Construction And Performance Of A Mixed Face Tunnel ExcavationBy William R. Beloff, Franklin M. Grynkewicz, Puza
Construction of the MBTA Red Line Extension through Somerville, MA, called for driving twin tube tunnels through a zone of approximately 83m (273 ft) with mixed face conditions. While the majority of
Jan 1, 1981
-
Construction And Preliminary Evaluation Of A Die El Exhaust Particulate Filter For Underground UseBy Robert W. Freedman
In the Bureau of Mines study, a filter with a 20-by 20-inch-square cross section was inserted into the exhaust ducting of a 4-stroke-cycle, 90-hp diesel engine, and the efficiency of removal of total
Jan 1, 1979
-
Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design ParametersBy Martin D. Larisch
The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.
Nov 1, 2022
-
Construction And Testing Of A Junk Auto IncineratorBy C. J. Chindgren
A refractory-lined, garage-type automobile incinerator with a natural gas afterburner for air pollution control was cooperatively constructed and tested by the Bureau of Mines and the Wasatch Metal &
Jan 1, 1970
-
Construction and Utilisation of the Olympic Dam Service DeclineThe mining production rate of two million tonnes per annum at Olympic Dam required greater servicing capacity than was available with the existing Whenan Shaft. To increase servicing capability a
Jan 1, 1988
-
Construction and Utilization of a Field Data Sheet for Consideration of Rock Engineering Problems in Underground Hard Rock Mining.By Radford B. Langston
Mining Methods Majority of Production Ramp and Fill at Stillwater, Sub-level Becoming More Important Production at East Boulder from Sub-level l Majority JM REEF ROCK TYPES NORITE - plagioclase
May 1, 2002
-
Construction And Verification Of Large Bored Pile For Bridge Foundation Through Deep Weak Alluvial Soil Layers And Artesian AquiferBy C. Dai, S Raathiv
The Waikato Expressway is one of the New Zealand Transport Agency’s (NZTA) seven roads of National Significance. Coffey is part of the City Edge Alliance engaged by NZTA for the Hamilton Section of th
Nov 1, 2022
-
Construction Blasting in Central OregonBy Paul Schmiesing, Matt Higgins
Central Oregon is a fast growing resort community centered in Bend, Oregon. Bend is bordered by the Cascade Mountains to the west and the high dessert to the east. Central Oregon is blanketed with lav
Jan 1, 2000
-
Construction Challenges of the Anderson Dam Tunnel Project - NAT2022By Ron Drake
The Anderson Dam Tunnel Project is a high-priority, urgent project under construction by the Santa Clara Valley Water District in California. The project will provide a new low-level outlet for the An
Dec 1, 2022
-
Construction Considerations For Ground Modification Projects ? SynopsisBy J. P. Welsh
Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan
Jan 1, 2010
-
Construction Control Instrumentation Used During Tunnel EnlargementBy Raymond P. Miller, David L. Monson, Robert A. Robinson
A geotechnical instrumentation program consisting of borehole extensometers and portable tape extensometer stations was effectively used to monitor concrete liner deformations and guide construction p
Jan 1, 1976
-
Construction CostsBy Cerutty L
To those who have been engaged in the construction of mining and metallurgical plants during the war and post-war periods, it is quite unnecessary to point out the large increases and violent fluctuat
Jan 1, 1922
-
Construction Delays And DisruptionsBy Bernard Lippe
The successful construction project is one in which the component construction operations are completed within the scheduled time and cost parameters. Most construction projects, however, are subje
Jan 1, 1974
-
Construction Dewatering Challenges in Urban EnvironmentsBy Rafael A. Rivera
"Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re
Jan 1, 2017
-
Construction Difficulty Index For Tunnel ConstructionBy Sigmund J. Sulinski
The following is a progress report on a continuing study being made by the Sanitary District for purposes of developing reliable data for predicting costs and progress on future tunnel contracts. All
Jan 1, 1997
-
Construction Induced Vibration during Sheet Pile and Pile Driving in Deep ExcavationBy Ambarish Ghosh, Subhaprasad Chakraborty
"Construction of basement floors has become necessary to meet the requirement of parking in office and residential complexes and in hospitals for radiotherapy treatment. Important projects coming up i
Jan 1, 2015
-
Construction Issues Encountered In The Installation Of Building Foundations As Ground-Source Heat ExchangersBy W. Zitz
Incorporation of heat exchangers into drilled shaft foundations is a novel approach to both improve the energy efficiency of building heat pump systems and provide necessary structural support using t
Jan 1, 2011
-
Construction Labour Relations in the Mining IndustryBy W. J. Gibson
"This paper will provide a general assessment of the differences in construction and industrial labour relations. From this outline will come a detailed examination of labour relations in the construc
Jan 1, 1972
-
Construction Management And Team Effort Soft Ground Tunnel Project, Alexandria, EgyptBy Chaitanya "Teny" Mittal
INTRODUCTION A team effort by the Owner, Engineer, and Contractor can help avoid serious problems on a construction project. It can save cost and time for both Owner and Contractor, as illustrated
Jan 1, 1989
-
Construction Management of Hydrogeological Aspects of Melbourne City Link ProjectBy I A. Lamb
The Melbourne City Link Project has two tunnels, the Domain and Burnley Tunnels, which have been constructed by Transfield Obayashi Joint Venture (TOJV) under a design and construct contract. The two
Jan 1, 1999