Search Documents

Sort by

  • AUSIMM
    Optimisation of copper treatment at Mount Isa Mines Limited

    By Canning RL, Pritchard J

    The surface treatment works in the Mount Isa Mines Limited copper stream consist of a concentrator and smelter with annual capacities of 5.6 million tonnes of ore and production of 155 000 tonnes

    Jan 1, 1986

  • IIMP
    Optimisation of Crushing and Grinding Circuits Using Steady-State Simulation

    By C. A. Brown

    "Steady-state simulation has been used for over 20 years to optimise the operation of crushing and grinding circuits. Throughout that period continuing comminution research has been the basis for impr

    Sep 12, 2005

  • AUSIMM
    Optimisation of Cut-Off Grade at Mount Isa Mines Limited Æs Enterprise Mine

    By G MacSporran, I Sheppard

    The practical application of LaneÆs theory on optimum cut-off grade policy has to date proved difficult for selective stoping in large-scale underground mining. The key to determining an optimum cut-o

    Jan 1, 2003

  • AUSIMM
    Optimisation of Cut-off Grades During Design of Underground Mines

    The theory of declining optimimum cut-off grades is more than 25 years old, but for a number of reasons it is still not widely used in industry. A lack of faith in the veracity of estimated grades i

    Jan 1, 1991

  • AUSIMM
    Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai Mine

    By D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah

    Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected

    Aug 24, 2015

  • AUSIMM
    Optimisation of Electrowinning Operations at Girilambone Copper Mine

    By Braaksma M, Dudley K

    The Girilambone Copper Mine is located in central New South Wales and has been operational since May 1993. Girilambone is operated by the Girilambone Copper Company (GCC) which is a joint venture b

    Jan 1, 1996

  • AUSIMM
    Optimisation of Excavator Performance When Mining Complex Polymetallic Ores

    By U Dzharlkaganov, B Bekmurzayevand M

    The principle conception is presented of timely planning of winning operations in complex-structural blocks and faces in week-24-hourly regime. For adequate description of complex interconnections of

    Jan 1, 2003

  • AUSIMM
    Optimisation of Flotation Circuit Configuration at PT Newmont Nusa Tenggara

    By K McCaffery, R P. Halomoan

    Two column flotation cells have been installed as single-stage rougher cleaners at Batu Hijau. The objective was to provide additional residence time in the cleaner circuit to maintain maximum recover

    Jan 1, 2007

  • SAIMM
    Optimisation Of Flotation Circuit Configuration At PT Newmont Nusa Tenggara (cfd7ecd0-efe3-4487-b843-71559e2ce6be)

    Two column flotation cells have been installed as single-stage rougher cleaners at Batu Hijau. The objective was to provide additional residence time in the cleaner circuit to maintain maximum recover

    Jan 1, 2007

  • AUSIMM
    Optimisation of Flotation Circuits With Large Flotation Cells

    The recent trend of installing flotation cells with volumes as large as 200 m3 in concentrators is driven mainly by economic considerations such as lower capital, operating and maintenance costs. Desp

    Jan 1, 2005

  • CIM
    Optimisation of Flotation Pulp Selectivity Utilising Nodal Analysis

    By Kym Runge, Emmy Manlapig

    "The objective of an industrial flotation circuit is to separate valuable minerals from non-valuable minerals utilising differences in their flotation recovery rate. Regrinding and reagent addition ar

    Jan 1, 2004

  • AUSIMM
    Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines Limited

    By Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD

    This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the

    Jan 1, 1985

  • IMPC
    Optimisation of Grinding Process in a Magnetite Ore Beneficiation Plant

    By M. D. Vilarinho, W. Xuan, F. Vasconcelos Guimarães

    "This article summarises the efforts to reduce the energy consumption in grinding in a magnetite ore beneficiation plant. ArcelorMittal Kryvyi Rih ore beneficiation plant produces magnetite concentrat

    Jan 1, 2018

  • AUSIMM
    Optimisation of Hydraulic Filling for Underground Disposal of Tailings in Peru

    By D M R Stone

    Failings di,posal presents many challenges at metal mines in Peru where the extreme relief yields very little useable land area. These challenges are amplified by other hazards such as the high seis

    Jan 1, 1998

  • AUSIMM
    Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes Mines

    By F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan

    "Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th

    Oct 10, 2016

  • AUSIMM
    Optimisation of Length of Retreat Longwall Faces

    By Misra A

    After review of the status of research on optirnisation of retreat longwall faces it is argued that an acceptable optimisation model must be based upon realistic cost data that take into account not o

    Jan 1, 1995

  • IMPC
    Optimisation of Mill Feed by LIF Techniques

    By Heribert F. Broicher, Arne Volland

    "The analysis of laser-induced fluorescence (LIF) combines remote sensing techniques with laser spectroscopy. Over variable distances different rock types are identified or changes in the quality of o

    Jan 1, 2003

  • IMPC
    Optimisation of Mill Feed by LIF-Techniques (cbc3fba8-2d89-4297-b837-793bda5fb340)

    By Heribert F. Broicher, Arne Volland

    The application of remote sensing techniques combined with fluorescence spectroscopy is realised in analytical devices called LIF Analysers. The analysis of laser-induced fluorescence facilitates non-

    Jan 1, 2003

  • AUSIMM
    Optimisation of Mines and Smelters by the Application of Improves Computing Systems

    By Quayle J. E

    This paper covers period from 1973 through to 1988 and the mines of West Coast Mines, Elur Mine, North Mine and Risdon Zinc Smelter, now all part of the Pasminco Group. During this period, optimisat

    Jan 1, 1991

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007