Search Documents

Sort by

  • SME
    Continuous Elution of Gold from Activated Carbon

    By Francois J. E. Scholtz, Raymond J. Davidson, Peter Greenhalgh, R. Paul Riley

    A 1 t/d continuous elution pilot plan is being operated by General Mining at their Grootvlei Gold Mine using the technology developed at the Anglo American Research Laboratories. Flowsheet design and

    Jan 1, 1990

  • TMS
    Continuous Estimation of Phosphorus Content of Molten Copper

    By Kimura. E.

    Continuous estimation of phosphorus content of molten copper is required to produce phosphorus deoxidized copper in a continuous casting operation. The phosphorus content of molten copper was related

    Jan 1, 1992

  • CIM
    Continuous Evolution of Porcupine Joint Venture (PJV) Dome Mine's Effluent Treatment Plant

    By T. Y. Chong, J. A. Folinsbee

    Since milling began in 1909, the PJV Dome mill has been expanded several times, to the current throughput of 11,500 tonnes per day. PJV recovers free gold using crushing and grinding followed by gravi

    Jan 1, 2005

  • AIME
    Continuous Excavators (Bucket Wheel And Chain Diggers)

    By Reinhard H. Wöhlbier, George E. Aiken

    8.4-1. Introduction. Surface excavating is done on a continuous basis with a variety of machines: 1) trenchers and ditchers, 2) conveyor loaders, and 3) bucket-chain and bucket-wheel excavators (BWE).

    Jan 1, 1968

  • SME
    Continuous Face Haulage: A Practical And Documented Reality

    By D. C. Torre

    The need for a successful, efficient and reliable continuous face- haulage .system for use with continuous mining machines has been apparent since the first continuous miners were introduced some twen

    Jan 1, 1977

  • SME
    Continuous Ferric Chloride Leaching Of Galena

    By J. E. Murphy

    The Bureau of Mines demonstrated ferric chloride leaching of galena concentrate on a continuous bench-scale basis. Leaching was performed at 95° C and with a contact time of 15 min. The ferric chlorid

    Jan 1, 1984

  • AIME
    Continuous Ferric Chloride Leaching Of Galena

    By B. R. Eichbaum, J. E. Murphy, J. A. Eisele

    The US Bureau of Mines demonstrated ferric chloride leaching of galena concentrate on a continuous bench scale basis. Leaching was performed at 95°C (200°F) and with a contact time of 15 minutes. The

    Jan 1, 1986

  • AIME
    Continuous Filtration Of Precipitates

    By R. C. Emmett, D. A. Dahlstrom

    Application of continuous filtration to precipitate dewatering requires not only careful equipment selection, choice of appropriate media, but also close control of precipitation technique itself.

    Jan 1, 1961

  • DFI
    Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile Design

    By Jesse R. Jacobson

    A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of

    Jan 1, 2011

  • SME
    Continuous Flocculation Processes

    By H. Suharyono

    The results of an experimental study of polymer-induced flocculation of clay suspensions in continuous, stirred-tank reactors are presented. The effects of polymer dosage, mixing time and mixing inten

    Jan 1, 1994

  • AIME
    Continuous Formation Of Gouge And Breccia During Fault Displacement

    By Eugene C. Robertson

    INTRODUCTION A direct proportionality between the observed displacement of a fault and its thickness of breccia and gouge has been proposed recently (Robertson, in press). To validate this finding

    Jan 1, 1982

  • TMS
    Continuous Fuming of Zinc-Containing Slags

    By G. G. Richards

    "The slag fuming process has operated for close to 70 years to recover zinc from lead blast furnace slag. The process is normally carried out through the batch treatment of slag by submerged injection

    Jan 1, 1996

  • CIM
    Continuous gas holdup estimation in a laboratory mechanical cell using Maxwell's model

    By L. Magne, M. Maldonado, R. Varela

    Real-time optimization of flotation circuits demands for accurate and reliable measurements to support the decision making process. The collection zone gas holdup is an important variable in this cont

    Jan 1, 2015

  • CIM
    Continuous Gas Holdup Measurement in Flotation Columns

    By R. Pérez, James A. Finch, F. Tavera, Cesar O. Gomez

    "Gas holdup is a variable which affects the operation of flotation columns. On one hand, gas holdup is a function of bubble size (a function of sparger type, frother characteristics and concentration,

    Jan 1, 1995

  • NIOSH
    Continuous Gas Monitoring Using Tube Bundles At The Joanne Mine Fire

    By L. E. Dalverny

    This Bureau of Mines report describes the deployment, 5-month operation, and lessons gained from a continuous gas monitoring system using sampling-tube bundles at an underground mine fire in West Virg

    Jan 1, 1975

  • SME
    Continuous Gaseous Reduction Process For Metal Recovery

    By C. M. Sliepcevich

    This paper is a brief status summary of investigations by the authors over the past decade to develop a continuous process for recovering' high purity metal powder from pregnant solutions by gase

    Jan 1, 1975

  • DFI
    Continuous Grouting In Embedding Of Sheet Piles

    By Jouko L. Lehtonen

    Sheet pile walls can be sealed watertightly using various methods. The objective of this paper is to introduce a new innovation comprising the use of continuous cement grouting during embedding. The m

    Jan 1, 2006

  • SME
    Continuous Hard Rock Breakage And Its Potential Effect On Deep-Level Mining

    By N. G. W. Cook

    The conventional cyclic system of deep-level mining by drilling and blasting gives rise to an inadequate degree of stope sorting when mining thin reefs. This results in poor utilization of the capital

    Jan 1, 1969

  • SME
    Continuous Haulage In The Surface Coal Industry

    By John P. Fillion

    This paper will present an overview of conveyor haulage systems. Technical and economic feasibility will be examined as conveyor haulage is applied to large western surface coal mines. Theoretical ana

    Jan 1, 1989

  • AUSIMM
    Continuous Haulage Prospects for Underground Coal Mines

    Detailed observations were made for two existing continuous miner and shuttlecar systems. A simple model for the shift average cycle consisted of three time components - delays, mining and transport

    Jan 1, 1982