Search Documents

Sort by

  • SME
    Design and Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift Method

    By Paul H. Madsen, Victor S. Romero

    The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geo

    Jan 1, 2001

  • NIOSH
    OFR-84(3)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume III - Methane Generator

    By R. V. Ramani

    This report is volume 3 of an eleven-volume final report for a Grant completed by The Pennsylvania State University for the Bureau of Mines to develop a dynamic general purpose computer simulation mod

    Jan 1, 1974

  • NIOSH
    RI 7198 Earth Pressure At Rest And One-Dimensional Compression In Mine Hydraulic Backfills

    By David E. Nicholson

    The Bureau of Mines has constructed a special compression chamber for developing stress-strain relationships of mine backfill and simulating the high compressive ground pressures encountered in underg

    Jan 1, 1968

  • AIME
  • AIME
    Open Pit Forum – Cost Performance Operation

    By R. E. Sinke

    Demerara Bauxite Co. in British Guiana has come a long way in tackling the problem of stripping and removing overburden. When the company started mining in 1917, overburden was hand-loaded into carts

    Jan 4, 1955

  • SME
    Shaft Sinking Considerations And Problems

    By Gerald G. Griswold, Allan G. Provost

    "To Sink or Not to Sink"; this play on the Bard's words sums up the considerations and problems that face the owner on every potential shaft sinking project. The growing demand for access into t

    Jan 1, 1974

  • IMPC
    Scientific Bases of Gold-bearing Pyrite Recovery From Pyrite-bearing Waste Products of Copper-zinc Sulfide Ores

    By E. L. Chanturiya

    During the mineral processing of pyrites sulphide ores of some deposits of Russia loss of gold with tailings and pyrite concentrates amounts up to 40%~90%. The problem of selective allocation of gold-

    Jan 1, 2014

  • TMS
    Separation of Chromite and Silica from Reclaimed Foundry Sand Using Physical Concentration Processes

    Sanes are utilized to make molds for metal castings in the foundry industry. Approximately a half ton of sand is disposed of for each ton of metal cast in this country. The purpose of this investigati

    Jan 1, 1995

  • AIME
    Local Section News (e08ddab2-5565-4749-bf5d-ea2c9e76effc)

    Committee of Arrangement E. P. MATHEWSON, Chairman. FRANK M. SMITH, Vice- Chairman D. C. BARD, Secretary, Montana State School of Mines, Butte, Mont. OSCAR ROHN, JAMES L. BRUCE. On Aug. 20, 1913

    Jan 9, 1913

  • IOM3
    Geochemical mapping of carbonate terrains

    By T. Lenarcic, R. Svrkota, J. M. McNeal, E. Prohic, S. Pirc

    Paper presented at the 28th International Geological Congress held in Washington DC, July 1989 (International geochemical mapping sessions). Surface drainage samples, the usual media employed in mappi

    Jul 1, 1991

  • AUSIMM
    Full-scale Flow Marker Experiments at the Ridgeway Deeps and Cadia East Cave Operations

    By B Mobilio, G B. Sharrock, J L. Lett, I Brunton, T Thornhill

    Full-scale marker experiments at Cadia Valley underground operations have been ongoing for over 14 years. Initial marker experiments were undertaken in the Ridgeway sublevel cave (RW) (2002), and subs

    May 9, 2016

  • IIMP
    Operations Research and Computer Application in the Mineral Industry: Past, Present and the Future

    By Sukumar Bandopadhyay

    The escalation in micro-computer power during the past ten years has been instrumental in the realization of operations research and other mine planning tools as a practical mine design tool. Present

    Aug 25, 2002

  • SME
    The Gradual Evolution Of Mechanized Hard Rock Mining

    By R. L. Bullock

    For the past 30 years there has been a gradual evolution of mechanical excavating systems in underground hard rock mining applications. This paper traces many of the tests of various tools and methods

    Jan 1, 1995

  • DFI
    Toe Protection For H-Piles On Sloping Bedrock At Rainy River - Summary

    By Jon E. Bischoff

    Construction of a secondary clarifier on the banks of Rainy River, Northern Minnesota, required the driving of H-piles 14HP102 to a sloping, very strong bedrock through thick deposits of soft and medi

    Jan 1, 1993

  • AUSIMM
    Adsorption of Alkylammoniums in the Interlayer of Montmorillonite and its Effect on the Viscosity of Organo-Montmorillonite Gels

    Adsorption of Alkylammoniums in the Interlayer of Montmorillonite and its Effect on the Viscosity of Organo-Montmorillonite Gels

    Sep 13, 2010

  • AIME
    The Engineering Foundation (1549ab59-1196-4a5a-8bad-26bbc41a0902)

    The members of the Institute will recall the account given in the March Bulletin of the inauguration exercises of the Engineering Foundation which was inhibited by an initial gift of $200,000 by Mr. A

    Jan 12, 1915

  • TMS
    Promotion of Recycling Business by Combination of a Pre-Treatment Plant and the Mitsubishi Process at Naoshima Smelter & Refinery

    By Nobuhiro Oguma, Yuji Mizuta, Hideya Sato, Shigehiko Iwahori

    "Recyclable materials containing copper and precious metals have been treated at the Mitsubishi Process in Naoshima. In 2003, a new incinerating and melting plant (pre-treatment plant) for waste mater

    Jan 1, 2012

  • AUSIMM
    How to Evaluate AG/SAG Test Work

    Autogenous and Semi-Autogenous grinding has become an accepted method of reducing primary crusher product to micron sizes in a single or a two-stage grinding circuit. The elimination of secondary an

    Jan 1, 1991

  • AIME
    Extractive Metallurgy Division - Sintering Practice at Josephtown Smelter - Discussion

    By Karl F. Peterson, H. K. Najarian, Robert E. Lund

    R. E. Powers (Mellon Institute of Industrial Research, University of Pittsburgh, Pittsburgh)—Several of the processing methods at the Josephtown smelter might well be considered by plants producing ir

    Jan 1, 1952

  • AUSIMM
    Practical Aspects of Availability and Reliablity Management in a Large Open Pit Mine

    The large El Cerrejon coal open pit in north east Columbia has been developed over the last decade in a remote, entirely new mining area with hitherto unskilled inhabitants. Now over 200 pieces of hea

    Jan 1, 1991