Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Outokumpu Process for the Precious Metal Refining from Copper Anode SlimeBy Olli Järvinen
The capacity of the Outokumpu Pori refinery is today about 125 000 mt in 1998. The anode slime amount is about 700-800 mt. The copper is removed with pressure leaching. Selenium roasting is done with
Jan 1, 2000
-
Pipe Jacking Big Time!By Klaus Rieker
"Since the mid-19th century the River Emscher in the German Ruhr District has been used for disposing of wastewater. In the early 1990s, it was decided to replace the existing open wastewater system w
Jan 1, 2016
-
Cost Calculations for Highly Mechanized Cut-and-Fill StopingBy Gordon M. Pugh, David G. Rasmussen
INTRODUCTION The two unit operations in cut-and-fill stoping that would benefit most from increased mechanization are drilling blastholes and moving broken ore to the ore¬passes. Drilling in curren
Jan 1, 1982
-
Herramientas para la gestión de la operación mineraBy Manuel Álvarez Alvino
El presente trabajo señala el uso de las herramientas tecnológicas en los productos informáticos para controlar las operaciones mineras, dado que no existe un un producto concebido a la medida de cada
Jul 31, 2003
-
Functional Optimization of Open Pit Mine Design Utilizing Geologic Cross-Section DataBy Kenneth W. Luke
A computer programing system has been devised to assist in open pit mine design planning. This system operates upon data generated for cross sections in the mine plan, and parallels present manual met
Jan 1, 1973
-
Associations and Institutions in Support of the Australian Mineral IndustryThe paper reviews the majority of associations and institutions which operate in support of the Australian mineral industry. The review covers historical aspects of each organisation and the current
Jan 1, 1988
-
Behaviour of Bubble Clusters in a Turbulent FlowBehaviour of Bubble Clusters in a Turbulent Flow
Sep 13, 2010
-
Construction of the Detroit River Outfall No. 2By Michael Traylor, Michael Jatczak, Brett Robinson
The Detroit River Outfall No. 2. is an effluent water conveyance system linking the Detroit Metropolitan Wastewater Treatment Plant to the Detroit River. The 6.4m (21ft) finished diameter tunnel exten
Jan 1, 2003
-
Infrared Studies Of Oleic Acid And Sodium Oleate Adsorption On Fluorite, Barite, And CalciteBy Alan S. Peck
Chemisorbed oleate films on the surfaces of fluorite, barite, and calcite were studied by means of infrared spectrophotometry. Evidence is presented which indicates the mineral anions, i.e., fluoride,
Jan 1, 1964
-
Non-Explosive Mining: An Untapped Potential For The South African Gold-Mining Industry (cbe23da5-e33f-4ac3-b72c-6d60c898e689)By R. G. B. Pickering, H. H. Haase
CONTRIBUTION BY D. O'CONNOR Mechanical extraction of rock has been a goal sought after for some decades in the South African gold-mining industry. There are factors distinct from the mode of
Jan 1, 1992
-
Akinetic study of the leaching of pentlandite in acidic ferric sulphate solutionsBy M. T. Scholtz, I. J. Corrans
Akinetic study of the leaching of pentlandite in acidic ferric sulphate solutions by I. J. CORRANS, (Pr. Eng.). B.Sc. (Chem. Eng.) (Wits.). M.Se. (N.S.W.). Ph.D. (Natal) (Member) and M. T. Scholtz. B.
Jan 5, 1976
-
An Integrated Process For Recovery Of Coal Fines From Waste Streams Using The Packed Flotation ColumnBy D. C. Yang
A practical and economical flowsheet has been developed and demonstrated by integrating the packed column flotation with the GranuFlow process for fine coal recovery. Orimulsion, which was used as an
Jan 1, 1998
-
-
The Use and Abuse of Feasibility StudiesBy N Cusworth
The development of a resource project inevitably requires the investigation of a vast range of issues across most engineering disciplines û mining, metallurgical, chemical, civil, electrical, mechanic
Jan 1, 2007
-
Is Control of Fine Coal Circuits Necessary?By Randhir Sehgal
If the primary purpose of a control system is to assure a fixed-quality product at maximum yield, the real issue involved in control of the fine coal cleaning circuit in a plant is to demonstrate that
Jan 1, 1988
-
Institute of Metals Division - Thermodynamic Properties of Solid Fe-Au AlloysBy L. L. Seigle
Free energies, heats, and entropies of mixing of solid Fe-Au alloys have been measured by the galvanic cell method between 800° and 900°C. A positive deviation from Raoult's law and a large exces
Jan 1, 1957
-
Recycled Metals In The United States - A Sustainable Resource - IntroductionSeventy-three of the 90 naturally occurring elements that are found in the earth's crust are metals or metalloids. The quantities of metals used annually in the United States range from about 100
Jan 1, 1993
-
Characterization of Mineralization in the Sullivan-North Star Corridor and Enhanced Exploration for Other Mineral Deposits in the Purcell Basin, Southeastern British Columbia: Application of High-resolution Airborne GeophysicsBy D. A. Brown, C. Lowe
"Abstract -A multi-sensor (electromagnetics, magnetics, gamma-ray spectrometry, and VLF) geophysical survey was recently conducted in the Purcell Basin of southeastern British Columbia in an area enco
Jan 1, 1998
-
Design For Minimum Maintenance Labor And SuppliesBy A. P. Massmann
Design for economical operation, minimum operating labor and minimum maintenance for labor and supplies are virtually inseparable. Each consideration has a vital bearing on the other. Let us assum
Jan 1, 1959
-
Oxidation Behavior of TiA13By Xuerong Wen
The oxidation behavior of TiAl3 intermetallics was investigated as a hnction of time at 1273K in pure dry oxygen. The oxidation experiments were carried out using TGA method. The oxidation scales were
Jan 1, 1998