Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Purification Of Molybdenite Concentrates By A Continuous Sulfation-leaching ProcessBy I. WILKOMIRSKY, J. BECKER, F. Parada
The current processes that aim to purify molybdenite concentrates are not able to dissolve some copper compounds, hence limiting the processes. Typically, the copper content results are from 2 up to 4
Jan 1, 2023
-
Purification Of Niobium Oxide By Dissolution And Solvent ExtractionBy K. C. Nathsarma
An attempt was made to extract niobium oxide from ~98.5% Nb2O5 using solvent extraction processes. Nb2O5 is used as the feed material in carbothermic reduction processes aimed at producing high-homoge
Jan 1, 2011
-
Purification Of Niobium Oxide By Dissolution And Solvent Extraction (320fd803-b347-450b-9abd-4927cd240d6f)By K. C. Nathsarma
An attempt was made to extract niobium oxide from ~98.5% Nb2O5 using solvent extraction processes. Nb2O5 is used as the feed material in carbothermic reduction processes aimed at producing high-homoge
Nov 1, 2011
-
Purpose and Organization of Cooperative Program in Copper LeachingBy O. M. Bishop
Large reserves of copper are contained in waste dumps which have been created by open-pit mining of porphyry-type copper deposits in the Western United States. Nearly 6 billion tons of copper-bearing
Jan 1, 1970
-
Purpose And Role Of An Advisor To The Public Land Law Review CommissionBy Lloyd E. Haight
After accepting the invitation to make this appearance today, it occurred to me that the subject matter which had been assigned to me, namely, the purpose and role of an advisor, was, contrary to what
Jan 1, 1967
-
Purpose and TerminologyBy W. E. Horst
Raw materials and mineral products are crushed, ground, or pulverized for a variety of reasons. Some of the most important reasons for size reduction are: to liberate marketable mineral species from a
Jan 1, 1985
-
Pushback Design in Open-Pit Mines by Considering Geometric Requirements under a Mathematical Programming ApproachBy Enrique Jelvez, Pierre Nancel-Penard
The traditional way of generating open-pit mine production schedules has several limitations. This work addresses the design and production-scheduling problem by considering minimum operational space
Jun 25, 2023
-
Pushing Automation of Shearer Loaders to the Next Level – Horizon Control through Usage of Cutting-Induced DustBy T. Bartnitzki, N. Fietz
"INTRODUCTION For a long time now automation has been state of the art in production engineering and chemical engineering. The advantages of automation are, for instance, higher reliabilities of produ
Jan 1, 2015
-
Pushing the Envelope–Rehabilitation of the Cameron Run TunnelsBy Kurt Egger, Emily A. Baker
Rehabilitation work at the Cameron Run Tunnels entailed the restoration of seven heavily deformed, approximately 69 m long, steel liner plate supported culverts through a CSX Railroad embankment near
Jan 1, 2003
-
Pushing The Limits Of Gravity SeparationBy Claude Deveau, Stephen R. Young
Introduction Tanco History Tanco is sometimes known as the Bernic Lake Mine. It is located about 180 km east-northeast of Winnipeg close to the Manitoba-Ontario boundary. Tanco operates an undergr
Jan 1, 2005
-
Pushing the limits of Slurry Microtunneling and Direct Pipe® in North AmericaBy Gerhard Lang
"Slurry Microtunneling is a well-established technology building on over 20 years of experience in successful tunnel installations under all kinds of soil conditions across the U.S. and Canada. Recent
Jan 1, 2016
-
Putting Computational Fluid Dynamics To Work On Mining And Metals ProjectsBy D. M. Lane, J. M. Berkoe
Engineers and Owners share a common desire to build reliable, efficient plants on schedule at reasonable costs. This paper describes one tool that Bechtel finds can integrate these objectives by “pu
Jan 1, 2000
-
Pyke Asbestos Deposits, New ZealandBy R. C. Jr. Babcock, V. S. Znamensky
The Pyke asbestos deposits were discovered by Kennecott Explorations (Australia) Pty. Ltd. in 1969 during the course of base metal exploration on the South Island of New Zealand. Extensive occurrences
Jan 1, 1986
-
Pyrite depression by phosphates - in coal flotationBy J. W. Leonard, C. L. Jiang, B. K. Parekh, X. H. Wang
The selective depression of pyrite from the Kentucky No. 9 coal seam was systematically examined using various kinds of inorganic and organic chemicals. Most of the organic chemicals tested showed lit
Jan 1, 1999
-
Pyrite Depression By Phosphates In Coal Flotation (ed37846a-a17a-4d4c-ba4d-a13ac2daaf6a)By C. L. Jiang
The selective depression of pyrite obtained from Kentucky No.9 seam in coal flotation with various kinds of inorganic and organic chemicals was systematically examined. Most of the organic chemicals t
Jan 1, 1998
-
Pyrite Depression During Coal Flotation Part I - Inorganic IonsBy F. F. Aplan, V. Choudhry
This investigation is an exploratory study to evaluate a large number of potential pyrite depressants for use during coal flotation. Subsequently, the more promising reagents can be evaluated in detai
Jan 1, 1993
-
Pyrite Recovery Mechanisms In Coal FlotationBy S. K. Kawatra
In most operating coal-cleaning plants, a significant amount of pyrite is recovered in the froth during flotation of high-sulfur coal. Reducing the pyrite recovery first requires that the primary reco
Jan 1, 1992
-
Pyrite-pyrrhotite-grinding media contact and its effect on flotationBy R. L. Pozzo, A. S. Malicsi, I. Iwasaki
The electrochemical nature of mineral-grinding media interaction in the wet grinding of one and two sulfide mineral ores was investigated with regard to the flotation behaviors of the minerals. Two ir
Jan 1, 1991
-
Pyrite-Pyrrhotite-Grinding Media Contact And Its Effect On Flotation (c015f108-bf3a-494e-9c68-41287d6e42cb)By R. L. Pozzo
The electrochemical nature of mineral-grinding media interaction in the wet grinding of one and two sulfide mineral ores was investigated with regard to the flotation behaviors of the minerals. Two ir
Jan 1, 1988
-
Pyro Process For The Production Of Lightweight Aggregate From Fly-Ash And Wastewater SolidsBy D. M. Conner
An innovative patented process has been developed to convert high volume wastes--fly ash from coal-fired power plants, municipal solid waste (MSW) ash from incineration, solids from waste water treatm
Jan 1, 1997