  • SME
    Pipe Canopy Presupport with SEM Tunneling Under Active Roadway and Rail Tracks - RETC2023

    By Todd Kilduff, Ryan O’Connell

    Pipe canopies continue to gain momentum as a reliable methodology for construction of excavations below critical facilities with minimal surface settlement tolerances, such as railroads or roadways. T

    Jun 13, 2023

  • SME
    Pipe Conveyor And Belt: Belt Construction, Low Rolling Resistance And Dynamic Analysis

    New developments in the pipe conveyor and belt are advanced to address the growth in the capacity, length and complexity of pipe conveyor systems. Improved belt construction can offer better stability

    Jan 1, 2012

  • SME
    Pipe Conveyor Its Development And Advantages

    By Gregory A. Vaka

    Robins Engineers & Constructors, Inc. as the exclusive U.S. licensee introduced the PIPE CONVEYOR to the North American marketplace early in 1984. The sale of the first PIPE CONVEYOR in 1985 was a dif

    Jan 1, 1997

  • SME
    Pipe Heading In Highly Curved Routes Using As An Example The Nebensammler Neuland; Sections IV And V

    By Siegfried Zell

    Preface Pipe heading is a customary and proven technology for the underground installation of all types of piping. In over 90 % of all cases, straight pipe sections are used between shaft construct

    Jan 1, 1989

  • SME
    Pipe Jacking Big Time!

    By Klaus Rieker

    "Since the mid-19th century the River Emscher in the German Ruhr District has been used for disposing of wastewater. In the early 1990s, it was decided to replace the existing open wastewater system w

    Jan 1, 2016

  • SME
    Pipe Jacking for Large Diameter Sewer in Brooklyn, NY

    By Michael Deutscher, Jozef F. Zurawski

    Part of Capital Improvement Project SE-754 tendered by New York City Department of Design and Construction included installation of a 96-in. (2.47 m)diameter sewer by pipe jacking methods. The pipe se

    Jan 1, 2003

  • SME
    Pipe Jacking Techniques For Small Soft Ground Tunnels

    By Michael E. Allen

    The building of sanitary and storm drainage sewers in urban or environmentally sensitive areas often requires the use of tunnel construction procedures. While hydraulic considerations may require only

    Jan 1, 1981

  • SME
    Pipeline Tunneling by Connecting Conventional and TBM Methods under High Groundwater Pressure

    By Tsunenori Shibata, Kazunori Jimbo, Kaoru Toya, Masafumi Matsumoto, Jinya Mitsui, Toshinori Tsuji

    "The Toyama Line is under construction as a natural gas pipeline with a length of 102 km from Itoigawa City to Toyama City. A 2 km-long tunnel section of the pipeline that we are reporting here is bei

    Jan 1, 2016

  • SME
    Pipelining Bulk Minerals

    By James M. Link

    The first rule of mineral deposits always seems to be: the deposit is never close to the market. With gems and precious metals, this is not much of a problem. But with most of the mineral commodities

    Jan 10, 1982

  • SME
    Piping Induced Subsidence Over An Underground Mime

    By Allan M. Johnson

    Since 1974 researchers at Michigan Technological University have been studying mine subsidence in the Iron River District of Northern Michigan. The district, which was active from 1881-1978, has had n

    Jan 1, 1982

  • SME
    Piping-Induced Subsidence At The Sherwood Mine In Northern Michigan

    By Allan M. Johnson

    The Sherwood Mine is being monitored to determine the nature and extent of changes in the mine and its environs which result from the closing and the cessation of pumping. Of particular interest was t

    Jan 1, 1980

  • SME
    Pit And Quarry Licencing In Southern Ontario

    By Ronald T. Cosburn

    The Province of Ontario covers an area of some 400 thousand square miles, however the subject I will be talking about today, the licencing of pits and quarries in southern Ontario, refers to about one

    Jan 1, 1982

  • SME
    Pit And Quarry Operators Get Productivity Tips - From A Utility

    A one-day seminar designed to help quarry and mining managers make their operations more productive, more efficient and less expensive was held in Harris- burg PA. "Rock-Solid Productivity" was sponso

    Jan 1, 1998

  • SME
    Pit Lake Water Quality In The Western U.S.: Unifying Concepts

    By A. Davis

    Pit lake chemistry depends on the lithology and hydrologic characteristics of the ultimate pit surface, the availability of buffering capacity in the wall rock versus oxidizable sulfide content, and t

    Jan 1, 1996

  • SME
    Pit Lake Water Quality In The Western United States: An Analysis Of Chemogenetic Trends

    By L. E. Eary, Andy Davis

    The evolution of pit lake water quality depends on the lithology and hydrologic characteristics of the ultimate pit surface, the availability of buffering capacity in the wall rock vs. oxidizable sulf

    Jan 1, 1998

  • SME
    Pit Lake Water Quality In The Western United States: An Analysis Of Chemogenetic Trends (bfd9cce3-6ac0-458c-b12a-e31d4a21ae75)

    By Andy Davis

    The evolution of pit lake water quality depends on the lithology and hydrologic characteristics of the ultimate pit surface, the availability of buffering capacity in the wall rock vs. oxidizable sulf

    Jan 1, 1997

  • SME
    Pit Limit Analysis - Some Observations On Its Use

    By John T. Crawford

    Open pit limit analysis techniques of various types have been utilized for many years to design ultimate pit surfaces. In the last 15 years there have been many advances in the development of sophisti

    Jan 1, 1979

  • SME
    Pit Limit Parameterization From Modified 3d Lerchs-Grossmann Algorithm

    By F. Seymour

    A modified 3D Lerchs-Grossmann (LG) graph tree algorithm is presented that generates the complete set of nested maximum valued pits in a single run. This modified LG algorithm looks at the relative

    Jan 1, 1995

  • SME
    Pit optimization on clustered realizations: Identifying functional scenarios

    By Tyler Acorn, Brandon Wilson, Jeff Boisvert

    Project-scale decisions in surface mining operations rely on the optimization and subsequent evaluation of pit limits. This process ignores the ability for mine plans to adapt as more information is g

  • SME
    Pit Optimization on Clustered Realizations: IdentifyingFunctional Scenarios Mining, Metallurgy and Exploration

    By Tyler Acorn, Brandon Wilson, Jeff Boisvert

    Scenario-level uncertainty is a representation of large-scale differences encountered when considering ultimate mining pits optimized over various subsets of stochastic realizations. Accounting for sc