Search Documents

Sort by

  • AUSIMM
    Pound Road Quarry: An Example of Sustainable Management

    By A McDowell

    Pound Road Quarry is an alluvial gravel quarry owned and operated by Fulton Hogan Ltd. for the supply of aggregate in Canterbury, and is the largest quarry in the South Island in terms of production.

    Jan 1, 1998

  • CIM
    Contrasting Styles of Gold Mineralization along the Grand Pabos-Restigouche Fault System: Implication for Carlin-like Au-mineralization in the Southwestern Gaspé Appalachians

    By André Chagnon, Michel Malo, Benoît Dubé, Chantal Pelchat

    "Abstract- In the southern Gaspé Appalachians, gold mineralization is spatially associated with the Acadian dextral strike-slip Grand Pabos-Restigouche fault system. Two different structurally-control

    Jan 1, 1998

  • AUSIMM
    The Use of Risk Analysis in the Selection of a Mining Method

    It is very rare in the underground hard rock environment to find a deposit that is ideally suited to a specific mining method. Usually the irregular shape of the orebody will allow the deposit to be e

    Jan 1, 1998

  • AUSIMM
    Rapid Generation of Control Charts for Analysis of Complex Gas Mixes in Crisis Situations

    By Jacobs M

    After a methane explosion in a coal mine a pre-determined crisis management procedure is instigated. As the process rapidly evolves the inevitable question arises - are personnel trapped underground,

    Jan 1, 1998

  • SME
    Integration Of Real-Time Survey, Mine Planning Software, GIS & Machine Control GPS For Mining Operations Management

    By Barry A. Hillman

    The rapid evolution of computer and field sensor technology is now providing the ability to integrate mine and office operations. Digital maps and mine plans as well as CAD and GIS can be transferred

    Jan 1, 1998

  • AUSIMM
    Improved Recovery in Highwall Mining using Backfill ACARP Project C3052

    By G K. Searle

    In Australia, coal mines have generally not adopted filling to increase mining recovery. The aim of this project, entitled æImproved recovery in highwall mining using backfillÆ, was to examine the fea

    Jan 1, 1998

  • CIM
    The BHP NWT Diamonds Project Diamond Processing in the Canadian Arctic

    By M. G. Rylatt, G. M. Popplewell

    "Production from Canada's first diamond mine is planned for the last quarter of 1998. The climatic conditions and the variation in kimberlite types to be treated have lead to the development of a comp

    Jan 1, 1998

  • AUSIMM
    Development, Application and Potential of a Real - Time Return Gas Monitoring System

    By Williams RJ

    This paper presents an overview of the design and development , application to date and potential of a real-time return gas monitoring system.Initially developed as an ACARP/Industry funded project, w

    Jan 1, 1998

  • AUSIMM
    The Implementation of Paste Fill at the Henty Gold Mine (e808b65b-096a-41b0-a461-dc39eb272114)

    By Jardine G, Woodall C

    The Henty Gold Mine, located in Western lasiuania use, uuiusatise solutions to effectively manage a mining operation in an environmentally sensitive setting and has been presented with several envir

    Jan 1, 1998

  • SME
    Quarry Reclamation And Reversionary Value

    By E. G. Hoover

    In the mid-I 970s the rallying cry sent out by the aggregate trade associations to aggregate operators was to come to Washington and help design national legislation mandating reclamation of pits and

    Jan 1, 1998

  • SME
    The Transition From Maintenance to Capacity Assurance

    By Craig Ammar

    JAMIE DAVIS: Our next speaker is Craig Ammar. He's director of equipment management for Cyprus Climax Metals Company. He has, prior to this assignment, been responsible for maintenance at Bagdad

    Jan 1, 1998

  • AUSIMM
    Determining the Deportment of Minor and Trace Elements in Base Metal Concentrates, with an Example from Broken Hill

    By F Radke, P A. Tilyard

    Determination of the mineralogical location (deportment) of minor and trace elements (including credit and penalty elements) in base metal concentrates can indicate whether further processing is likel

    Jan 1, 1998

  • SME
    Modeling Of Gold Elution From Activated Carbon Using A Modified AARL Process

    By G. Banini

    A plug-flow model is described for the reactor mass balance of a typical AARL gold elution process. The model is in the form of a hyperbolic differential equation and was transformed using the method

    Jan 1, 1998

  • SME
    The Viability of Metals & Recycling Under Global Environmental Restriction

    By William H. Dresher

    World trade has increased significantly during the last quarter century. However, a new rational for protectionism is emerging which argues for the restriction of trade as a means of preserving and pr

    Jan 1, 1998

  • SME
    Pit Lake Water Quality In The Western United States: An Analysis Of Chemogenetic Trends

    By L. E. Eary, Andy Davis

    The evolution of pit lake water quality depends on the lithology and hydrologic characteristics of the ultimate pit surface, the availability of buffering capacity in the wall rock vs. oxidizable sulf

    Jan 1, 1998

  • SME
    Sharing 2D And 3D Data Between GIS And Mine Planning Software

    By D. Elroi

    This paper addresses the sharing of 2D and 3D data between GIS and mine planning software. Two-dimensional (2D) data, and now three-dimensional (3D) data as well, can be formatted such that both types

    Jan 1, 1998

  • SME
    Numerical Simulation For Mine Dewatering In An Opencast Coal Mine

    By H. Huang, J. C. Wu, C. H. Xie, Y. Q. Xue, Z. H. Zhang

    Two- and three-dimensional groundwater flow models for dewatering in an opencast mine are presented. The models focus on solving special problems using numerical simulations of the opencast mine. Thes

    Jan 1, 1998

  • AUSIMM
    Fine Coal Dewatering by Compaction in Bins Exhibiting Reliable Discharge

    This paper firstly reviews the requirements for container and hopper design for reliable discharge. Discussion is then directed to the evaluation of the consolidation stresses acting in both in both t

    Jan 1, 1998

  • AUSIMM
    Implementation of a Heuristic Algorithm to Optimise Stope Limits with Excel Modules

    By Baafi E. Y

    A heuristic approach for the optimisation of the stope geometry is presented. The heuristic method uses economic model of a given deposit to search for the best combination of mining blocks that res

    Jan 1, 1998

  • AUSIMM
    Dragline Digging Methods in Australian Strip Mines - A Survey

    By Baafi EY

    Open cut mining in Australia is facing the greatest challenge in its history in attempting to compete not only with other operations internationally, but also with underground operations domestically.

    Jan 1, 1998