Commissioning of Production Blasting with the EXEX 1000 Electronic Delay Detonator SytemBy Jones M
The concept of precise, accurate timing with Electronic Delay Detonators (EDDs) was first seriously addressed in the mid-1980s and much was made of the cheapness and profusion of digital watches in
Jan 1, 1995
-
Commissioning Of The Ausmelt Lead Smelter At Hindustan ZincBy Ross McClelland
This paper provides a technical overview on the installation and commissioning of the Ausmelt lead smelting, slag reduction and slag cleaning operations at the HZL Chanderiya site in India. It also d
Jan 1, 2006
-
Commissioning of the Barrytown Ilmenite Pilot PlantBy T Wootton
The Barrytown ilmenite pilot plant was commissioned in two stages using Westport Titanium Project heavy mineral concentrate. The wet concentrator was commissioned on the 17 December 1989 and produced
Jan 1, 1990
-
Commissioning of the Bindura Pressure Leach PlantBy Channon W, Dube M, Makwana M, Kerfoot D. G
In early-1995, the Bindura Nickel Corporation commissioned a pressure leach plant at its Smelter and Refinery complex located in Bindura, Zimbabwe. The novel pressure leach process was developed by
Jan 1, 1996
-
Commissioning of the BIOX and ASTER™ Processes at the Runruno Gold ProjectBy M. Savella
The Runruno Gold Project is located on the island of Luzon, approximately 200 km north of Manilla in the Philippines. The mine is a surface mine operation and use the proven BIOX® and carbon in leach
Jan 1, 2017
-
Commissioning of the Ekati Diamond MineBy Mike Rylatt
"The BHP Diamonds Inc. and Blackwater Group (Dia Met Minerals Ltd., Charles Fipke and Stewart Blusson) joint venture began production at Canada=s first diamond mine during the last quarter of 1998.Con
Jan 1, 1999
-
Commissioning of the Intensive Cyanidation Plant to Treat Concentrate from the Selene Mine at the Ares MillBy Tad Crowie, Victor Delgado, Nick Katsikaros, Tim Hughes
"A number of silver producers have identified a need for a system to recover silver and gold from base metal flotation concentrates on site rather than sending the concentrate to third party smelters
Jan 1, 2010
-
Commissioning of the Kanmantoo Copper ConcentratorBy J Seppelt
The Kanmantoo Copper Project is owned and operated by Hillgrove Resources Limited and is situated in the Adelaide Hills region in South Australia. Mining in the area has taken place off and on over th
Oct 29, 2012
-
Commissioning of the Olympic Dam SmelterThe production of copper by the Outokumpu direct blister process commenced in July 1988. The problems and incidents encountered in commissioning the main smelter equipment are outlined. Early diffi
Jan 1, 1989
-
Commissioning of Two 750 kW Centrifugal Fans at PT Freeport IndonesiaÆs Deep Ore Zone MineBy K Karmawan, T Casten
The PT Freeport Indonesiaæs Deep Ore Zone (DOZ) copper deposit is located in the province of Irian-Jaya, Indonesia. Currently, a block cave mine is being developed around this deposit. Production is s
Jan 1, 2000
-
Commissioning the Cannington Project ù Creating SuccessBy C Torrisi, J Andreatidis, M Duffy
BHPÆs Cannington process plant was commissioned in October 1997. The Cannington ore contains high grades of silver, lead and zinc but also contains high levels of fluorine which must be removed to pro
Jan 1, 2000
-
Commissioning the Electrolytic Zinc Plant at Port PirieProblems encountered in the design, construction, acceptance, commissioning and early operation of the electrolytic zinc plant at Port Pirie are reviewed. Recommendations based on the author's e
Jan 1, 1971
-
Commissioning the Liddell Colliery LongwallThe Liddell longwall equipment consists of 118 four leg supports, a shearer and armoured face conveyor of 170mm length. The equipment was supplied to Coal & Allied Operations Pty Limited (Coal an
Jan 1, 1986
-
Commissioning The Port Kembla Copper SmelterThe Port Kembla Copper (PKC) copper smelting facilities were commissioned during 2000. Numerous difficulties were encountered during the commissioning such as multiple reactor tuyere line failures, ab
Jan 1, 2002
-
Commissioning the Preparation Plant at the Newlands Coal MineThe process and control technologies incorporated into the coal preparation plant at Newlands were to be used for the first time in Australia. The commissioning organisation and procedures were se
Jan 1, 1986
-
Commissioning Under a Microscope ù The Cawse Nickel Start-UpBy R Young, D OÆSullivan
When Centaur Mining and Exploration produced nickel metal fromlaterite ore at its Cawse nickel project in January 1999, a new era in the nickel industry was heralded in. One of three new laterite proj
Jan 1, 2001
-
Commissioning ù The Interface Between Construction and OperationsThis paper outlines the role of commissioning in the project cycle, shows how to get organised for commissioning and describes the principal commissioning activities. Emphasis is placed on appointing
Jan 1, 2005
-
Commitment, Compliance And Capacity - How Environmental, Safety, Security And Social Financial Issues Affect Lenders? Risk (Project Evaluation Conference Melbourne, Vic, 19 - 20 June 2007)By G. A. Brown
Major mining projects are developed with the assistance of lending institutions who provide hundreds of millions of dollars in funding over several years, and of course expect those funds to be return
Jan 1, 2007
-
Commitment, Compliance and Capacity - How Environmental, Safety, Security and Social Financial Issues Affect LendersÆ RiskBy G S. C Murray
Major mining projects are developed with the assistance of lending institutions who provide hundreds of millions of dollars in funding over several years, and of course expect those funds to be return
Jan 1, 2007
-
Committee Bay Project ? Gold and Diamonds in NunavutBy Dean McDonald
The Committee Bay Greenstone Belt extends over 300km and is one of the largest unexplored greenstone belts in North America with excellent gold and diamond potential. Committee Bay Resources Limited h
May 1, 2004