Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • TMS
    The Disposal of Arsenic from Metallurgical Processes: Its Status Regarding Ferric Arsenate

    By G. B. Harris

    Much has been written over the past decade concerning the disposal of arsenic from metallurgical processes. In Canada, there are proposed regulations which would classify arsenic in the Primary Group

    Jan 1, 1993

  • TMS
    ASARCO 1982-92: A Decade of Metallurgical Change

    By M. G. King

    In 1982, Asarco operated six smelters and refineries producing primary copper, lead, zinc, silver and gold. At that time Asarco was still reliant on its custom smelting and refining roots and mined on

    Jan 1, 1993

  • TMS
    Productivity Programs at the Huelva Smelter

    By D. de la Villa

    From 1989 to 1992 Rio Tinto Minera has developed and implemented a productivity program in its Huelva Plant, including Smelter, Acid Plant and Electrorefinery. This Plan was designed in order to incr

    Jan 1, 1993

  • TMS
    Recovery of Copper from a-Etchant Solution

    By C. W. Won

    a-etchant solution is the waste material obtained during the etching by ammoniacal solution of printed circuits for PCs. This material contains a substantial amount of copper (13-14%) but is usually d

    Jan 1, 1993

  • TMS
    Numerical Simulation of Transient Fluid Flow and Solidification. Phenomena During Continuous Casting of Aluminum

    By B. Q. Li

    A numerical study of the developing fluid flow and thermal aspects during the staning phase of aluminum continuous casting processes is presented. The deforming finite element method, coupled with a q

    Jan 1, 1993

  • TMS
    Deoxidation of Molten Metals Using Oxygen Ion Conducting Yttria-Stabilized Zirconia Electrolyte

    By S. Yuan

    Oxygen ion conducting yttria-stabilized zirconia (YSZ) tube was used to remove oxygen from molten Cu at 1373K. Outer surface of the tube was in contact with the melt and the inner surface containing a

    Jan 1, 1993

  • TMS
    Thermodynamic Considerations for the Extraction of Nickel and Cobalt Metals from Sulfide and Oxide Minerals by Reduction Technique

    By Animesh Jha

    Univariant diagrams are constructed for the reduction of nickel and cobalt oxide and sulphide minerals. The results from the carbothermic and hydrogen reduction of sulphide minerals are compared. The

    Jan 1, 1993

  • TMS
    Exothermic Mass Transfer in Metallic Systems

    By Stavros A. Argyropoulos

    Exothermic mass transfer takes place in various areas involving metallic systems, ranging from liquid metal processing operations to the growth of thin films in microelectronics. The formation of inte

    Jan 1, 1993

  • TMS
    Flash Smelting at Magma Metals Company San Manuel Smelter

    By Tom W. Gonzales

    Magma Metals Company commissioned a 3000 tpd Outokumpu flash smelting furnace in July 1988. Through September 1992 the PSP has smelted a first campaign record 4.1 million tons of concentrate. This pap

    Jan 1, 1993

  • TMS
    Productivity, Quality and Smelter Operations: Rönnsktär 1992

    By Andres Vikdahl

    The Rönnsktär smelter has recently undergone a series of technical and operational changes. This changes are caused by our own will to remain and gain in competivety and to adapt to the ever changing

    Jan 1, 1993

  • TMS
    Mathematical Modelling of A Gas-Stirred Ladle Using Bubble Tracking Techniques

    By Y. Y. Sheng

    Plume flows created by gas injection into liquid metals have been studied extensively, however the dynamics of bubbles within the plume have not received adequate attention, particularly for large, ir

    Jan 1, 1993

  • TMS
    Heavy Metals Removal From Small-Arms Firing Ranges

    By Jerold L. Johnson

    Remediation of small-arms firing ranges is being investigated by the Naval Civil Engineering Laboratory and the U.S. Bureau of Mines. Scheduled closures of military installations, as well as the manag

    Jan 1, 1993

  • TMS
    The Escondida Process for Copper Concentrates

    By Willem P. C. Duyvesteyn

    A novel hydrometallurgical process for Escondida copper concentrates has been developed by The Minerals Laboratory of BHP. The Escondida Process consists of concentrate leaching, solution purification

    Jan 1, 1993

  • TMS
    Flow Visualization in the Water Model of a Molten Aluminum Tundish

    By F. Shen

    Qualitative and quantitative results obtained during the physical modeling of the molten aluminum flow in a tundish using an aqueous system are presented. Surface tuft, free-surface powder and laser s

    Jan 1, 1993

  • TMS
    Study of Heterogeneous Equilibria Corresponding to llmenite Chlorination by Carbon Tetrachloride

    By Mariana H. Staia

    Thermodynamic calculations based on the free energy minimization method were performed for the system Ti-Fe-Mn-0-C1-C in order to evaluate the chemistry associated with the chlorination of an ilmeniti

    Jan 1, 1993

  • TMS
    Raman Spectroscopy of Natural and Oxidized Metal Sulfides

    By Jun Li

    Several metal sulfides were examined in-situ by Raman spectroscopy before and after anodic oxidation. Results obtained for chalcocite, chalcopyrite, covellite, galena, pyrrhotite and pyrite electrodes

    Jan 1, 1993

  • TMS
    The Recycling of Non-Ferrous Metals

    By John C. Taylor

    With growing emphasis on energy conservation and increased concern over the presence of heavy metals in the environment, it is fortunate that most metals are readily recycled. In this respect, metals

    Jan 1, 1993

  • TMS
    Thermodynamic Studies of Oxygen-Solute Interactions in Liquid Copper Alloys

    By Seshadri Seetharuman

    The present paper summarises a series of measurements of the interaction parameter of oxygen in liquid copper with respect to a third element, e(M)o, where M is Mn, Zn, As, Se or Te which are common i

    Jan 1, 1993

  • TMS
    Reparation of a Master Alloy from a Southern Oregon Laterite

    By Ralph H. Nafziger

    The feasibility of smelting a Ni-Co-Cr-bearing laterite ore from southern Oregon was evaluated by the Bureau of Mines. The objective was to prepare a master alloy for subsequent stainless steel produc

    Jan 1, 1993

  • TMS
    Flash Oxidation and Flash Reduction: A Comparison

    By Nickolas J. Themelis

    The flash oxidation and smelting of mineral sulfides is a very prominent metallurgical achievement of the second part of this century. Its initial industrial implementation owes much to the work of Pe

    Jan 1, 1993