Search Documents

Sort by

  • SAIMM
    Current South African Coal Pillar Research

    By B. J. Madden

    Over 206 million tons of hard coal were mined in South African collieries in 1996. Some 132.5 millions tons came from underground operations and approximately 120 million tons came from bord-and-pilla

    Jan 1, 1998

  • ISEE
    Five Years Experience with the Dynatronic Electronic Firing System

    By Rolf Koenig

    After the Dynatronic firing system was demonstrated for the first time at the SEE conference in Miami in 1987, it was officially approved in Germany at the beginning of 1993. Dynatronic has now been o

    Jan 1, 1998

  • TMS
    Valley Leach Facility Design Considerations For Cyanide Containment

    By Terry Mandziak

    Typical leach mine operations recover gold values through the application of a dilute cyanide solution onto ore within an engineered facility. Key to the success of mining operations is the, containme

    Jan 1, 1998

  • ISEE
    Development of the Remote Controlled Blasting System for Tunnel Construction

    By Minoru Kawamura, Yukio Kato, Yoshikazu Hirosaki, Satoru Suzuki

    A wireless blasting system for tunnel construction which consists of a loop antenna, oscillator and blaster, has been developed. The basic technology of this method had been studied in the 1970s to de

    Jan 1, 1998

  • SME
    Overall Process Effectiveness in industrial Complexes

    By Patrick Ph. D. Kennedy, Osvaldo A. Ph. D. Bascur

    With the revolutionary progress in information and computer technologies, applying the latest information technologies in metallurgical complexes has become a serious challenge to both a major opportu

    Jan 1, 1998

  • TMS
    Flash Smelting Behavior Of Various Copper Concentrates In A Pilot Scale Furnace

    By Nobumasa Kemori

    Six kinds of copper '90ncentrates. were treated individually in a ,pilot scale. Outokumpu flsah smelting furnace ~n order to study their ?flash smelting behavior with respect to oxygen efficiency

    Jan 1, 1998

  • CIM
    The Specogna Gold Deposit: A Late Tertiary, Low-sulfidation Epithermal Hot Spring Deposit, Graham Island, Queen Charlotte Islands, British Columbia, Canada

    By Richard J. Haslinger, C. Mark Rebagliati, James L. Oliver

    Abstract - Exploration at the Specogna gold deposit has identified a geological resource of 65.0 Mt grading 1.63 g/t Au, which equates to 3 million ounces of contained gold. This resource is hosted in

    Jan 1, 1998

  • SME
    Where Have All the Processing Plants Gone?

    By Joel Lenz, Warren Hood, Jackson Jenkins

    Whole ore or other process streams are being transported from mines to remote processing facilities for multiple reasons, such as improved project economics, maximum utilization of capital, and minimi

    Jan 1, 1998

  • AUSIMM
    Co-Disposal of Coarse Coal Reject with Sand Mining Reject for the Control of Metal Concentration in Runoff Water

    By McQuade CV, Riley SJ

    Acid mine drainage is an unavoidable consequence of some coal mining operations. Typically runoff pH is below 3.5 and at these pH levels heavy metals are mobilised. Leachate from coal reject dumps may

    Jan 1, 1998

  • TMS
    Recycling Zinc Recovered from Electric Arc Furnace Dust: Is There a Better Way?

    By Larry M. Southwick

    Steel mill electric arc furnace dust is a RCRA listed hazardous waste and its treatment and/or disposal are regulated by a complex set of rules. These regulations were originally established to encour

    Jan 1, 1998

  • CIM
    Practical Quality Control Procedures in Mineral Inventory Estimation

    By Scott D. Long

    "Abstract-Grass roots exploration has an emphasis on good precision at low (sub-economic) concentrations of an element, in order to identify "anomalies" which may lead to drilling targets. Although it

    Jan 1, 1998

  • SME
    Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope

    By J. F. Able, F. Djahanguiri

    The US Bureau of Mines conducted research on underground stope leaching of metalliferous ores. Leaching underground would minimize the environmental impact of ore processing on the surface and would m

    Jan 1, 1998

  • TMS
    Metals Recycling from Electronic Scrap by Air Table Separation-Theory and Application

    By Shunli Zhang

    Metals recovery from electronic scrap by physical separation may provide an alternative to the current recycling approach, through which halogenated flame retardants can result in hazardous dibenzo-p-

    Jan 1, 1998

  • SME
    Improvement Of Longwall Bit Design

    By S. S. Peng, Luo. Y.

    In a shearer longwall mining operation, the longwall hits are responsible for breaking into and chipping the broken coal blocks away from the coal face. However, underground observations found that th

    Jan 1, 1998

  • AUSIMM
    JKSimFloat - A Tool for Flotation Modelling

    By R D. Morri, D J. Alexander

    The design and optimisation of mineral flotation circuits is currently performed using a combination of laboratory, pilot plant and full scale testing. Owing to the variable nature of flotation circui

    Jan 1, 1998

  • AUSIMM
    Mechanics of Rock/Tool Interaction in Disc Rock Cutting

    By M Hood, X S. L, W J. T Daniel, H Gurgenci

    It is believed that disc cutter shape affects rock fracture and therefore cutter performance and cutter life. However, the current generation of disc cutters is made of hardened steel and these cutter

    Jan 1, 1998

  • AUSIMM
    Application of the ISAMILL (A Horizontal Stirred Mill) to the Lead-Zinc Concentrator (Mount Isa Mines Ltd) and the Mining Cycle

    By B Cronin, M Gao, M F. Young

    Fine grinding technology has become extremely important for Mount Isa Mines Limited in the last decade for flowsheet development for the McArthur River deposit and in rejuvenating the Lead-Zinc Concen

    Jan 1, 1998

  • SME
    Geometallurgical Studies for the Mineração Rio Do Norte Bauxites Plateau Saracá III, Brazil

    By M. A. S. Martins, H. Medeiros, B. Y. B. Dos Santos

    This paper contains the geometallurgical studies, performed for Mineração Rio do Norte bauxites, applied to a selected area belonging to Plateau Saracá III, referring to an exploitation period of one

    Jan 1, 1998

  • TMS
    Design And Construction Of The Noranda Converter At The Borne Smelter

    By Michel Boisvert

    Noranda Metallurgy is presently completing construction of the new Noranda Converter (NCV) at its Home Smelter in Rouyn-Noranda. This capital investment of CDN$56M is the continuation of the Emissions

    Jan 1, 1998

  • TMS
    Degradation Of Cyanide And Metal-Cyanide Complexes By Bacterial Consortia

    By Garth James

    Bacterial consortia capable of degrading cyanide and metal-cyanide complexes were obtained from gold mine process waters using enrichment cultures. The cultures contained either cyanide, tetracyanonic

    Jan 1, 1998