Case Histories, Part 1 - Études De Cas, Partie 1 - Jet Grouting Underpinning Of A Building In The UsBy Gustavo E. Armijo
This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose
Jan 1, 2002
-
Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract ManagementBy Mario Aiezza
This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto
Jan 1, 2002
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered SandstoneBy Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006
-
Case History In Pillar RecoveryBy John J. Reed
The mines of southeast Missouri's Lead Belt have been in operation since 1864, almost 100 years. During this period about 10 pct of the total ore available has been left in place as pillars, and
Jan 7, 1959
-
Case History of a Gravity Drainage Type ReservoirBy R. E. Martin
"The Westerose Leduc (D-3) pool, a Devonian reef reservoir situated in Central Alberta, Canada, has now been producing for over seven years. As a unit operation, the pool pro-vides an interesting exam
Jan 1, 1960
-
Case History of a Mixed Ground MicrotunnelBy D. Craig Camp
conditions. The soils included 65 m of rock not exceeding an unconfined compressive strength (UCS) of 200 kgf/cm2, 130 meters of soft clay, silt, and sand not exceeding 30standard penetration test SPT
Jan 1, 2001
-
Case History of a Site Reevaluation for a Plant ExpansionBy L. A. Pursell
Environmental constraints can both delay and raise the cost of a major plant addition, often requiring a complete reevaluation of the plant site and the proposed project. In this case history, steps a
Jan 1, 1983
-
Case history of Borehole Pulse EM surveys at the Falconbridge Lindsley discovery in SudburyBy D. Crone, T. Watts
"The Lindsley project was a program of deep drilling to test the contact down-dip from two nickel-copper deposits, one uneconomical and the other mined out. The role of Borehole Pulse EM(PEM) was to d
Jan 1, 1992
-
Case History of Lost Circulation Jobs Leduc-Woodbend Field, AlbertaBy H. F. Naldrett
"AbstractAt the end of May, 1950, Imperial Oil, Limited, had completed a total of 192 D-3 wells in the Leduc-Woodbend field, 62 of which lost circulation in the D-3 zone for periods ranging from two h
Jan 1, 1950
-
Case History of Mine Water Treatment at the Henderson Mine and The Adaptation to Bio-Monitoring RegulationsBy Jay Jones, William D. Rech
The Henderson Mine developed a water treatment system in 1985 to meet the NPDES requirements for its mine water discharge. Unacceptable levels of Zinc and Manganese formed the basis for the design and
Jan 1, 1991
-
Case History of the Corridor Orebody, Mount Lyell, TasmaniaBy McKenzie A. M
The Corridor ore body is so named because it occurs in an east-west zone or corridor of schist bounded on the north by the siliceous conglomerates of Mount Lyell, and on the south by similar conglomer
Jan 1, 1961
-
Case History of the Discovery of the Hishikari Gold Deposit, JapanThe Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed e
Jan 1, 1995
-
Case History of the Discovery of the Hishikari Gold Deposit, JapanThe Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed
Jan 1, 1995
-
Case History Of The Gross Rosebel Gold Project, SurinameBy M. Wasel
The Gross Rosebel gold deposits are located in the Guiana Shield of north central Suriname. Initial discovery of surficial gold in 1880 by local artisanal miners preceded small-scale mechanized mining
Jan 1, 1998
-
Case History Of The Juniper ProspectBy S. H. Ward, R. A. Barker
THE Juniper Prospect is in Carleton County, N. B., at approximately 46º 31' north latitude, 67º 20' west longitude. During the summer of 1955 an area in west-central New Brunswick was sele
Jan 1, 1958
-
Case History of the New St. Clair River TunnelBy J. F. McDonald
On December 8th of last year, the new St. Clair River tunnel was holed-through to Port Huron, Michigan. The tunnel, commissioned by the Canadian National Railway, was needed to replace an existing tun
Jan 1, 1995
-
Case History of the Orme Street Combined Trunk Relief Sewer Phase IIIBy Kenneth Denton, Michael Cutts, Andrew Bursey, Eric Eisold
Phase III of the Orme Street Combined Trunk Relief Sewer project connects two existing 2.13 m diameter combined sewers to a new 3.66 m diameter relief sewer at 7locations along a 970 m alignment in do
Jan 1, 2003
-
Case History Of The Response Of A Longwall Entry Subjected To Concentrated Horizontal StressBy D. Oyler
The National Institute for Occupational Safety and Health (NIOSH) Pittsburgh Research Laboratory (PRL), RAG Pennsylvania and Strata Control Technologies of Australia collaborated in an intensive study
-
Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And StationsBy Marlion T. McQuinn
This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys
Jan 1, 2006
-
Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT StationBy Allan Sylvester
This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant
Jan 1, 2002