Search Documents

Sort by

  • TMS
    Comparative Analysis of Hydrogravimetric Separation of Friable Iron Minerals of District Piar, Between Spirals HC 1870 and HG8/7

    By Mokka N. Rao

    In this experimental investigation, the principal operating parameters of the spirals HC 1870 and HG 8/7 are determined for the hydrogravimetric separation of the friable siliceous iron minerals of th

    Jan 1, 1999

  • SME-ICGCM
    Comparative Analysis Of Longwall Gateroad Designs In Four Deep, Bump-Prone Western U.S. Coal Mines

    By Matthew J. DeMarco

    Research personnel at the U.S. Bureau of Mines have conducted longwall gate stability studies at four western U.S. mines attempting to employ yield pillars for improved ground conditions. Located in t

    Jan 1, 1993

  • SME
    Comparative Analysis Of Moisture Sensitivity Index Tests For Coal Mine Roof - Preprint 09-068

    By T. Klemetti

    Moisture deterioration of clay-rich roof rocks causes high numbers of roof falls in coal mines in humid summer months. Rocks with high moisture content are generally weaker and can further deteriorat

    Jan 1, 2009

  • SME
    Comparative Analysis Of Neural-Network And Traditional Meta-Modelings For Placer Gold Oregrade Spatial Variability Estimation

    By J. Ke

    Traditional geostatistical methods have been used in ore reserve estimation for decades. Neural Networks (NNs) have provided an alternative approach to data analysis and ore reserve estimation. Unlike

    Jan 1, 2003

  • SME
    Comparative Analysis of Open Pit Gold Mine Project NPV’s Under Price Uncertainty Using Real Options and Dynamic Mine Plans

    By M. Visnjic

    Open Pit Mine Production scheduling under commodity price uncertainty suffers from an exponentially increasing problem size as simulations and real options flexibility are used to generate and evaluat

    Jan 1, 2019

  • IIMP
    Comparative analysis of open pit mine scheduling techniques for strategic mine planning of the tintaya copper mine in Peru

    By Dario Bernabe

    This paper evaluates four open pit mine scheduling programs recently developed and compares them in order to determine if significant differences exist among them. The same input data, which consist o

    Aug 25, 2002

  • SME
    Comparative Analysis Of Open Pit Mine Scheduling Techniques For Strategic Mine Planning Of The Tintaya Copper Mine In Peru

    By D. Bernabe

    The mine scheduling process defines a mining sequence across the life of the mine and stipulates the amount of ore, waste, and specific blocks to be mined each year so that the highest economic return

    Jan 1, 2002

  • IMPC
    Comparative Analysis of Performance of Water Only Cyclones and Hydrocyclone for Iron Ore Processing at Joda Iron Ore Processing Plant, Tata Steel

    By D. Chakraborty, Neeraj Kumar

    "The study provides the comparative analysis of the performance of water only cyclones and hydrocyclone for iron ore fines processing at Joda Iron ore processing plant, Tata Steel. Joda iron ore depos

    Jan 1, 2018

  • AIME
    Comparative Analysis of the Central Florida Phosphate District to Its Southern Extension

    By John P. Bernardi, Ralph B. Hall

    Past and present phosphate production in the central Florida phosphate district has been predominantly from the unique Bone Valley formation. As these lucrative reserves are depleted, production will

    Jan 1, 1981

  • SME
    Comparative Analysis of the Effect of Microwave Pre-treatment on the Milling and Liberation Characteristics of Mineral Matters of Different Morphologies

    By R. Venugopal, V. K. Saxena, S. K. Tripathy

    "This study was carried out to understand the impact of variation in material morphology on the efficacy of microwave pretreatment. Three different types of mineral matter – coal, iron ore and mangane

    Jan 1, 2017

  • SME
    Comparative Analysis of the Effect of Mining Parameters on Open-Pit Optimisation

    By Joseph Githiria, Khadija Omar Said

    Mineable material is defined using cut-off grade either as geological or economic cut-off grade. Both geological and economic cut-off grade affects the output generated in an open-pit mining operation

    Jun 25, 2023

  • IOM3
    Comparative analysis of toppling behaviour at Chuquicamata open-pit mine, Chile

    By P. Varona, L. Lorig, M. Board, E. Chacon

    Geomechanical factors at the mine are important and will become even more relevant as the pit expands and deepens. To address these demands a team was assembled to collect geomechanical information an

    Apr 1, 1996

  • ABM
    Comparative Analysis Of Two Different Niti Wires’ Properties And Fatigue Life

    By Leandro de Arruda Santos, Lorena Isabela de Oliveira Ribeiro, Jéssica Dornelas Silva, Pedro Damas Resende, João Victor Lucas Amim, Suzanny Cristina Soares Martins, Vicente Tadeu Lopes Buono

    O objetivo do presente estudo foi avaliar a resistência à fadiga de duas ligas de NiTi diferentes sob condições de teste controladas por deformação a 25°C por meio de testes de fadiga por flexão rotat

    Oct 25, 2019

  • ISEE
    Comparative Blasting Using Non-Electric Pyrotechnic Delays and the Electrodet Electronic Delay System at a Limestone Quarry in New York State, USA

    By Carl Lubbe, Ron Frye, Wayne Curtis, Julie Pecori, Dan Leach

    Blasting conducted in the USA using the new Electronic Initiation System developed by Altech has shown that an accurate delay system will benefit the customer. Results from test work clearly showed th

    Jan 1, 1997

  • SME
    Comparative Carbon Management Practices Of Newcrest Operating Gold Plants

    By P. Gelfi, G. Hill, A. Showell, V. Martins, R. Dunne, R. Jenkins

    Carbon attrition losses are not usually a prime consideration for CIP equipment selection and CIP plant design. However, the costs as a result of carbon attrition and associated gold lost with carbon

    Jan 1, 1995

  • SME-ICGCM
    Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone Strata

    By J. R. Koehler

    The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f

    Jan 1, 1995

  • AIME
    Comparative Cavability Studies at Three Mines

    By Louis A. Panek

    INTRODUCTION AND SUMMARY With respect to the geomechanics aspects, the primary technical objectives in mining by an undercut-cave method are to achieve a controlled, sustained caving of the minera

    Jan 1, 1981

  • TMS
    Comparative Characteristics of Paints Developed from Fly Ash, Copper Tailing and Blue Dust

    By Payal Bakshi, Sangeeta Tiwari, Mohini Saxena, Anusha Sharma

    "Recycling and reuse is perhaps the most favorable and beneficial way to solve the problem of industrial waste disposal. However, the use of industrial wastes like fly ash, tailings etc is in practice

    Jan 1, 2008

  • AUSIMM
    Comparative Cost Analyses of Technologies for Treating Sulfate- and Metal-Contaminated Groundwater

    By T Martin, M Martin

    Mining of sulfide-based ore deposits typically creates a potential for release sulfate and acid to groundwater, and many operating mines are thus predicted to require long-term post-closure treatment

    Jan 1, 2003

  • AUSIMM
    Comparative Cost of Rock Drilling Underground

    DURING a period extending over about the last two and a half years, the performances of various types of rock drills in use at the mining department of the Zinc Corporation have been recorded as close

    Jan 1, 1923