Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Case Study Of The Rockpass System At Kloof No. 3 ShaftBy R. Hart
In this paper, problems that have been experienced with the rockpass system at Kloof Mine No. 3 Shaft are described. Actions that have been taken to overcome the problems are also described. These inc
Jan 1, 2006
-
Case Study of Thickened Tailings at Goldcorp’s Musselwhite Mine in Northern OntarioBy Jérôme Girard, Shiu Kam, Sue Longo
"Historically, tailings management in a northern climate has involved the deposition of tailings into the Tailings Management Area (TMA) as conventional slurry. This type of system is obviously viable
Jan 1, 2011
-
Case Study Of Three Bidirectional Static Load Tests For Bored Piles At Sabana Costa RicaBy Mauricio Coto
Three bidirectional static load tests (BDSLT) were executed on bored concrete piles, as part of the permanent foundations for two buildings sites located at the Sabana, San Jose, Costa Rica, separated
-
Case Study on Application of Advanced Flotation Simulation to Determine Optimum Reagent DosageBy Chris A. Bennett, Glenn S. Dobby, David A. Bulled
Establishing reagent dosing strategies for new ore bodies has traditionally involved a combination of experience and empirical experimentation using standard laboratory tests. The grade and recovery d
Jan 1, 2003
-
Case Study on Application of Cohesive Fracture in Cuttings Reinjection in West AfricaBy W. Standifird
"Cohesive fracture is a mechanical model widely used for modeling quasi-brittle fracture in rocklike materials. This work discusses use of this model to simulate quasi-brittle fractures generated by i
Jan 1, 2015
-
Case Study on Innovatively Launching a Full-Size TBM in Challenging Ground - RETC2021By John Newby, Mahmood Khwaja, Bernard Theron, Janice McGovern, Bernard Catalano, Michael S. Schultz
Launching a full-size pressurized-face Tunnel Boring Machine (TBM) in difficult ground conditions is always challenging. Recently, few projects have innovated the process by scaling the trenchless met
Jun 13, 2021
-
Case Study On Quantitative Risk Modelling To Obtain A Realistic Risk-Adjusted Project ValuationBy G. R. Lane
A large opencast gold mining company in Africa had just completed a feasibility study for the expansion of the operations. A traditional net present value project valuation methodology had been used t
Jan 1, 2012
-
Case Study On Quantitative Risk Modelling To Obtain A Realistic Risk-Adjusted Project Valuation ? SynopsisBy G. R. Lane
A large opencast gold mining company in Africa had just completed a feasibility study for an expansion of the operations. A traditional net present value project valuation methodology had been used th
Jan 1, 2013
-
Case Study on Quarry Rehabilitation and Land Resettlement in Dimce QuarryBy John Mastoris, Kostis Dragasakis, Kostas Kouklidis, Shkurtë Gashi, Halil Berisha, Jenuz Bulica
Titan Group’s environmental policy and Sharrcem’s Corporate Social Responsibility (CSR) are the driving forces behind the development and implementation of a comprehensive Rehabilitation Plan at Dimce
Jan 1, 2017
-
Case Study on the Application of Research to Operations—Calcium Ferrite SlagsBy Stanko Nikolic
The Top Submerged Lance (TSL) technology, developed in the 1970s, is now widely used for the processing of a range of materials. TSL technology for continuous converting was first patented in the 1990
-
Case Study on the Frederick Douglass Memorial Bridge and the use of Large Diameter Open End Steel Pipe Piles, Washington, DCBy Karl A. Higgins, Michael D. Venezia
The South Capitol Street Corridor Project is one of the District Department of Transportation’s (DDOT) largest projects, and is currently under construction. This case study will focus on the design o
Jan 1, 2019
-
Case Study on the Remediation of a Remote Acid Mine Drainage Site in South Africa With Emphasis on Low Cost Measures and Cost Benefit AssessmentsBy N Swiegelaar
Loubert Witbank is a defunct coal mine situated near Ermelo in South Africa. Mining ceased in 1992, and within a short period acidic decant occurred, with a significant impact on the regional catchmen
Jan 1, 2003
-
Case Study Using 3-D Blast Modeling to Develop Design for Blasting in Close Proximity to Pit PumpBy Stuart Brashear, Steven Bell, Donald Smith
This Limestone site required the removal of a bench containing high quality rock located in close proximity to sump and pit pump. The sump and associated electrical box were below the bench that neede
Jan 21, 2025
-
Case Study Using Task-Based, Noise-Exposure Assessment Methods To Evaluate Miner Noise HazardsBy A. B. Seal, C. J. Bise
Excessive noise has long been a hazard in the coal-mining industry. Studies conducted during the mid-1970s and mid-1990s consistently show that hearing loss within the mining industry persists, in spi
Jan 1, 2003
-
Case Study ù Final Closure Water Balance of a Tailings Impoundment Using Direct VegetationBy N Currey, G W. Wilson, P Ritchie
Kidston Gold Mine in Queensland, Australia has a 310 ha tailings impoundment that has undergone final closure rehabilitation. Kidston Gold Mine evaluated their closure options for this low acid genera
Jan 1, 2003
-
Case study – an analysis of reliability and efficiency: ultrasonic versus annubar technologiesBy M J. Shearer
An investigation into the reliability of the data being collected at the Mount Isa Mines site operated by Glencore in Queensland allowed on-site ventilation personnel to scrutinise pressure and volume
Aug 28, 2017
-
Case Study – Application of RISKGATE to Managing Strata Failure in an Australian CoalmineBy J Harris, J Turner, P Kirsch
Coal mining is recognised globally as a hazardous activity, and as a result operates under high levels of regulatory and public scrutiny while managing a workforce operating in a high-risk environment
Nov 5, 2014
-
Case Study – Blind Shaft Sinking for BHP Jansen ProjectBy Patrick Rennkamp, Wolf-Dieter Trodel, Andy Fearn
"The Jansen shafts are completed using purely mechanical excavation. This paper summarises the geology, a description of the shafts, the method used for excavation and the results achieved along with
Jan 1, 2019
-
Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West AfricaBy G du Toit, P L. Gillot, M Swanepoel
Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of
Sep 1, 2014
-
Case study – Ernest Henry Mine: designing step out zones in an inclined sub-level caveBy P Nichols, C te Kloot, A Harrison
Ernest Henry mine (EHM) is a sub-level caving operation located in north-west Queensland, Australia. Located below a previously mined open pit, the underground operation ramped up production to 6.8Mt/
Nov 21, 2018