Search Documents

Sort by

  • SAIMM
    Long-Term Mine Production Scheduling

    By G. C. S. Burns

    "A system has been developed to simulate the mining of the Mufulira orebody. The main output from the system is a picture-gram from which the start date and effective life of all proposed mining faces

    Jan 1, 2014

  • CIM
    Long-Term Mine Production Scheduling Optimization and Strategic Planning Under Complex Operational Constraints

    By Kadri Dagdelen

    Recent trends of the mining project show that there will be more and more mechanized, largescale mining operations with complex process options to make low grade deposits economically feasible to deve

    Oct 1, 2009

  • AUSIMM
    Long-term Monitoring and Targeted Assessments to Improve Management of Mine Wastes – the Batu Hijau Project

    By S L. Simpson, J Waworuntu, B M. Angel

    "The Batu Hijau copper/gold mine, operated by PT Newmont Nusa Tenggara, is located in the south-western part of Sumbawa Island, Indonesia, and is situated ~10 km from the south coast at an altitude of

    Jun 28, 2016

  • AUSIMM
    Long-Term Monitoring of Water Infiltration Through Covers at White Æs Waste Rock Dump at the Rum Jungle Mine Site Using Lysimeters

    By A I. M Ritchie, G P. Timms

    Monitoring of water infiltration into WhiteÆs waste rock dump at the Rum Jungle mine site in the Northern Territory, Australia, started in 1983, and has since produced a unique and long-running data s

    Jan 1, 2003

  • AUSIMM
    Long-Term Performance and Cost Benefit Analysis of Passive Acid Mine Drainage Treatment Systems Installed in the Appalachian Coal Region of the Eastern United States

    By J S. Simmons, J G. Skousen

    This project evaluated the performance of nine passive treatment methods by studying 137 treatment units in eight eastern states. Performance was normalised according to construction cost, projected s

    Jan 1, 2003

  • DFI
    Long-Term Performance of a Deep Mixed Column-Wall at Arabianranta Area (Helsinki, Finland)

    By Leena Korkiala-Tanttu, Ilkka Vähäaho, Juha Forsman, Paavo Lahdenperä, Kalle Rantala, Osmo Korhonen

    "District of Arabianranta (Helsinki, Finland) has been founded on an old seabed, which was filled with miscellaneous soil materials. The subsoil consists of very low shear strength clays and organic c

    Jan 1, 2015

  • SME
    Long-Term Performance Of An Integrated Bioreactor And Wetland Treatment System At The Forest Queen Mine Site In Silverton, Co

    By S. Odell

    The Bureau of Land Management (BLM) has constructed two biochemical reactor systems (BCRs) to treat mining influenced water from the Forest Queen Mine near Silverton, CO. The bioreactors coupled with

    Jan 1, 2010

  • CIM
    Long-Term Performance of Dry Cover Systems for Reactive Mine Waste

    By David Christensen

    The long-term performance of dry covers is being examined in a research study funded by the International Network for Acid Prevention (INAP). The study was separated into two phases. The two main comp

    Nov 1, 2002

  • SME
    Long-Term Performance Of Passive Acid Mine Drainage Treatment Systems

    By P. F. Ziemkiewicz

    This project evaluated the performance of nine passive treatment methods by studying 137 treatment units in eight eastern states. Performance was normalized according to construction cost, projected s

    Jan 1, 2003

  • DFI
    Long-Term Performance Of Wind Turbine Foundations Through Numerical Modeling

    By Spencer Ness, Yazen Khasawneh, William Tjaden, Mohammad Nassim

    The evaluation of long-term performance of the wind turbine structures is essential in lowering the Levelized Cost of Electricity (LCOE) from wind sources. The required maintenance of the wind turbine

    Oct 1, 2022

  • CIM
    Long-Term Planning at Raglan

    By Lee W. T. Weitzel

    This paper reviews the Falconbridge- SMRQ?s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    May 1, 2002

  • CIM
    Long-term planning at Raglan (b8ce356e-c666-4ad8-a03a-11ba76659079)

    By L. W. T. Weitzel

    "This paper reviews the Falconbridge- SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    Jan 1, 2003

  • SAIMM
    Long-term planning for the rehabilitation of opencast workings

    By J. D. Wells

    An account is given of the planning required for the rehabilitation of land that is to be disturbed by opencast mining, and of the preparation of rehabilitation of land that is to the Inspector of Min

    Jan 1, 1986

  • CIM
    Long-Term Planning of an Underground Mine Using Linear Programming

    By George McIsaac

    This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore z

    May 1, 2003

  • CIM
    Long-term planning of an underground mine using mixed-integer linear programming

    By G. McIsaac

    This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore z

    Sep 1, 2005

  • CIM
    Long-term planning of an underground mine using mixed-integer linear programming (3f914add-ff63-4567-994a-ce69fb049d25)

    By G. McIsaac

    "This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore

    Jan 1, 2005

  • SAIMM
    Long-term Planning of Coal Mines by Statistical Evaluation of Databases in Existing Mines

    By D. E. Kraushaar

    Ruhrkohle in West Germany evaluates and compares the net present values of long-term periods from its coal mines by a computer assisted long-term planning system. Two main parts of this system are com

    Jan 1, 1987

  • SME
    Long-Term Production Scheduling In Underground Coal Mines - An Application Of Sequencing Theory

    By J. West-Hansen

    The problem of long-term production scheduling in an underground coal mine is approached through the concepts of sequencing theory. Based on a typical layout of mining sections, the principles for the

    Jan 1, 1986

  • SME
    Long-Term Production Scheduling Using A Multidimensional Computerized Model

    By F. Leschhorn

    A computer model for long-term production scheduling is presented. By combination of different operations research algorithms it has been possible to design a system which is able to solve difficult l

    Jan 1, 1989

  • NIOSH
    Long-Term Response Of A Coal Mine Roof To Time Lapse Between Exposure And Support

    By Daryl E. Radcliffe

    The Bureau of Mines, as part of an agreement with the Bear Coal Co., Somerset, Col o., evaluated the response of a coal mine roof to time lapse. Time lapse, the interval between exposure and support o

    Jan 1, 1980