Search Documents

Sort by

  • CIM
    Reasonable Prospects for economic extraction

    By Greg Gosson, Larry B. Smith

    "These are heady times for the mining industry, with strong metal prices, investor enthusiasm for the junior explorer and ready access to finance for mineral projects. Many projects were shelved in th

    Jan 1, 2003

  • AUSIMM
    Comparative Cost Analyses of Technologies for Treating Sulfate- and Metal-Contaminated Groundwater

    By T Martin, M Martin

    Mining of sulfide-based ore deposits typically creates a potential for release sulfate and acid to groundwater, and many operating mines are thus predicted to require long-term post-closure treatment

    Jan 1, 2003

  • AUSIMM
    PIMS ù The Road to Efficient, Cost-Effective Plant Operation

    By D Hunter

    A production information management system (PIMS) was recently implemented at Queensland NickelÆs Yabulu Refinery. Although a strong business case was developed to justify the significant investment i

    Jan 1, 2003

  • IMPC
    Conditions of Optimality for Process of Separation of Pourable Materials.

    By E. Barsky

    "The aim of separation is to obtain two products that are as distinct as possible from each other. It is currently believed that the most objective criteria for the quality of a separation are the Han

    Jan 1, 2003

  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • AUSIMM
    Polish Scale of Harmfulness of Vibrations (SWD by its Polish Acronym) and Actual Damages to One-Family Houses

    In this paper presented are the criteria used when assessing the harmfulness of shocks affecting the buildings. Those criteria are based on the value of speed or accelerations of building vibrations.

    Jan 1, 2003

  • CIM
    Dates in technical reports

    By Deborah A. McCombe

    "There are a number of important dates that must be disclosed when a Qualified Person (QP) is preparing a technical report for securities purposes. The dates are discussed in NI43-101 and the Form of

    Jan 1, 2003

  • AUSIMM
    Numerical Modelling of Unsaturated Flow in Uniform and Heterogeneous Waste Rock Piles

    By B BussiFre, J Molson, M Aubertin, G W. Wils

    Waste rock piles containing reactive sulfide minerals can serve as long-term sources of acid mine drainage (AMD). Within these piles, many physical, geochemical and biological processes can contribute

    Jan 1, 2003

  • AUSIMM
    Assessment of Subsidence Mechanisms and Risk From the Waihi Underground Mine Workings, New Zealand

    By L Richards, R L. Brathwaite, C Mazenga

    Underground mining of gold-silver bearing quartz lodes was carried out in the great mines at Martha Hill, Waihi over 70 years from 1882 until 1952. Shafts and stopes reached a total depth of 600 m on

    Jan 1, 2003

  • AUSIMM
    Acid Generation Behaviour of Chalcopyrite and Pyrite Under Column Leach Conditions

    By A R. Gerson

    Pyrite, chalcopyrite and mixed sulfide samples, with and without quartz (5 wt per cent S), were subjected to column leaching to mimic natural weathering (cyclic wetting and drying). The pH and SO4 2-

    Jan 1, 2003

  • CIM
    CERM3 and its contribution to providing sustainable research for the mining industry

    By M. Veiga, L. Lavkulich, R. Pakalnis, M. Ghomshei, S. Baldwin, J. A. Meech

    "On July 26, 2000, the Canada Foundation for Innovation announced an award of $1.3 M dollars for The Centre for Environmental Research in Minerals, Metals and Materials, CERM3, at The University of Br

    Jan 1, 2003

  • AUSIMM
    Hydrology of Final Void and Spoil Catchments

    Reliable predictions of the long-term water quality and water level fluctuations in a final void are vital if mine operators propose to decommission final voids in open cut mining operations. The catc

    Jan 1, 2003

  • TMS
    Optimization of Coke Rate and Sinter Quality by Genetic Algorithm for Two-Layer Sintering of Iron Ore

    By Niloy K. Nath

    Two layer sintering by charging green sinter mix with normal coke rate in the upper layer and reduced coke rate in the lower layer, can substantially reduce the coke rate and also improve the sinter q

    Jan 1, 2003

  • TMS
    Morphological Characteristics Of Nickel Particles Electrodeposited From Chloride Dominant Solution

    By Guo Xueyi

    The morphological characteristics of the nickel particles electrodeposited from chloride dominant aqueous solution was investigated. The effects of the electrolyte constituents, the parameters for the

    Jan 1, 2003

  • AUSIMM
    Managing Risk at Rapu Rapu, the Philippines

    Lafayette Mining Limited, a listed Australian company, is developing a polymetallic Project on the island of Rapu Rapu, located to the east of southern Luzon in the Philippines. The Rapu Rapu Project

    Jan 1, 2003

  • CIM
    The “Mill Redesign Project” at Inco’s Clarabelle Mill

    By G. Labonté, J. Truskoski, A. Kerr, A. Bouchard, J. Barrett

    "Improving mill grade recovery relationships is always good business. Inco’s Clarabelle mill has just undergone a $16 M process upgrade that was designed to improve nickel recovery by 2%. The “Mill Re

    Jan 1, 2003

  • AUSIMM
    Drill Blast Versus Reverse Circulation Grade Control Sampling ù A Case Study From the Mt Muro Gold Silver Mine, Central Kalimantan, Indonesia

    Mt Muro was a gold and silver mine in Central Kalimantan on the Island of Borneo, Indonesia. Aurora Gold through its Indonesian subsidiary Indo Muro Kencana owned the project. Processing commenced in

    Jan 1, 2003

  • AUSIMM
    Long-Term Performance and Cost Benefit Analysis of Passive Acid Mine Drainage Treatment Systems Installed in the Appalachian Coal Region of the Eastern United States

    By J S. Simmons, J G. Skousen

    This project evaluated the performance of nine passive treatment methods by studying 137 treatment units in eight eastern states. Performance was normalised according to construction cost, projected s

    Jan 1, 2003

  • TMS
    Accurate, Responsive Melt Rate Control During Vacuum Arc Remelting

    By Rodney L. Williamson

    Vacuum arc remelting (V AR) is an industrial metallurgical process widely used throughout the specialty metals industry to cast large alloy ingots. Part of the V AR control problem consists of adjusti

    Jan 1, 2003

  • TMS
    Theoretical Modeling of the Bainitic Transfonnation

    By D. Van Dooren

    The final goal of the research project is to develop a 3D FEM model that is able to predict the kinetics and micro-structural evolution during the bainitic transformation. The input parameters consist

    Jan 1, 2003