Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimización: Método de explotación Sublevel Caving Mina YauricochaBy Alexander Guzmán Y
"El presente trabajo es realizado con el objetivo de optimizar el proceso del método de explotación Sublevel Caving SLC en mina subterránea Yauricocha realizando una mejora continua. La mina Yauricoch
Sep 1, 2017
-
Optimization and Control of Laboratory Sulphidization of Oxidized Copper Ores with an Ion Selective ElectrodeBy Woodcock J. T
A sulphide ion selective electrode (ISE) is suitable for control of sodium sulphide additions in flotation because it has a rapid response to changeS in S2- concentrations, can indicate -low concentra
Jan 1, 1978
-
Optimization And Economic Efficiency Evaluation Of Manganese Nodule Carrier Using Genetic AlgorithmsBy Jae-Hyung Park
Since the Industrial Revolution, the land resources have been decreased rapidly as the industrialization. And this phenomenon brings to our mind an interest in deep-sea resource(manganese nodule). Hen
Jan 1, 2003
-
Optimization and improvements in Dofasco's 165 MT EAF ladle designBy S. Sagar
In September 1996, Dofasco commissioned a 165 Mt twin shell EAF furnace and an associated ladle fleet. During and after this startup, refractory performance in the ladles was optimized on a holistic a
Jan 1, 2004
-
Optimization and Increasing Throughput at JacobinaBy Alexandra Kozak, Rodrigo Costa, Bob Fukuhara
"The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje
Jan 1, 2008
-
Optimization And Increasing Throughput At Jacobina (a9df8bff-6540-4d54-8f51-771ea8d749a4)By R. Costa, A. Kozak, B. Fukuhara
Introduction The Jacobina mine is located in the state of Bahia in northeastern Brazil approximately 330 km northwest of the state capital city of Salvador and 9 km from the town of Jacobina. The
Jan 1, 2007
-
Optimization And Management Of Byproduct Gas Distribution In Steel Mills Under Time-Of-Use (Tou) Electricity PriceBy Xiancong Zhao, Hao Bai, Qi Shi, Zhancheng Guo
Reducing electricity cost is important for energy intensive industries such as the iron and steel industry. With the implementation of time-of-use (TOU) electricity price, plenty of attention has been
Jan 1, 2016
-
Optimization And Modeling On Acidic Leaching Of Low Grade Copper Oxide Ore Using D-OptimalBy D. Moradkhani
Copper metal has important role in the basic industrials, as if it did not exist, modern human life would not develop! Copper leaching, as the first step, is important step in copper production proces
Sep 1, 2012
-
Optimization And Modelling Of Cyanide-free Elution At A Small Gold MineBy Mike D. Adams
Testwork was conducted on loaded carbon samples from a small gold mine in South Africa. It was shown that a 75% saving in reagent consumption in the Zadra elution circuit could be achieved by adopting
Jan 1, 1995
-
Optimization and Precision in Mining, The Simfrag ModelBy Jorge Cárdenas, Alejandro Luna
In mining simulation for fragmentation results prediction is of utmost importance to study feasibility, ensure safety, and estimate the correct use of resources in drilling an explosive to meet requir
Jan 21, 2025
-
Optimization and selection of a surface mine coal-haulage systemBy S. Yang
Based on an analysis of the features found in Chinese surface coal-mining areas, including areas that have already been developed and areas that are in the process of being developed, this paper discu
Jan 1, 2000
-
Optimization For Maximum Production Of Truck/Shovel Mining SystemsBy V. Srajer
Several optimization approaches used by the Canadian mining industry were used to investigate surface coal mining operations in Canada. A computer program was applied to optimize truck/shovel systems
Jan 1, 1989
-
Optimization For The Determination Of Transportation System In Open-Pit MinesBy Q. X. Yun
This paper presents a new approach to optimize the transportation system in open-pit mines. The new approach employs artificial intelligence, fuzzy sets, dynamic programming and CAD technique to deter
Jan 1, 1992
-
Optimization In Flotation PlantsBy A. L. Mular
Optimization strategies of possible interest to mineral processing are reviewed and typical strategies initiated in processing plants to date are discussed. Both On-Line and Off- Line optimization pro
Jan 1, 1976
-
Optimization in Flotation Plants (9dd59534-d6f0-410e-9540-57275a4a2a6a)By E. Woodburn, R. Putman, A. L. Mular
Optimization strategies of possible interest to mineral processing are reviewed and typical strategies initiated in processing plants to date are discussed. Both On-Line and Off- Line optimization pro
Jan 1, 1976
-
Optimization In Large TunnelsBy H. S. Rathor
NTPC (National Thermal Power Corporation), a multi-unit organization, is generating 26% of India’s total power. This power is produced from its 14 coal based stations and 7 gas based stations. NTPC is
Jan 1, 2005
-
Optimization Initiatives at Altonorte on the Path to Becoming a World Class SmelterBy Beatrice Pierre, Juan Carrasco
Altonorte began as a concentrate roasting operation in 1988 under the name of Refimet. In 1993, a copper smelter was built with a design capacity of 203,000 tonnes per annum of concentrate. Since 2001
Jan 1, 2019
-
Optimization Method for Iron Ore Blending Based on the Sintering Basic Characteristics of Blended OreBy Tiejun Chun, Gutian Mu, Jiaxin Li, Hongming Long, Zhengwei Yu, Ning Li
The basic characteristics of iron ore, including assimilation, fluidity, cohesive phase strength and the ability to produce calcium ferrite, are often used to evaluate the sintering properties of iron
Mar 1, 2018
-
Optimization model of surface mine production rateBy J. Changsheng, Z. Youdi
Based on the criteria of maximum net present value per ton of reserves and on the optimum matching of some other essential parameters, a comprehensive optimization model of surface-mine production rat
Jan 1, 2000
-
Optimization Models For Scheduling Ore And Waste Production In Open Pit MinesBy Sizhe Tan
An open pit mining operation can be considered as a production system with at least two products: ore and overburden (waste). A primary mine planning task is to schedule the production of ore and wast
Jan 1, 1992