Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Open-Pit Load & Haul Simulator: Exploring the Effects of Haul Truck Electrification on Mining ProductivityBy Josiah Pohl, Christopher Utter, Kyle Everly, Akshay Chowdu
Battery Electric Vehicles offer increased energy efficiency for open-pit load & haul operations at a potentially lower overall carbon cost. Electrifying a mine’s fleet, however, presents a unique set
Jun 25, 2023
-
Incorporating Operational Modes into Open-Pit Stochastic Mine Planning: An Optimization Using VND and LPBy Alessandro Navarra, Aldo Quelopana
For decades, open-pit mine planning algorithms have incorporated geological uncertainty and other elements or characteristics for increasingly realistic representations. Among these complexities is th
Jun 25, 2023
-
Using UT3PC and LaModel to Aid the Mine Engineer in Evaluating Mine Layout DesignBy Bo Hyun Kim, Mark K. Larson
Researchers at the National Institute for Occupational Safety and Health have tested the finite element code, UT3PC, with LaModel to evaluate their results using know case studies. The purpose of the
Jul 1, 2023
-
Multivariate Stochastic Mine Scheduling Targeting Stationary GradesBy Augusto Andres Torres Toledo, João Felipe Coimbra Leite Costa, Luciano Nunes Capponi, Diego Machado Marques
Short-term mine planning to open pit requires defining diglines to orientate the excavation geometry. In deposits with multiple chemical variables, it is necessary to have more rigorous control over t
Jun 25, 2023
-
Integrating Machine Learning and Geostatistics for Grade Control ModelsBy Ademar Lopes, Victor Silva, Heitor Silva, Gustavo Usero, Roberto Rolo, Lucas Pereira, Gabriel Moreira, João Lague, Arthur Endlein, Matheus Feitosa
Grade control models are supposed to provide a higher resolution than long-term or interim models. However, available grids from diamond or reverse circulation drilling do not provide that required re
Jun 25, 2023
-
An Integrated Approach for Long-term Production Scheduling Optimization of Sublevel Caving Mines Using Mixed-Integer-Linear-Programming ModelBy Amin Mousavi, Soroush Khazaei, Yashar Pourrhimian
As a factory-like method, sublevel caving consists of development activities, stockpiling and production activities that are carried out on different levels independently. Therefore, considering the o
Jun 25, 2023
-
Control of High-Order Seismicity in Deep Western United States Mines Through Structural Mine DesignsBy Hamid Maleki
Mine seismicity is influenced by the mechanical properties of both near-seam strata and overburden/underburden and the prudent selection of mining methods and mine layout designs, utilizing sitespecif
Jul 1, 2023
-
A Binary Linear Programming Model for Optimizing Underground Sublevel Stope LayoutBy Theophilus Mensah, Kwame Awuah-Offei
Engineers face significant challenges when determining what geometry provides the most profitable and safe stope for extraction. Several techniques and optimization algorithms have been developed in r
Jun 25, 2023
-
Multidimensional Data Analysis for Drilling Process in Underground MinesBy Artur Skoczylas, Paweł Stefaniak, Sergii Anufriiev, Wioletta Koperska, Maria Stachowiak
In many underground mines the excavated ore is produced during the blasting process. Drilling machines that are used to drill the blastholes, where later the explosives will be mounted, are crucial fo
Jun 25, 2023
-
A General Short-term Planning Model of Open Pit Mines with SemiMobile In-Pit Crusher or Traditional Truck-Shovel HaulageBy Nasib Al Habib, Hooman Askari-Nasab, EUGENE BEN-AWUAH
In-pit crushing and conveying (IPCC) is getting popular in deeper open pit mines as a suitable alternative to truck haulage because it offers a lower operating cost due to shorter haulage distance and
Jun 25, 2023
-
A Study of the Leading Factors Associated with a Massive Ground Collapse in an Underground Limestone Mine in Southwestern PennsylvaniaBy Mark Van Dyke, Mark Mazzella, Gamal Rashed, Nicole Evanek, Brent Slaker
In the past decade, there have been several incidents of massive ground collapses in underground stone mines in the eastern United States. Fortunately, these events have not resulted in any fatalities
Jul 1, 2023
-
Using Precedence Constraints to Model the Geometry of Optimal Mining EnvelopesBy Jorge Amaya, Nelson Morales Varela, Francisco Saavedra, Gonzalo Nelis, René Gómez
Precedence constraints are broadly used in mathematical models and algorithms for mine planning to model, for example, slope angles in open pit operations or connectivity in underground mines. Unfortu
Jun 25, 2023
-
Using Simulation and Optimization to support the Mining Execution PlanBy Katherine Hynard, Colin Eustace
Development quarterly mine plans is generally time-consuming and requires consideration for many operational constraints and competing objectives. With lengthy turnaround times, there is often limited
Jun 25, 2023
-
A Dynamic Programming Algorithm for Selecting Evenly Spaced Pushbacks from Nested PitsBy Kadri Dağdelen, Matthew Deutsch, Thys Johnson
Nested pit analysis in open-pit long range mine planning is used to define approximate ultimate pit limits and an initial high-level schedule in the early stages of a project. Modern ultimate pit opti
Jun 25, 2023
-
Design Methodology of Pumpable J-Crib Stopping Wall and Jennmar High-Strength Stopping Panel WallBy Xiaoting Li, Richard Adasiak, Benjamin Mirabile
Pumpable J-Crib stopping walls and Jennmar high-strength (HS) stopping panel walls are widely used for resisting high-ventilation air pressures and roof support in underground mines due to their insta
Jul 1, 2023
-
Planning Open Pit Mines Using Direct Block Scheduling TechnologyBy Mauricio Brücher, Juan Camus
This article deals with open pit mine planning and a computer technology known as Direct Block Scheduling, or “DBS”. This is an emerging technology for modeling mine exploitation strategies using mixe
Jun 25, 2023
-
Surface and Highway Subsidence Characteristics Due to Longwall Mining Based on Long-Term Field MonitoringBy Jie Li, Longxiang Li, Wenbing Guo, Gaobo Zhao, Yuhang Hu
Surface subsidence caused by underground longwall mining is a very complicated process in time and space, influencing building and structures on the surface of the mining area, including houses, pipel
Jul 1, 2023
-
A Comparative Study of the Application of Machine Learning Techniques to Analysis and Prediction of the Market Prices for Precious Group MetalsBy Milka Madahana, John Ekoru
For efficient management of operations, mining companies are required to be able to predict potential scenarios for main market factors. Competitive advantage and value creation are established throug
Jun 25, 2023
-
Mining Data Collection, Storage, and Interpretation Method AdvancementsBy Jay Nopola, Christopher Johnson, Matthew Minnick, Erik Hemstad, Erik Walega
Mining data collection, storage, and interpretation methods have progressively changed over time. Data collection, for the most part, has transitioned from handwritten notes and logs based on manual g
Jun 25, 2023
-
Electric Vehicle Fleet Optimization Software (EV-FOS) for Planning and Optimizing BEV Fleets in Any Mining EnvironmentBy Robert Rennie, Taylor Davies, Ahsanul Rafi
Electric locomotives powered by extensive electrical cabling systems were prevalent in the mining industry in the early days of the 20th Century [1]. Since the movement of tethered electrical mining l
Jun 25, 2023