Search Documents

Sort by

  • TMS
    Computer Aided, Flash Radiographic Analysis of Shaped Charges

    By Richard L. Summers

    The shaped charge has proven in various military and industrial applications to be an effective penetrator of materials. Upon initiation a detonation wave traverses the explosive billet, collapsing a

    Jan 1, 1992

  • ISEE
    Calculating Blasting Effects to Nearby Underground Pipelines

    By Janice K. Means

    The purpose of this paper is to provide the seminar attendee with: information on pipeline construction, operation and standards to better equip him (or her) to analyze the ultimate effect of blasting

    Jan 1, 1992

  • ISEE
    Determination of the Initiation Strength of Commercial Detonators Using an Adjustable-Sensitivity Liquid Explosive

    By J Edmund Hay, T S. Bajpayee

    The Bureau of Mines is developing a test to determine the initiating strength of commercial detonators. Various tests of "detonator strength" are in use, but many of them do not correlate well with ea

    Jan 1, 1992

  • TMS
    Improved Converter Control

    By J. -P. Nepper

    It has been possible to largely contain converter aisle emissions of SO2 and fumes in the case of batch-wise operated Peirce Smith converters during normal blowing periods with the help of suitably de

    Jan 1, 1992

  • AUSIMM
    Detailed Underground Measurements of Roof Deflection and Bed Seperation

    By Prohaska G, Jackson F, Jack B

    To learn more about the fundamental roof behaviour in South African coal mines, accurate underground measurements of roof deflection were conducted in bord and pillar panels during development and

    Jan 1, 1992

  • SME
    Techniques for Estimating the Amount of Grain-Boundary Fracture During Comminution Of Mineralogical Materials

    By R. P. King

    Direct observations of intergranular fracture during comminution are very difficult to make. The best indirect method is based on the measurement of interphase area before and after comminution. If in

    Jan 1, 1992

  • SME
  • SME
    Estimating The Quartz-Related Fibrogenic Potential of Respirable Coal Mine Dusts (92e23e23-73fc-4e2f-9332-c69faab896cf)

    By William E. Wallace, Larry Grayson, Thomas Simonyi, Joel C. Harrison

    Application of an SEM-based methodology suggests a reason for past contradictory results on the relationship between quartz and coal workers' pneumoconiosis (CWP). Results indicate that coal seam

    Jan 1, 1992

  • AUSIMM
    Experience at Goonyella/Riverside Mine with a Bucket Wheel Excavator System and Shovel/Truck Systems for Prestripping Overburden

    A conventional Bucket Wheel Excavator (BWE) system with conveyor transport, mobile tripper and spreader was commissioned at the Goonyella Mine in 1982. The system was introduced to prestrip ahead of d

    Jan 1, 1992

  • AUSIMM
    Developments to Enhance the Productivity and Cost-Effectiveness of Large Rotary Blasthole Drills

    The on-going technical developments to enhance the productivity and cost effectiveness of large blasthole drills incorporate many of the blasthole drilling operating experiences garnered over the past

    Jan 1, 1992

  • SME
    Discussion - Short Scale Spatial Variability Of Sulfur In A Coal Seam

    By R. W. Barbaro, R. V. Ramani, K. V. K. Prasad, P. T. Luckie

    Discussion by A. Unal Barbaro et al. (1990) implemented a tedious study aimed at delineating the short-scale spatial variability of sulfur in a coal seam. It is not possible, however, to extend the

    Jan 1, 1992

  • AUSIMM
    Assaying Cyanide-Extractable Gold Within an Hour, and Addressing Effects of Preg-and Assay-Robbing

    Cyanide-extractable gold is far more meaningful in the definition of ore, and control of extraction, than fire- assayable or aqua regia digestible gold. The use of cyanide- extractable gold addresse

    Jan 1, 1992

  • SME
    The Use Of Multiple On-Line Ash Analyzers For Quality Control Of Coking Coal And Power Station Coal Production At Grootegeluk Coal Mine

    By Thomas de Lange

    Extensive test work performed on the Coalscan 3500 ash analyzer at the Grootegeluk Coal Mine has led to the successful implementation of on-line ash monitoring to control the quality of coking coal an

    Jan 1, 1992

  • SME
    Evaluation Of A Prototype Expert System For Configuring Underground Coal Mines

    By A. J. Basu

    A prototype expert system for planning and designing underground coal mines has been developed in a doctoral study (Basu, 1991) at the University of Kentucky (U.K.). The objective of the study was to

    Jan 1, 1992

  • SME
    Ground Water Effects

    By W. M. Ma, Daniel W. H. Su, K. Centofanti, Yi Luo, W. L. Zhong, Syd S. Peng

    10.1 I~RODUC1'ION In order to understand the effects of surface subsidence due to underground mining on the ground water hydrology, a brief introduction to the rate, direction, and general patte

    Jan 1, 1992

  • NIOSH
    Mineral Appraisal Of San Juan National Forest, Colorado

    By John T. Neubert

    Between 1988 and 1990, the U.S. Bureau of Mines studied the mineral resources of San Juan National Forest to appraise and determine types and locations of deposits that could be mined economically now

    Jan 1, 1992

  • SME
    Ore Controls At The Cyprus Pinos Altos Cu-Zn-Ag Skarn Deposit, New Mexico

    By M. W. Osterberg

    The Cyprus Pinos Altos mine exploits small high grade Cu-Zn skarns using trackless equipment and a modified room and pillar mining method. The skarns occur around early Laramide diorite and quartz m

    Jan 1, 1992

  • SME
    Troy Talc: An Old Deposit-A New Development (035a86cd-9a75-4850-ab13-3c63c8ba866a)

    By L. P. Meade

    The need to feed an established talc mill from a crude are source located closer to the mill prompted the drilling in 1986 of a previously mapped talc-carbonate deposit. This talc-bearing rock had nev

    Jan 1, 1992

  • SME
    Investigation Of A Large-Scale Coal Pillar Failure

    By N. S. Tanious

    This paper summarizes results from an investigation into possibly the largest coal pillar failure in the USA. The newly opened coal mine worked an 3.35 m (11 ft) seam under overburden depth that range

    Jan 1, 1992

  • SME
    Correlations of Grinding Mill Structural Design Procedures

    By V. Svalbonas

    When the Trelleborg Divisions of Boliden Allis and Mineral Processing Systems (MPSI) merged, a unique opportunity occurred for two independent mill fabricators to compare design pro¬cedures and the re

    Jan 1, 1992