Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Geotechnical and Mechanical Interactions Using the Earth-Pressure Balanced Shield Technology in Difficult Mixed Face and Hard Rock ConditionsBy Ulrich Maidl
The use of EPB shields in the so-called mixed face conditions has set new demands to man and machine in EPB shield tunneling. EPB shields were initially conceived to drive in the pressurized closed mo
Jan 1, 2003
-
Environmentally and Publicly Acceptable Options for Remediation at Tui Mine Site, Te ArohaBy J Webster-Brown
The Tui Mine is an abandoned Pb-Zn mine giving rise to water quality problems in the Te Aroha region of Coromandel, New Zealand. When sampled in September 2002, for example, both the Tui and Tunakohoi
Jan 1, 2003
-
Laboratory Experiments of As(V) and As(III) Sorption Onto Pit-Lake Sediments From Three Different Orebody TypesBy D L. Decker, G C. Miller, C Papelis
Arsenic, often associated with precious metals ore deposits, is a major contaminant released during large-scale gold mining. Because of the complex oxidation/reduction and sorption behaviour of As, pr
Jan 1, 2003
-
Technology News – Proper Lubrication Lengthens Equipment LifeBy Reginald Dias
Mining operations take a tremendous toll on equipment, operating in difficult conditions day after day. Owners and operators cannot make the job any easier, but they can give their equipment an advan
Jan 1, 2003
-
CAES System at KCGM ù Four Years OnBy L O. ÆNeill, J Bebek
When Kalgoorlie Consolidated Gold Mines (KCGM) purchased its fleet of 18 CaterpillarÆs dump trucks in 1999, as part of its change to owner operated mining, five CaterpillarÆs Computer Aided Earthmovin
Jan 1, 2003
-
Lihir Gold Five Years On ù Maximising Throughput and Capital UtilisationDuring the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future
Jan 1, 2003
-
Acid Rock Drainage Treatment Technologies ù Identifying Appropriate SolutionsBy N Murphy and, S Santomartino, M Cramer
Acid rock drainage (ARD) can have detrimental effects on mining infrastructure, water reuse options and environmental discharge. As a result, some form of short- or long-term treatment is required at
Jan 1, 2003
-
Metallurgical Processing Plant Ramp-Up Periods ù How to Reap the æRewardsÆFundamentally, the development of a minerals processing project is a very risky enterprise. Most mining companies do not have sufficient financial resources to undertake significant projects and hence
Jan 1, 2003
-
Flotation Circuit Analysis at WMC Ltd Olympic Dam OperationBy P Wigley
New methods of analysing and modelling flotation circuits have been developed as part of the AMIRA P9 mineral processing research project. A study using these techniques was conducted on the Olympic D
Jan 1, 2003
-
An Innovative Process for the Recovery of PGM’s from Panton OreBy Alan Bax, John D. Lewins
"Platinum Australia Limited (“PLA”) is currently undertaking a Feasibility Study into the development of the Panton Platinum Palladium Project located in the Kimberley region of Western Australia. The
Jan 1, 2003
-
Rehabilitation of the Lake George Mine at Captains Flat NSW ù 25 Years OnBy J Brisebois
The derelict Lake George Mine is located at Captains Flat in NSW, acommunity of approximately 450, which lies some 43 km southeast ofQueanbeyan. It straddles the Molonglo River, which flows toQueanbey
Jan 1, 2003
-
United Nations’ Emergency Preparedness Program Available to Mining IndustryThe Awareness and Preparedness for Emergencies at the Local Level (APELL) program is a process that helps people prevent, prepare for and respond appropriately to accidents and emergencies. APELL was
Jan 1, 2003
-
Blasting Improvements at KCGMBlasting is a common practice in mining whereby solid rock is fractured, using explosives, to a more manageable size. The effectiveness of blasting influences a number of downstream activities such as
Jan 1, 2003
-
Use of Mineralogical Analysis in Risk Assessment for Coal MiningA comprehensive understanding of the rocks associated with coal seams, and also of the coal itself, is essential in assessing the likely behaviour of the materials before, during and after the mining
Jan 1, 2003
-
Environmental Design for Growth: Garfield Interceptor Tunnel ProjectBy Victor M. Mercado, Jay B. Shah
Spalding DeDecker Associates, Inc. (SDA) designed a tunnel project that fulfilled the Sustainability Objectives of Social Equity, Environment, and Economics. The project translated the principles of S
Jan 1, 2003
-
Production Of Elemental Sulphur From Non-Ferrous Smelter Gas (Keynote) (0da863a0-3b55-4ebb-968f-68550bd51096)By Takahiko Okura
Most non-ferrous raw materials are associated with sulphur. To extract the metals, the sulphur is recovered typically as Sulphuric acid or liquid S02. On the other hand, natural gas may contain over 2
Jan 1, 2003
-
The Practical Implementation of Dewatering and Depressurisation in Large Open PitsAll large open pits in Australia have been mined, or are planned to be mined well below the local water table. This raises several issues that impact on mine safety, mining costs and regulatory approv
Jan 1, 2003
-
Deep Shaft Construction in Unconsolidated Material and Water-Bearing FormationsBy Del Brock, Dan Wooton
The design/build of two adjacent vertical mine shafts in difficult ground conditions at a mining complex in the midwestern United States required innovative construction techniques. Construction of th
Jan 1, 2003
-
Thermodynamic Study On Recovery Of Lead And Antimony From A Used Lead-Battery (4583ff1c-9415-4e13-995b-146d2e10ecae)By Satoshi Itoh
Phase equilibria and activities of the components in the liquid lead-antimony-oxygen ternary system, which is of fundamental importance for discussing the' recovery of lead and antimony from a us
Jan 1, 2003
-
CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines (2003)"Adopted in 2003, theses guidelines are intended to assist the Qualified Person(s) in the planning, supervision, preparation and reporting of mineral resources and mineral reserve estimates. The repor
Jan 1, 2003