Search Documents

Sort by

  • AUSIMM
    Optimising Grade Control Procedures in Large and Small Open Pit Mines

    By Khosrowshahi

    A scientific approach to analysing grade control has been applied at a number of mining operations. By dividing the grade control process into the various stages of data collection and interpretation,

    Jan 1, 1992

  • AUSIMM
    Optimising Land for Beneficial Use During and After Mining

    By J Purandare, D Murdoch

    The goal of the life-of-mine plan is to ensure that while the site is left safe, stable and non-polluting, the landscape is such that optimal use can be made of the site post-mining and closure. Howev

    Jun 28, 2016

  • AUSIMM
    Optimising Large Flotation Cell Performance Through Advanced Instrumentation and Control

    By O Tiili, A Dixon

    Many minerals processing plants need to have greater efficiency in current times and optimise their process performance in order to maintain high profitability. This is even more so in the current eco

    Jan 1, 2009

  • AUSIMM
    Optimising Leach Pad Construction Methods for Site Specific Applications

    By Thompson P, Sharma Y

    The paper describes the methodology and results from a study carried out by Telfer Gold Mine to optimise the materials and costs involved in construction of the pad for their dump leach operations.

    Jan 1, 1994

  • AUSIMM
    Optimising Metallurgy at the Planning Stage to Minimise Environmental Impact - A Feedback Loop from Geochemical Waste Characterisation

    By P Mulvey

    "Currently mine process studies and geochemical waste characterisation are considered as two interdependent studies, necessary for the development of the mine and inclusion in the environmental impact

    Jul 15, 2013

  • AUSIMM
    Optimising Mine Ventilation Through the Use of Life-Cycle Production Models

    By C Kocsis, G Baiden, Y Bissiri

    CANMET-MMSL and Penguin Automation Systems Inc have been exploring how process simulation and ventilation modelling software, when combined, can be used to optimise hard-rock/metal mine ventilation sy

    Jan 1, 2005

  • AUSIMM
    Optimising Mining Data, With Emphasis on Rock Quality Designation, to Improve Groundwater Modelling of Fractured Rock Aquifers, (Pasminco Rosebery Mine, Tasmania)

    By R Willis, D Cooke, G J. Davidson

    Mine-groundwater interaction at the Pasminco Rosebery Mine (PRM), western Tasmania, deserves special attention due to the unique climate and mining environment present. High rainfall and low evapotran

    Jan 1, 2003

  • AUSIMM
    Optimising Mining Selectivity with Particular Emphasis on Bench Height : A Case Study at the Telfer Gold Mine, Western Australia

    By Whitham M

    Prior to exploitation, the feasibility of mining and recovering ore can usually be determined to a satisfactory level of uncertainty by the consideration of conceptual scenarios, using a range of r

    Jan 1, 1991

  • AUSIMM
    Optimising Mobile Equipment Resources in Massive Mining

    Mobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The

    Jan 1, 2000

  • AUSIMM
    Optimising Moisture Control for Zinc - Lead Sintering

    By Bowden MW

    Sintering of lead-zinc concentrates is practised by Sulphide Corporation to provide both desulfurised lump sinter feed, for simultaneous reduction to zinc and lead in the Imperial Smelting Process bla

    Jan 1, 1985

  • AUSIMM
    Optimising multivariate variographic analysis with information from multivariate process data modelling (partial least squares regression)

    By L O. Filippov, Q Dehaine

    Variographic analysis, a classical tool from the Theory of Sampling (TOS), can address practical situations with multiple variables; however, its application has very often been limited to one variabl

    May 9, 2017

  • SME
    Optimising Open Pit Design And Sequencing

    The authors give a corrected form of the Korobov algorithm of optimal open pit determination and describe a method of optimising the mining sequence within a preliminary pit design. A method of automa

    Jan 1, 1992

  • AUSIMM
    Optimising Open Pit Mine Production Scheduling by Graph Theory

    By J M. Wang, Q M. Hao

    A mathematical model is set up to solve the problem of optimal design of the production scheduling on exacting open pit mine. At the same time, the establishment of model in operation condition and it

    Jan 1, 2003

  • CIM
    Optimising Open Pit to Underground Cut-over

    By Anthony Finch

    Many mines combine open pit with underground mining, and on many occasions the underground mine is an extension of the open-pit. In these circumstances the decision about where the open-pit stops and

    May 1, 2011

  • AUSIMM
    Optimising Pit Slope Design at Kidston Gold Mines

    Kidston Gold Mines Limited (70 per cent Placer Pacific and 30 per cent Public Shareholders) has been mining the Wises Hill Pit since late-1984. The Wises Hill Deposit is a large low grade gold deposit

    Jan 1, 1992

  • AUSIMM
    Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis

    By H Kurth

    Geoscan is used for multi-elemental analysis of conveyed bulk materials in real time. It has been used for coal analysis since the 1990s, in the cement industry, and since 2003 for measuring mineral o

    Sep 7, 2015

  • CIM
    Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis (ca3c00f6-f1ec-4b33-9dcb-bab9729026ee)

    "Geoscan is used for multi-elemental analysis of conveyed bulk materials in the minerals industry with proven performance and demonstrated paybacks of weeks or months in iron ore, manganese, copper, z

    Jan 1, 2016

  • AUSIMM
    Optimising Project Value and Robustness

    By W Stange, N Hanson

    An important aspect of the project evaluation process is the achievement of a clear and quantitative understanding of the primary drivers influencing project value and risk. A business scenario-based

    Jan 1, 2007

  • SAIMM
    Optimising Project Value And Robustness (77d01627-3b0d-44f3-b691-f65dafcd411c)

    By G. Whittle

    An important aspect of the project evaluation process is the achievement of a clear and quantitative understanding of the primary drivers influencing project value and risk. A business scenario-based

    Jan 1, 2007

  • AUSIMM
    Optimising Raising Development Using the Drop Raise Method at DOZ Mine PT Freeport Indonesia

    By M E. Rakidjan

    The DOZ underground mine at PT Freeport Indonesia is a copper and gold mine in Indonesia with current ore production of 42 000 tpd. Because of the mine expansion into the West DOZ more ventilation rai

    Jan 1, 2005