 1990

  • SAIMM
    SPOTLIGHT on 100 years of coal mining in Witbank

    By K. W. Falconer

    The Witbank-Middelburg Branch of The South African Institute of Mining and Metallurgy celebrated 100 years of coal mining in the Witbank area with a function held at Douglas Colliery on the 5th Decemb

    Jan 1, 1990

  • NIOSH
    Appraisal Of Selected Mineral Resources Of The Black Hills National Forest, South Dakota And Wyoming

    By Joseph Gersic

    In 1989-90, the Bureau of Mines appraised selected high resource potential areas containing gold, rare-earth-element, or pegmatite deposits in or near the Black Hills National Forest. Available minera

    Jan 1, 1990

  • AUSIMM
    The Selection and Management of Contractors

    The mining industry in Australia frequently uses the services of specialist engineering and managing contractors and consultants for a majority of the work required for project development, from fea

    Jan 1, 1990

  • AUSIMM
    The Hellyer Mine - Feasibility to Production with Confidence

    For its Hellyer project, Aberfoyle sought to establish a high degree of confidence in all aspects of the feasibility study. Accurate capital and operating cost estimates were an integral and essenti

    Jan 1, 1990

  • SME-ICGCM
    Birth Of A Longwall-Initial Planning To Post-Subsidence Mitigation

    By E. D. Doney

    The Kerr-McGee Coal Corporation's Galatia Mine's first longwall mining system was implemented on May 3; 1989. Start-up of the longwall face represnted the successful conclusion of an effort

    Jan 1, 1990

  • AUSIMM
    Some Problems Associated with Standard Charge Weight Vibration Scaling Laws

    The standard charge weight scaling laws imply that only one particular delay (that possessing the maximum instantaneous charge) contributes to the ppv. However, the present analysis clearly demonstr

    Jan 1, 1990

  • DFI
    Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, Washington

    By David G. Winter

    The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t

    Jan 1, 1990

  • CIM
    Energy management system at Falconbridge Limited, Onaping Operation

    By D. W. Euler, B. J. Clauzier

    "Implementation of an effective energy management system will reduce energy costs without impacting negatively on production.The energy management system must be designed to complement the operation a

    Jan 1, 1990