    Designing and Operating Backfill Systems on a South African Gold Mine

    For effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,

    Jan 1, 1998

  • AUSIMM
    Designing and Operating Heap Leaching Processes with Both Eyes Open

    Process engineering principles are used to analyse the features of leaching processes for large masses of low grade, unprocessed ore. Different performance characteristics are related to the numerou

    Jan 1, 1994

  • AUSIMM
    Designing and Planning for Maximum Grinding Mill Availability - A Team Approach

    The mineral processing industry is in boom times. The focus on mill availability and therefore profitability has never been greater, as grinding mill maintenance often dictates the entire plant shut d

    Jan 1, 2008

  • ISEE
    Designing Blasts by Simulation Rather than Solely by Trial/Error

    By Roger Favreau, Patrice Favreau

    Without blasting there can be no roads, no hospitals, no factories, not even foundations for homes. Yet in 1960 the only way to design a blast was by trial/error. By comparison, bridges were already d

    Jan 1, 2013

  • ISEE
    Designing Blasts with Uncertainty and Tolerance

    By Calvin J. Konya

    When blasts are designed, we normally assume the best case situation. We assume that all burdens and spacings will be properly drilled, holes will be properly loaded, initiators will fire at the nomin

    Jan 1, 1990

  • SME
    Designing Continuous Conveyor Systems in Urban Environments: The 63rd Street Access Tunnel in New York City

    By Dean Workman

    Located in downtown New York City, this project necessitated an innovative conveyor design for successful muck removal. This paper will discuss the technical challenges and engineering solutions of th

    Jan 1, 2008

  • SAIMM
    Designing curved pulp lifters for the Sarcheshmeh Copper Complex SAG mill using discrete element method modelling, M. Rezaei, M. Maleki-Moghaddam, A. Ghasemi, A. Fazeli, and S. Banisi

    By S. Banisi, A. Ghasemi, A. Fazeli, M. Rezaei, M. Maleki-Moghaddam

    The efficiency of high capacity SAG mills which consume large amounts of energy depends on the grinding and slurry discharge systems. A 9.7 m × 4.8 m SAG mill with radial pulp lifters is used at the S

    Jan 1, 2020

  • AUSIMM
    Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case Study

    By P Crittenden

    Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant

    Jan 1, 2009

  • SAIMM
    Designing exploitation and dumping processes in brown coal mines using information technology techniques

    By R. Chryst, R. Kus

    In the Integrated IT Systems proposed by Przedsie? biorstwo Robót Geologiczno-Wiertniczych—Geological and Drilling Company (PRGW) a network connects a database with all of the departments of a mining

    Jan 1, 2003

  • AUSIMM
    Designing Feedwells for the 21st Century

    In the current climate, there is a real need to bridge the gap between theory and the real world mining considerations, and develop viable, cost-effective, high performance thickeners. With a greater

    Jan 1, 2008

  • AUSIMM
    Designing Flotation Cells For Optimised Flow Dynamics

    By T Niitti, J Turunen, P B, A Rinne

    In todayÆs marketplace, with high metals prices, many operations are faced with the challenge of improving recovery in the particle size ranges which are normally difficult to recover. This presentati

    Jan 1, 2006

  • AUSIMM
    Designing Flotation Circuits for High Fines Recovery

    By D C. Curry, M F. Young

    Many flotation operations need to improve liberation to increase recovery, yet often plant operators are concerned that finer grinding will produce æslimesÆ with low flotation recovery. Yet simple cir

    Jan 1, 2005

  • CIM
    Designing for Closure And Beyond: The Perspective from Financial Institutions

    WHAT IF? ?Mine closure and reclamation liabilities were fully funded -at all times from current mine revenues ?Unexpected & catastrophic events were insured ?Remediation costs could be capped ?Ris

    May 1, 2006

  • SAIMM
    Designing for Extreme Events in Open Pit Slope Stabilty

    By L. Lorig

    "Two types of extreme event, earthquakes and rainfall, potentially affect open pit slope stability. In the case of earthquakes, there are rather well-developed analysis procedures and acceptability cr

    Jan 1, 2016

  • AUSIMM
    Designing for Maximum Production from Trucks and Loaders

    In many mining operations, the truck and loader equipment represents the bulk of the invested capital and the majority of the mine operating cost. The profitability of these mines is therefore crit

    Jan 1, 1983

  • SME
    Designing for Optimized Tailings Storage Economics

    By Donald R. East

    The impacts of the economic storage or disposal of mill tailing wastes are becoming more important to the mining industry as environmental regulations become more demanding. Mill tailings have long b

    Jan 1, 1990

  • CIM
    Designing For Paste Thickening

    By Tim Edwards, Richard Triglavcanin, Ian Arbuthnot, Darren Colwell, Brad Garraway, Ken Roberts

    "In the mineral processing industries, there is an increasing need to design thickeners which are able to produce high density underflows usually referred to as “paste”.The behaviour of a flocculated

    Jan 1, 2005

  • SME
    Designing for Process Control at Mingo Logan

    By Bruce Hern

    The last 10 years have seen a dramatic increase in the requirements for product coal quality control. This has led to electric utility sulfur scrubbing, metallurgical blast furnace optimization and co

    Jan 1, 1994

  • AIME
    Designing For Tailing Disposal In The Southwest

    By E. V. Given

    Designing a tailing dam is a major step toward fully integrated mill operation. In the case of large concentrators considerable planning is necessary, and the site of the tailing disposal area may ver

    Jan 7, 1959

  • SME
    Designing For Upper Seam Stability In Multi-Seam Mining

    Research has determined that ground control interaction problems in mining over a previously mined seam occur primarily in the tension zone created at the edge of the subsidence trough, and in areas a

    Jan 1, 1988