Avoiding Disputes on Challenging Ground Conditions in the Lake Mead Intake No. 3 TBM Starter Tunnel
By Erika Moonin, Jim Nickerson, Marcus Jensen
"This paper will explain how the Contractor and Owner avoided a contractual dispute involving characterization, impacts, and final remedy for challenging ground conditions encountered during drill and
Jan 1, 2016
-
Evaluation of Beneficiation Options for Recovery of Ultrafine Thermal Coal
By A. Suarez, M. Menendez, M. R. Gent, P. Riesgo
"Recent requirements to reduce thermal coal plant emissions, and ultrafine coal's tendency to produce these emissions due to its typically high ash and moisture contents have limited the use of ultraf
Jan 1, 2016
-
Value Driven Cost Management: A Key to Continuos Improvement of Mining
By M. A. Vergara, J. A. Botín
"The decline of the “super cycle” has placed an end to a decade of production-focused strategies, with operating cost growing at rates higher than production. Today, the sector is placed on a tough ri
Jan 1, 2016
-
The Crossrail Experience
By Bill Tucker, Mike Black
"PROJECT OVERVIEW Crossrail, Europe’s largest construction project, will increase London’s transportation capacity by 10% when it opens in 2018. The Crossrail scheme is a combination of surface and un
Jan 1, 2016
-
Using Mine Site Gas Chromatography for Accurate and Reliable Gas Analysis
By R. L. Taylor, S. D. Abbott
"INTRODUCTION Mines are filled with a mixture of gases, some of which are toxic, flammable, explosive. Others can be early reporters of potential problems. It has previously been shown that analysis b
Jan 1, 2016
-
Copper Leaching: 2014-2015 Global Operating Data
By R. Scheffel, R. Washnock, G. Zarate
"The second survey of global copper leaching operations has been completed, the data published in 1998 has been updated. A survey questionnaire was sent to 40 identified copper leach operations around
Jan 1, 2016
-
TBM Risk Management System considering Predicted Ground Condition Ahead of Tunnel Face: Methodology Development and Application
By Hee-Young Chung, In-Mo Lee, Jeongjun Park, Hangseok Choi, Seok-Won Lee
"When using a Tunnel Boring Machine (TBM) during tunneling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These reduce the stability of tunnels, and
Jan 1, 2016
-
Case Study – PVC Ventilation Duct Ventilating Underground Mining Operation
By T. Weatherwax, A. Rai, J. Poor
"This paper provides an overview of the current use of auxiliary ventilation products and the challenges with limited air quantity in dead-end entry or working faces. The PVC’s low frictional factor,
Jan 1, 2016
-
Using Laboratory Testing for Designing an Optimum Field Grout for the Millwoods Double Barrel Replacement Project
By Anna Kate Miller, James J. Brady, Hamza Jaffal, Ritika Sangroya, Chadi El Mohtar, Wing Shun Kwan
"The design of an appropriate pre-grouting program can be the difference between a successful tunnel construction and an expensive on-the-go repair. However, current grout design relies heavily on rul
Jan 1, 2016
-
Cryogenic Refuge Alternative Supply System (Cryorass) Tested in a Built-In-Place RA
By D. F. Doerr, E. Blalock, D. R. Bush, K. D. Cohen
"BACKGROUND The design, development, fabrication, and test of a cryogenic supply for a refuge alternative is part of a larger effort funded by the National Institute for Occupational Safety and Health
Jan 1, 2016
-
Minne Lusa Stormwater Conveyance Sewer Project – Omaha, NE
By Todd Wanless, Daryl Poduska, Prakash Donde, Mahmood Khwaja
"The proposed Minne Lusa Stormwater Conveyance Sewer is part of the Phase 3 Major Combined Sewer Overflow projects to be scheduled as part of the City of Omaha’s Long Term Control Plan (LTCP). The sys
Jan 1, 2016
-
The Effect of Excavation Progress on the Behavior of Hakim Highway Tunnel Using Geotechnical Instrumentation
By Majid Sadeghi, Ali Naghi Dehghan, Kaveh Ahangari, Seyed Mahdi Pourhashemi
"Instrumentation and monitoring of ground deformations in tunneling is a principal means for selecting and controlling the excavation and support methods among those foreseen in the design, for ensuri
Jan 1, 2016
-
Encapsulated Oil Additive Application in Earth Pressure Balanced (EPB) Tunneling – A Case Study
By Bryce Sullivan, Cliff Baratta, Ehsan Alavi, Timothy Dobbs, Lisa Mori
"Soil conditioning is one of the main factors in successful application of EPB machines in tunneling projects, which involves changing the characteristics of the ground in order to make it suitable fo
Jan 1, 2016
-
Challenges in Adapting Tunnel Construction Contracts to Actual Ground Conditions
By Lena Paar
"Underground construction poses certain challenges for all parties involved because the actual ground conditions are often unpredictable. Highly complex projects like tunnel construction are affected
Jan 1, 2016
-
The Dynamic Response of the Taru-Toge Tunnel during Blasting
By M. Soya, M. Imazu, Ö. Aydan
"SUMMARY Taru-Toge tunnel is being constructed using drilling-blasting technique as a part of expressway project connecting Shin-Tomei Expressway and Chuo Expressway at the boundary of Shizuoka and Ya
Jan 1, 2016
-
Micro-Pricing: The Value of Trace Rare Earth Elements in Coal and Coal Byproducts
By A. Noble
"A supply of sustainably sourced rare earth elements (REEs) is critical for several high-tech industries, renewable energy technologies, and defense applications. Recent studies have shown that REEs e
Jan 1, 2016
-
Tunneling Under the Norris Cut Channel - World Firsts to Overcome the Adverse Ground of Miami
By Boris CARO VARGAS, Bernard Theron
"In early 2014, Nicholson Construction Company was awarded, together with its tunneling sister company Bessac, the Norris Cut Miami Tunnel Project. The 2.5-meters diameter segmental lined tunnel, 1600
Jan 1, 2016
-
The Caltanissetta Twin Tunnel: Segmental Lining Design and EPBS TBM Performance during the Construction of the 4km-Long ø15.08m Tunnel
By Ivano Andreis, Georgios Kalamaras, Mario Liti, Sebastiano Pelizza, Filippo Avesani
"THE SS640 AGRIGENTO-CALTANISSETTA PROJECT The Caltanissetta tunnel is part of the works for the construction of the second 28km-long maxi section of the SS 640 motorway of Porto Empedocle, from km 44
Jan 1, 2016
-
Planning the Underground - How Underground Solutions Can Inform Contemporary City Urban Design
By Stefano Ceccotto, Eugenio Trussoni
"INTRODUCTION Contemporary city is made of layers. Physical structures layers (built fabric, residential, commercial industrial etc. ), infrastructural layers (below and above ground), “green” layers
Jan 1, 2016
-
Design and Construction Aspects of CSO Tunnel and Pump Station Systems
By Verya Nasri, James Sullivan, Alex Varas
"INTRODUCTION Many major cities in the United States have a combined storm water and sanitary sewer network. Regular rainfall overwhelms the system capacity and results in millions of cubic meters of
Jan 1, 2016