Search Documents

Sort by

  • AUSIMM
    The Application of Conditional Simulation to Mine Planning at Cannington

    Cannington is a Broken Hill type deposit discovered by BHP Minerals, now BHP Billiton, in 1990. The deposit is located south east of Cloncurry, Queensland, Australia. The deposit occurs in the Eastern

    Jan 1, 2003

  • SAIMM
    Keynote Address: The South African mining industry sustainable development requires new integrated systems of governance

    By M. Hermanus

    1. INTRODUCTION It gives me great pleasure to extend my warmest greetings to everyone attending the 30th International Conference of Safety in Mines Research Institutes. I would also like to bid a

    Jan 1, 2003

  • TMS
    Process Development Strategies for Mercury Remediation

    By Jerome P. Downey

    Technologies developed within the field of extractive metallurgy to recover, concentrate, and purify metals and industrial minerals from ores, have served as the foundation for all of the subsequent e

    Jan 1, 2003

  • AUSIMM
    Co-Mixing of Tailings, Waste Rock and Slag to Produce Barrier Cover Systems

    By D Landriault, G W. Wilson, L Langetine and

    Engineered soil covers are used for final closure options for both waste rock and tailings disposal facilities. Currently, cover construction requires excavation of appropriate cover material from a n

    Jan 1, 2003

  • SME
    Design and Construction of a Deep, Dual-Cell, Slurry Wall Shaft in Soft Ground

    By Edwin Itzig-Heine, Daniel Traylor, Bernard Tarralle, Michael McKenna

    This paper discusses the challenges associated with the design and construction of a dual-cell, “figure eight” shaped shaft in saturated, soft ground for the Northeast Interceptor Sewer project in Los

    Jan 1, 2003

  • TMS
    Removal Of Thallium From Wastewater

    By Catherine Williams-Beam

    Thallium is more toxic to humans than mercury, cadmium, lead, copper or zinc. Its chemical behavior resembles the alkali metals (K, Rb, Cs). It occurs almost exclusively in natural waters the monoval

    Jan 1, 2003

  • AUSIMM
    Problems With Acid Rock Drainage Predictions at the Ekati Diamond Mine, Northwest Territories, Canada

    The Ekati Diamond Mine is located on permafrost terrain in CanadaÆs Northwest Territories. The mine rock consists of: diamond-bearing and barren kimberlite; and surrounding waste rock such as granit

    Jan 1, 2003

  • TMS
    Recovery Of Cerium By Oxidation/Hydrolysis With KMNO4 ? NA2CO3

    By C. A. Morais

    The present work describes the development of an efficient and relatively simple process to obtain high grade CeO2 from a mixed rare earth chloride solution. The process involves cerium oxidation and

    Jan 1, 2003

  • SME
    South Interceptor Tunnel Construction Using a Lovat EPBM

    By Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales

    This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja

    Jan 1, 2003

  • AUSIMM
    Benefits and Risks of Submarine Tailings Disposal ù Lessons Learnt From Two Historic Mine Sites in Newfoundland and Other Canadian Case Studies

    By T P. Hynes

    Submarine tailings disposal is conceptually an attractive option for managing reactive mine wastes in coastal regions by virtue of reduced sulfide oxidation under a water cover and no infrastructure t

    Jan 1, 2003

  • SME
    Board of Consultants–A Requirement for Hard Rock Tunneling Projects

    By Debbie Nakamura, Daniel Tempelis, John E. Shamma

    The Metropolitan Water District of Southern California established a Board of Consultants to assist them in administering the design and construction of the Inland Feeder Program tunnels. The Board ac

    Jan 1, 2003

  • SME
    The True Cost of Boulders in a Soft Ground Tunnel

    By Hugh E. Cronin, Joseph J. Coluccio

    The Columbia Slough Consolidation Conduit Project is a 12 ft. 0 in. inside diameter—15 ft. 4 in. excavated diameter tunnel, 8,300 lf. in length. The tunnel is divided in two parts a 4,460 lf. reach to

    Jan 1, 2003

  • SME
    National Mining Hall of Fame to Induct Six

    Six pioneers of the American mining industry will be inducted into the National Mining Hall of Fame on Saturday, Sept. 13, at the Museum Convention Center in Leadville, CO. The 16th annual Mining

    Jan 1, 2003

  • SME
    Profitability Of Investment In The Low Temperature Geothermal Sources In Croatia

    By D. Rajkovic

    Geothermal sources are exploited in two basic forms, i.e., the primary form of thermal energy and that converted into electrical energy by using an adequate thermodynamic cycle. There is a possibility

    Jan 1, 2003

  • SME
    Analysis of the Controlled Deformation in Rock and Soil (A.DE.CO.-RS)–Tunneling Approach Performance of an Alternate Tunneling Approach in the Construction of 100 Kilometers of Tunnel for the Bologna to Florence High Speed Rail Line

    By Silvano Morelli, Giovanna Cassani, Renzo Bindi, Antonio Nicola

    More than 70 km of main line and service tunnels have been excavated to date for crossing the Apennines between Bologna and Florence. A new design and construction approach, known as Analysis of t

    Jan 1, 2003

  • TMS
    Barium-Strontium Titanate Powder Synthesis in a Thermal Plasma Reactor

    By Patrick R. Taylor

    The synthesis of high-purity ultra-fine barium strontium titanate powders (BST: BaO6Sro.4TiO3) has been performed in a non-transferred are D.C. thermal plasma reactor. Slurries of aqueous solutions of

    Jan 1, 2003

  • SME
    Cincinnati Features Aggregates and Industrial Minerals Programming

    The 2003 SME Annual Meeting and Exhibit will take place Feb. 24-26 in Cincinnati, OH. The meeting will feature a host of special symposia and programming geared toward the industrial minerals and agg

    Jan 1, 2003

  • AUSIMM
    Using Data to Identify Risk to Improve Safety and Health Performance

    By A Williamson

    The New South Wales Department of Mineral Resources objective is to use data and information to undertake a detailed analysis of incidents and accidents to identify risks so that the predictable can b

    Jan 1, 2003

  • AUSIMM
    A Practical Example of a Risk-Based Approach to the Design of an Open Pit

    By P R. G Milne

    A risk-based approach to optimising pit wall slope angles was trialled in the design of a 60m deep open pit in extremely weathered and distinctly weathered materials in the Kalgoorlie area. The pit us

    Jan 1, 2003

  • AUSIMM
    PXI System for Monitoring Longwall Gate Roads Convergence

    By K Matsui, R N. Gupta, H Shimada

    Roof falls and failures of powered supports were major threats at longwall face. Abnormal geological conditions were caused roof falls and shield damage. Therefore continuous monitoring and analysis o

    Jan 1, 2003