Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Investigation Of A Large-Scale Coal Pillar Failure (1d227dbd-e114-416e-a218-a26bd608b157)
By N. S. Tanious
This paper summarizes the results of an investigation into possibly the largest coal pillar failure in the USA. The newly opened drift mine is located in Southeastern Kentucky and worked an 11 feet th
Jan 1, 1989
-
Eurotunnel - UK Side Plant
By C. J. Kirkland
The paper describes the arrangements for the casting, curing and handling at the casting yard, of the concrete segments for the lining of the UK half of the tunnel, and the plant used for the handling
Jan 1, 1989
-
The Impact Of Assay Based Control And Target Oriented Process Control On Concentrator Economics
By D. R. Barker
The economic performance and competitiveness of a concentrator are dependent on the production of accurate real-time assay information and the manner in which it is utilized. Our paper describes the
Jan 1, 1989
-
Bond Gold Colosseum Inc. Crushing And Grinding: An Update
By R. L. Beatty
The Bond International Gold (BIG) Colosseum Gold Mine was discovered in 1865, but no recorded production occurred until the 1930's, with production approximately 19k9 (615 oz) of gold. The mine w
Jan 1, 1989
-
An Introductory Review - Investment and Project Evaluation
By R. V. Ramani
It is common knowledge that there is an endless stream of possibilities, proposals, and projects - each representing a demand on available capital - for improving the mining company's performance
Jan 1, 1989
-
Mine And Surface Facility Closure
By D. H. Warren
This presentation we hope will provide you with an orderly approach co mine and surface plant closure taken from our experience over the past several years on six different projects within the intermo
Jan 1, 1989
-
Discussion – In situ leaching of disseminated gold deposits—geological factors by J. G. Wargo Technical Papers, MINING ENGINEERING, Vol. 40, No. 10 October 1988, pp. 973-975
By J. D. Megeath
In the October 1988 issue of MINING ENGINEERING, J.G. Wargo's paper discusses the problem of measuring and analyzing permeability, porosity, and fracturing in its relation to in situ leaching of
Jan 1, 1989
-
A Data Base For Failure And Non-Performance Analysis Of Mining And Construction Equipment
By Lawrence Adler
[An innovative framework is proposed which most efficiently and systematically handles the large quantity of information needed for equipment failure and other non-performance analyses. It is based on
Jan 1, 1989
-
A Solution To The Problem Of Scheduling And Replacement In Open-Pit Mines
By Qing Wang
A longterm overburden removal plan can be realistic and optimum only when the cost and capacity profiles off the equipment assigned to the operation are taken into consideration. Therefore, the planni
Jan 1, 1989
-
Support Characteristics Of In-Cycle Roof Trusses (A Photoelastic Analysis) (833371b9-62db-43ad-a16e-cb19cfdf5c2a)
By Jr. Gambrell
Support characteristics of in-cycle trusses are analyzed using a photo-elastic model loaded by tightening a truss in the sequence normally used in an underground mine. Stresses in the roof at its cent
Jan 1, 1989
-
Optimum Use Of Diamond Wire Equipment In Stone Quarrying
Diamond wire rock cutting is the most widely used technology in carbonate stone quarrying owing to technical performance and block face quality. Interest is also growing for siliceous deposits. This p
Jan 1, 1989
-
Column Flotation Of Western Phosphate Ores
By Samuel Polinsky, Lawrence W. Bierman, Wayne Perkins
[A column float beneficiation plant using 9, 8.5 foot diameter, cells was constructed by the Simplot Company and the Smoky Canyon Facility in the fall of 1986 and has been in operation since May of 19
Jan 1, 1989
-
Heat and Moisture Transfer within Advancing Longwall Coalface Goafs and the Effect on Face Climatic Conditions
By I. Longson
As a longwall coalface advances a caved goaf or waste region is left behind. Air flow takes place through this permeable goaf due to the pressure differentials existing across it and en route this lea
Jan 1, 1989
-
Operation Range And Efficiency Of Dewatering Apparatus
By H. H. Kleizen
The operation range and efficiency of dewatering apparatus are important factors in the selection of an apparatus for a given purpose. In this paper theories are presented allowing to predict these ba
Jan 1, 1989
-
Minimum Sample Size Analysis For Groundwater Quality At Coal Mines
By John Nadolski
Intensive hydrologic monitoring of the Powder river basin has been on-going since the early 1970's. Data were used in environ- mental assessments and for determination of hydrologic consequences
Jan 1, 1989
-
Past and present elements of reclamation bonding discussed
By Ava Walker
The first form of a surety bond was an honest handshake between two or more parties agreeing to a decision, and their personal guarantee of following through to completion. This has all changed. In
Jan 1, 1989
-
Assessment Of Emergency Ventilation Capability In Case Of Train Fire In A Tunnel Using "Subway Environment Simulation" (SES) Computer Program
By Paul C. Miclea, Robert E. Murphy
The behavior of fire and airflows in a confined tunnel differ significantly from more familiar fire situations outside, due to the buoyant effect which tends to create a layer of hot smoke and gases f
Jan 1, 1989
-
Computer Controlled Jumbos. State Of The Art.
By Thorvald Wetlesen
Computer controlled drilling is now proven technology. It was first introduced by the development of the Furuholmen system for a prototype three boom tunneling jumbo in Norway in 1978. Now, 13 rigs wi
Jan 1, 1989
-
Behavior Of Redox Electrodes During Flotation And Relationship To Mineral Floatabilities
By G. Labonte
The behavior of four different redox sensing electrodes (gold spiral, black platinum, chalcopyrite, and galena) during roughing and cleaning flotation is examined and related to the flotation response
Jan 1, 1989
-
University Of Kentucky Mine Ventilation Manager
By Andrzej Wala, Tom Altman, Tom Hughes
The University of Kentucky Mine Ventilation Manager (UKMVM) is a system that contains Level Five knowledge bases and comprises an expert mine ventilation management system. The package uses production
Jan 1, 1989