Search Documents

Sort by

  • AIME
    Computerized Control And Warning System For Uranium Mines

    By C. T. Sheeran, J. C. Franklin

    A commercially available microprocessor-based system capable of monitoring 512 channels has been interfaced with monitors for radon, working level, air velocity, and fan power. The basic system utiliz

    Jan 1, 1982

  • SME
    Computerized Control At The Deserado Mine

    By R. P. Upadhyay

    The Deserado Mine, located in northwest Colorado, is an underground coal mine designed to produce 1.225 million tons (1.35 million short tons) of clean coal per year for the Bonanza Plant located in n

    Jan 1, 1988

  • TMS
    Computerized Control for a Cooling Tower at Asarco's Amarillo Copper Refinery

    By B. Willit, J. Martin

    "Continued emphasis on water and energy conservation with less operator attention has created a need for more sophisticated cooling tower controls. A joint Betz/ASARCO project has produced a computeri

    Jan 1, 1989

  • SAIMM
    Computerized control in a large electric-arcfurnace shop

    By B. Strohmeier

    An account is given of the use of a computer to control the performance of three ultra-high-powered electric-arc furnaces in Iscor 5 steelmaking plant at Vanderbijlpark, South Africa. Several of the r

    Jan 1, 1985

  • CIM
    Computerized cost estimating for underground mines

    By J. B. Scott

    "A computerized cost estimating program developed with the use of the Lotus 1-2-3 spreadsheet program has produced dramatic savings in preparing estimates for operating costs, equipment fleet size and

    Jan 1, 1988

  • SME
    Computerized Critical Path Scheduling Of Longwall Moves

    By Dale K. Nash

    The authors have developed a com¬puter-assisted critical path planning and scheduling model to help reduce time required to move longwall mining units. The model includes time constraints and limited

    Jan 1, 1983

  • SME
    Computerized Data As An Aid To Kaolin Exploration

    By Harland E. Cofer

    A computer-assisted resources and sedimentological study of the Andersonville, Georgia kaolin-bauxite district was begun in 1975 under a grant from the Office of Mineral Resources of the U.S. Geologic

    Jan 1, 1977

  • SME
    Computerized Design And/Or Control Of Separational Flowsheets

    By Oleg N. Tikhonov

    The paper deals with computerized analytical design of separational mineral processing flowsheets for flotation, gravity separation, magnetic separation, etc. (without comminution). Initial data inclu

    Jan 1, 1989

  • SME
    Computerized Design Of Comminution Circuits

    By J. A. Herbst

    A state of the art computer simulation package, named UTAH-MODSIM is being developed. This package can run on a mainframe (eg. UNIVAC) as well as on a microcomputer (eg. IBM/PC with at least 512 kByte

    Jan 1, 1986

  • AIME
    Computerized Determination Of Mine Planning Data From Boreholes

    By Christopher Haycocks, J. Richard Lucas

    The growth of computer and ground control technology in recent years, combined with an urgent demand for low-cost fossil fuels and mineral resources, has set the stage for full-scale utilization of co

    Jan 4, 1973

  • SME
    Computerized Determination Of Mine Planning Data From Borholes

    By Christopher Haycocks

    The growth of computer and ground control technology in recent years, combined with an urgent demand for low-cost fossil fuels and mineral resources, has set the stage for full-scale utilization of co

    Jan 1, 1973

  • SME
    Computerized Drilling - The Latest Development In Drilling Technology

    By Pasi Latva-Pukkila

    Underground rock drilling has gone through intense development during the last 25 years. Mechanization and hydraulics have greatly increased the efficiency of drilling and improved the environment of

    Jan 1, 1989

  • SME
    Computerized Estimation Of Ore And Waste Zones In Complex Mineral Deposits

    By Jean-Michel Rendu

    In most mining operations, some degree of selectivity is applied. Whether one deals with surface or underground operation, ore zones, and waste zones are defined not only on the basis of the value of

    Jan 1, 1982

  • AIME
    Computerized Field Instrumentation System Developed For Stress Control Method Of Underground Mining

    By Shosei Serata, Bruce Gardner

    A system of three new field instruments has been developed to measure, in situ, the three basic classes of geomechanical parameters: material properties, stress state, and creep deformation. The signi

    Jan 1, 1984

  • SME
    Computerized Fire Monitoring, Criteria, Techniques, And Experience At Inco Limited

    By J. S. Stachulak

    Installation of a computerized mine monitoring and control system in two planned construction phases began in 1983. Phase one consisted of providing a central monitoring station located on surface for

    Jan 1, 1989

  • TMS
    Computerized Fluid Dynamic (CFD) Modeling, An Important New Engineering Tool For Design Of Smelting Furnaces

    By Jonathan M. Berkoe

    Design engineers and metallurgists have long recognized the need for better methods to calculate a wide range of fluid dynamic effects in smelters and hydro- metallurgical facilities. Examples can ran

    Jan 1, 1999

  • SME
    Computerized Maintenance Management Information Systems – A Valuable Tool

    By Walter J. Pachucki

    Mining equipment maintenance costs account for a major portion of a mine’s total operating expense. A reduction of maintenance costs while providing required equipment availability translates directly

    Jan 1, 1991

  • SME
    Computerized Maintenance System At The Carol Project

    By C. Jardine

    The concept of the system is to minimize costly unscheduled breakdowns of equipment by replacing components earlier than their "life" expectancy. Periodic unit services are scheduled according to pre

    Jan 1, 1979

  • AIME
    Computerized Maintenance System at the Carol Project (MINING ENGINEERING)

    By C. Jardine, D. Freudenreich

    The system concept is to minimize costly unscheduled equipment breakdowns by replacing components earlier than their life expectancy. Periodic unit services are scheduled according to preset const

    Jan 1, 1982

  • CIM
    Computerized maintenance: making it work for you

    By Rae Simpson

    "This paper provides insight into the elements of computerized maintenance systems and identifies some of the factors which influence their effectiveness. The paper describes what to expect in terms o

    Jan 1, 1988