Search Documents

Sort by

  • SME
    Dewatering Solutions to Groundwater Control and Environmental Problems — Sheppard Subway Expansion — Toronto, Ontario, Canada

    By Andy Ingriselli, Andrew Famiglietti, John Westland, Greg Landry

    Atlas Dewatering was contracted to install and maintain a groundwater control system for the new Bessarion Subway Station and the Tail Track Structure on the Toronto Transit Commission’s new Sheppard

    Jan 1, 2001

  • SME
    The Sizing Of Grinding Ball Mills

    By A. R. Zambrano

    Equations for Power Draw, Capacity, and Work Input for predicting the performance of industrial grinding mills are derived based on torque measurements obtained in a laboratory instrumented mill. Thes

    Jan 1, 2001

  • SME
    Design of a NATM Tunnel for Mission Valley Light Rail—East Extension

    By David Field, David Powell, Richard Hulsen

    The Mission Valley Light Rail will loop through San Diego State University (SDSU)and to minimize the impact of construction most of the works will be underground. The project will require construction

    Jan 1, 2001

  • SME
    Manhattan Segment of East Side Access Project: Design Evolution

    By Sanja Zlatanic, Michael P. Della Posta

    New York State’s Metropolitan Transportation Authority (MTA) has undertaken the largest transportation project in New York City. The East Side Access Project (ESA) will introduce MTA’s Long Island Rai

    Jan 1, 2001

  • SME
    Minerals Education Through The National Science Teachers Association Meetings: The Past And The Future

    By J. N. Murphy

    The use of the National Science Teachers Association (NSTA) regional meetings as a forum to educate teachers on the role of minerals in our society has been immeasurably successful. Each year, on ave

    Jan 1, 2001

  • TMS
    Lattice Boltzmann Methods for Metallurgical Process Simulation

    By Christian Redl

    "The Lattice Boltzmann Method (LBM) solves fluid dynamics problems based on a discrete mesoscopic approach. It is based on the Lattice Boltzmann equation which is a special discretisation of the conti

    Jan 1, 2001

  • SME
    Maintaining A Healthy Environment For The Mining Machinery In An Automated Underground Metal Mine

    By S. Hardcastle

    Tele-remote operation of production equipment from surface will change the design criteria for underground mines. And for ventilation, with machine operators on surface, conventional planning to dilut

    Jan 1, 2001

  • AUSIMM
    Blast Design Using Measurement While Drilling Parameters

    By M Higgins

    Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio

    Jan 1, 2001

  • SME
    Sag And Ball Mill Operation In Weak Network Conditions

    By P. Burmeister, R. A. Errath, A. Sapin

    Sag Mills are becoming bigger in size almost every year. Concentrator plants are also becoming larger with more SAG and Ball Mills units with Gearless Mill drives installed in one plant. In contradict

    Jan 1, 2001

  • AUSIMM
    Staurolite Product Development

    By S Benson

    Staurolite is one of the major contaminant minerals contained in the Tiwest Cooljarloo orebodies. Approximately 80 per cent of staurolite in mined ore, reports to the heavy mineral concentrate that is

    Jan 1, 2001

  • SME
    St. Louis Skinker–McCausland Tunnel

    By Jozef F. Zurawski

    River Des Peres Foul water Interceptor (Skinker–McCausland Tunnel) is a gravity sewer tunnel constructed to eliminate dry sewage overflows during high river stages and to improve the wastewater collec

    Jan 1, 2001

  • CIM
    Spray-on lining support in Canadian underground mining — A research summary

    By D. O. DeGagné, J. F. Archibald

    Spray-on polymer linings, as partial or full replacement for traditional forms of area rock support, have seen rapid growth in interest within Canada. A wide variety of lining types, ranging from poly

    Jan 1, 2001

  • CIM
    Effluent Treatment with Toxicity Control at Placer Dome (CLA)’S Dome Mine

    By Trevor Yeomans, David Yaschyshyn

    "Placer Dome (CLA) operates the 90-year-old Dome Mine, in South Porcupine, Ontario.The milling operation currently processes 5 million tons of ore per year, from both the underground and Open pit mini

    Jan 1, 2001

  • SME
    Clean Water Act - An Arizona Copper Mining Experience

    By C. V. Baltzer, E. L. J. Bingham

    Compliance with the EPA's emerging Clean Water Act regulations can be challenging. Open pit copper mines in Arizona have found themselves in a tangled web of changing rules, regulations, and gui

    Jan 1, 2001

  • SME-ICGCM
    Status Of Longwall Research In CSIRO

    By Michael Kelly

    Current research in longwall mining in CSIRO Exploration & Mining is focused within five major projects and several minor projects. The major projects are: 1 3D Aspects of Longwall Geomechanics. Th

    Jan 1, 2001

  • SME
    Thermodynamic Analysis Of Gold Leaching By Ammoniacal Thiosulfate Using Eh/Ph And Speciation Diagrams (1b00c1b6-1d3c-49da-aa8d-881dd0b4bd68)

    By D. M. Muir

    Thiosulfate offers a non-toxic alternative to cyanide for processing gold ores. The mechanism of leaching gold using ammoniacal thiosulfate solution is driven by the Cu(II)-Cu(I) redox couple and is c

    Jan 1, 2001

  • SME
    Construction of a Large-Scale Tunnel in Sedimentary Soft Rock Near a Residential Area— Onmawashi-Koen Regulating Reservoir

    By Hiroshi Himura, Shoichi Tsushima, Hiromi Goshima

    This paper reports the construction of an environmentally-friendly tunnel in sedimentary soft rock near a residential area. The main tunnel, which will be used as the Onmawashi-Koen (Park) Regulat

    Jan 1, 2001

  • CIM
    The McClean Lake Operation COGEMA Resources Inc. JEB Mill Process Description and Commissioning

    By Art Carino

    "The McClean Lake operation is located in the Eastern Shore of the Athabasca Basin in northern Saskatchewan some 700-air kilometers north of Saskatoon. It is operated by Cogema Resources Inc., the maj

    Jan 1, 2001

  • AUSIMM
    Blasting in Sydney Sandstone to Speed-Up Tunnelling in the Northside Storage Tunnel

    By R Williams, P Kohout, J Comins

    The Northside Storage Tunnel (NST) is the largest tunnelling project ever undertaken in Sydney. The tunnel extends deep underground from the western bank of the Lane Cove river to the North Head sewag

    Jan 1, 2001

  • CIM
    Strength development in underground high-sulphate paste backfill operation

    By F. P. Hassani, Jacque Ouellet, M. Hossein

    A laboratory investigation was undertaken to evaluate the effectiveness of different binding agents in a paste backfilling operation suitable to be used in a sulphide-rich environment. Different combi

    Jan 1, 2001