Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Is International Experience of Risk-Based Decision Making for Road Tunnel Safety Applicable in the Unique US-American Regulatory Environment? - NAT2024
By Arnold Dix, Oliver Heger, Bernhard Kohl
In the USA, risk-based decision making has not been a common approach to tunnel safety in the past, but this is changing, as concepts such as “equivalency” in the NFPA 502 framework gain acceptance in
Jun 23, 2024
-
Integration of Century Old Mont Royal Tunnel into Montreal New Light Rail Transit Network - NAT2024
By Verya Nasri, Behrouz Esmaeilkhanian, Mohammad Motallebi
Réseau Express Métropolitain (REM) is the new Light Rail Transit (LRT) network of Montreal, Canada. This new LRT network uses a century-old Mont Royal Tunnel (MRT) to connect Downtown Montreal to the
Jun 23, 2024
-
Microtunnel Shaft Construction in Louisiana - NAT2024
By James Carroll, Lance Heyer
This paper describes the shaft design and construction for a 72-inch microtunnel under 14 active railroad tracks in Avondale, Louisiana. Initial shaft design for a deeper tunnel alignment considered s
Jun 23, 2024
-
Multimodal Machine Learning Technologies in Tunnel Geotechnical Applications - NAT2024
By Gunjan R. Bhattarai, K. Bhattarai
Applications of machine learning and robotics in the tunneling industry are still nascent. Research and development are ongoing in TBM guidance; prediction of TBM cutter wear and tunneling induced gro
Jun 23, 2024
-
The Upper Hidden Basin Diversion Project Design and Construction at Terror Lake—Kodiak, Alaska - NAT2024
By Jennifer King, Julius Strid, Steve Brandon
The Upper Hidden Basin Diversion (UHBD) tunnel was driven approximately 1.2 miles by the drill-and-blast method primarily through massive granite bedrock geology for the Kodiak Electric Association, I
Jun 23, 2024
-
TBM Excavation Through Pre-Existing Tie-Backs—Ship Canal Water Quality Project (SCWQP) - NAT2024
By Francesco Chiappalone, Franco Gasperin, Fabrizio Fara
This document describes the challenging task of mining through tiebacks using a 21'-8" diameter Tunnel Boring Machine (TBM) as part of the Ship Canal Water Quality Project. The mining operation involv
Jun 23, 2024
-
The Anomalies of the Purple Line Extension, Section 1, Los Angeles - NAT2024
By James Corcoran, Richard McLane, Joseph DeMello, Eric Carlson, Hans van de Vrugt
The Los Angeles County Transportation Authority’s Purple Line Extension Phase 1 is a $3.12 billion (USD) design-build, underground heavy rail project, connecting an existing station at Wilshire Boulev
Jun 23, 2024
-
Risk Assessment and Large Diameter Segmental Lining Design in Swelling Ground - NAT2024
By Carlos Álvarez, Sergio Sánchez, Michael Mains, Giuseppe Gaspari
Extensive record of tunnels excavated with SEM (sequential excavation method) in swelling grounds exists in literature: global experiences include successful tunnelling both through clayey and rock ma
Jun 23, 2024
-
Tunneling Through Reef Structures: Identification, Characterization, and Potential Impacts - NAT2024
By Jon Ike Isaacson, Michael Miller, Jarek Trela
Despite reef structures being relatively common in carbonate rocks around the world, tunneling experience in reefs is extremely rare. Impacts and risks associated with reef tunneling through these geo
Jun 23, 2024
-
Innovations in the Production of Tunnel Lining Segments - NAT2024
By Stefan Medel
As a pioneer Herrenknecht started in 2018 to automate the production of tunnel lining segments. Since then, many automation processes became state of the art. Robots cleaning and oiling the moulds, hy
Jun 23, 2024
-
A 108-in Storm Tunnel Underneath Active Taxiways and Apron at O’Hare International Airport - NAT2024
By Tim M. Benson, Adam L. Lamanna, Carolina Martinez-Gutierrez, Mark J. Stephani
The Lower Concourse C Extension (LCE) 108-in Storm Sewer consists of a 2,797-foot long, 27 to 55-foot deep, 108-in I.D. storm sewer tunnel. Situated beneath active taxiways and a terminal apron at Har
Jun 23, 2024
-
DWS Design & Construction Monitoring of a Road Tunnel Under Very Low Cover in the SNCF South-East European Technicentre in Paris - NAT2024
By Yassine Lahmadi, Edoardo Trivellato, Christian Chereau, Bénédicte Robert
Within the framework of the adaptation of the South-East European Technicentre (Technicentre Sud-Est Européen TSEE), SNCF Voyageurs appointed Pini with the project management mission (MOE) for the des
Jun 23, 2024
-
Design and Construction Challenges at the Piney Branch CSO 049 Storage Tunnel in Washington, DC - NAT2024
By Ritika Kundu, Moussa Wone, Amanda M. Morgan, Tatiana K. Proctor
The Piney Branch CSO 049 Storage Tunnel (PBST) will be the last major project for the DC Clean Rivers Program. The project includes construction of a 2,200-foot-long, 18-foot-internal-diameter storage
Jun 23, 2024
-
The Importance of Wastewater Treatment Plants for Tunneling Projects - NAT2024
By G. Vogt
Water is one of the most important ressources of our planet. Unlike many other natural resources, water cannot be substituted by anything and must therefore be handled with the utmost care. Depending
Jun 23, 2024
-
CFD Simulation of the Effect of Bifurcation on Fire Smoke Temperature and Toxic Gas Evolution in an Underground Mine Tunnel: A Case Study - NAT2024
By Oluwafemi Salami
Conducting full-scale fire experiments in underground mines is difficult and expensive. Sometimes, it is impossible to carry out fire tests in mines due to the danger they pose to mine workers and the
Jun 23, 2024
-
Grouting Aggressive Ground in Qatar - NAT2024
By Hernan Fernandez, Khalid Saif F S Al- Khayareen, Volkan Salepciler, Jacek B. Stypulkowski
Wakrah and Wukair Drainage Tunnel, WWDT is 13 km long with a 4.5 m ID sewer water tunnel about 50 to 60 m below ground surface. Integral to the project are several adits with provisions for future con
Jun 23, 2024
-
Ultra-Long Tunnel Drive with TBM for the Construction of the Mineral Transport for the Woodsmith Project Polyhalite Mine - NAT2024
By Karin Bäppler
A new polyhalite fertilizer mine is currently being developed in the UK by Anglo American Crop Nutrients. The project includes the construction of a Mineral Transport Tunnel almost 37 kms long to hous
Jun 23, 2024
-
Tbm Shield Abandonment Beneath the Fraser River for Connecting Tunnel and River Riser of the Annacis Island WWTP New Outfall System - NAT2024
By John Newby, Ulf Gwildis, Ken Massé, Guillaume Roux
How to connect an effluent conveyance tunnel to riser shaft and diffuser arms of an outfall system is dictated by the ground conditions, which ideally include rock or soil strata of low permeability.
Jun 23, 2024
-
Why an Industry Education City for the Tunnelling Sector - NAT2024
By Ross K. Digby
The Victorian Tunnelling Centre (VTC) has evolved its purpose from purely training workers, to a tunnelling industry education city. The VTC has now focused its activities on the areas of technology;
Jun 23, 2024
-
The Anacostia River Tunnel System in Washington DC: Construction and Performance of One the World’s Largest CSO Reduction Infrastructures - NAT2024
By Jeffrey Peterson, John Beesley, Martino Scialpi, John Cassidy
The DC Clean Rivers Project is DC Water's ongoing program to capture and treat combined sewer overflows (CSOs) during rainfall before they reach the District waterways. The Anacostia River system was
Jun 23, 2024