Search Documents

Sort by

  • AUSIMM
    Optimisation of Operating Parameters for Cyanidation of Sulfide-Bearing Gold Flotation Tailings in order to Prevent the Impact of Cyanicides

    By B Levasseur, C Olsen, E Ghasemian Langeroudi, F Larachi, F Safizadeh, C Gagnon

    Gold recovery by the cyanidation process is often accompanied by the leaching of other species. This leads to the depletion of the level of free cyanide and oxygen available for gold cyanidation. The

    Sep 26, 2013

  • AUSIMM
    Optimisation of Ore Selection in Mining: Method and Case Studies

    By Rolley P

    In the course of reviewing grade control practices at the Marvel Loch gold mine in Western Australia in 1992, FSSI Consultants developed and implemented a novel approach to ore selection using a met

    Jan 1, 1997

  • AUSIMM
    Optimisation of Overburden Blasting Mount Thorley Colliery

    By Mckenzie CK, Scott A

    The injection of coal as an auxiliary fuel in ironmaking blast furnaces has been introduced on many furnaces worldwide. This paper examines the present practice of coal injection and discusses fut

    Jan 1, 1987

  • TMS
    Optimisation of Pellet Reduction in a Phosphorus Furnace

    By C. Dresen

    This paper discussed the reaction kinetics of the reduction of industrial phosphate pellets for P4 production. In the reduction process of various phosphate ores, the following parameters were investi

    Jan 1, 2002

  • DFI
    Optimisation Of Pile Type To Support Major Structures Above A Deep Sand Profile - Synopsis

    By P. Davies

    The Hillside Smelter presently under construction at Richards Bay, Republic of South Africa, will be, on completion, the fifth largest aluminium smelter in the world. The site selected for this plant

    Jan 1, 1996

  • SAIMM
    Optimisation of pit to sag mill network using mixed integer linear programming APCOM 2021

    By Z. Saw, C. Poveda, N. L. Mai

    Optimising the throughput of a mining network comprising all equipment from shovels to semi-autogenous grinding (SAG) mills is a complicated task, yet the potential benefits can be significant. Key mo

    Sep 1, 2021

  • CIM
    Optimisation of Process Parameters of Spiral Concentrator for Beneficiation of Iron Ore Stacked Slimes from Kirandul, Chattisgarh, India

    By S. K. Sharma, Sanket Bacchuwar, Prabal Kumar Agrwal, G. V. Rao

    "Iron ore processing industries play a vital role in the Indian economy. At present Iron ore of around +64% Fe is used for production of Iron through blast furnace. To produce +64% Fe from low/medium

    Jan 1, 2016

  • AIME
    Optimisation of Production Capacity for Maximum Profitability of a Copper Mine at Rio Tinto, Spain

    By J. A. Botin, K. H. Singh

    INTRODUCTION The Alfredo underground mine is one of the three mining operations of Rio Tinto Minera, S.A., all near the community of Rio Tinto in Huelva province of southwest Spain. The other two

    Jan 1, 1981

  • AUSIMM
    Optimisation of Reinforcement Design of Coal Mine Roadways

    By Fabjanczyk MW, Guy RJ, Tarrant GC

    The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of securi

    Jan 1, 1992

  • SME-ICGCM
    Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)

    By Winton J. Gale

    The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o

    Jan 1, 1992

  • AUSIMM
    Optimisation of Rock Disintegration Based on Acoustic Background of Drilling Machine

    By J Fut=

    The rotary drilling of rocks is widespread technology in mining and in tunnelling. The paper describes the results of research by aim to find relationships between optimal drilling and sound signal of

    Jan 1, 2003

  • AUSIMM
    Optimisation of Rotary Drilling

    Optimising drill performance has always been a primary goal of drilling and blasting managers. Improving drilling rates and utilisation will ultimately drive the cost per foot or metre downward. Ad

    Jan 1, 1995

  • AUSIMM
    Optimisation of Sampling Procedures at the Fimiston Open Pit, Kalgoorlie

    By Chapman G. J

    Mining operations require detailed and precise methods and procedures for the optimum selection of ore from waste. A fundamental procedure applied to achieve this selection is accurate sampling. The k

    Jan 1, 1993

  • SAIMM
    Optimisation Of SiMn Production At Transalloys

    By J. Griesel, P. H. F. Bouwer, K. Bisaka

    Transalloys produces 160 000 tons of SiMn per annum from five AC submerged-arc furnaces. The lime-ore melt from two AC open-arc furnaces is contacted with SiMn to produce 50 000 tons of medium carbon

    Jan 1, 2004

  • SME
    Optimisation Of Single-Layer Cover Made Of Desulphurized Tailings: Application To The Doyon Mine

    By I. Demers

    Doyon mine, Quebec, Canada evaluates the possibility of desulphurizing their tailings to produce material to be used in as cover over the acid generating tailings disposal site. Laboratory tests were

    Jan 1, 2008

  • AUSIMM
    Optimisation of Slope Angles at Rosario Mine, Collahuasi

    By A R. Bonani, M P. Pe±a

    The optimisation of slope angles, that is to say, increasing them, compared to the original design is always the subject of analysis of stability for geotechnical engineers and economic analysis for p

    Jan 1, 2007

  • SAIMM
    Optimisation Of Specific Power Consumption In The Production Of Ferro Alloys Through Rationalisation Of Charge Distribution

    By S. Ranganathan

    Production of ferro-chromium in the submerged-arc furnace is highly energy-intensive. Several process rates have been attempted to reduce the specific energy consumption in the production of this allo

    Jan 1, 2007

  • AUSIMM
    Optimisation of Spray Collers for Cooling Deep Coal Mines

    By Hagen G, Uhlig H

    In the Federal Republic of Germany the thermal environment in underground coal mines has deteriorated progressively over the past years. The number and capacity of refrigeration plants have increa

    Jan 1, 1988

  • AUSIMM
    Optimisation of Steam and Energy Usage in a Nickel Refinery

    The nickel refinery at Yabulu consumes an average of 118,000 kg/h of low pressure steam in stripping operations to-recover ammonia and carbon dioxide from product liquor and ore tailings streams. The

    Jan 1, 1985

  • AUSIMM
    Optimisation of surface tailings storage and tailings backfill – a case study

    By B P. Wrench, N R. Steward, C Wu

    A gold mine in southern China has transitioned from an open pit operation to a fully underground mine. An overhand mining method is used which requires the mined stopes to be filled with backfill havi

    Jul 23, 2018