Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel
By Michael Rehbock-Sander
The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked
Jan 1, 2012
-
Design and Construction Considerations for Intersecting Tunnels—Charleston, SC - RETC2021
By Lindsey Schneider, Steve Kirk, Michael Miglioretti, Jeffrey P. Kolzow, Kyle White
The US17 Spring/Fishburne Drainage Improvements Project utilizes a stormwater conveyance tunnel system of approximately 8,250 LF. The tunnel system includes two intersecting tunnels of differing diame
Jun 13, 2021
-
Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023
By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall
The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana
Jun 13, 2023
-
Design and Construction Logistics for the Underground Laboratory at Cern, Switzerland
By Keith Jones, Martin Knights, Timothy Watson
In 1996 a KBR (Brown and Root) led international JV was appointed to design and supervise an underground and surface package. The design of 6 km of tunnels, plus enlargements, deep shafts in glacial a
Jan 1, 2003
-
Design And Construction Of A 5-Kt (5500-St) Facilities Module For Main Pass 299 Sulfur Mine
By C. W. Nelson, A. G. Moody
This paper describes the design, equipment selection and onshore fabrication of the largest facilities module ever installed in a single lift in the Gulf of Mexico. Measuring 35.5 x 70.1 x 21.3 m (110
Jan 1, 1994
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope
By J. F. Able, F. Djahanguiri
The US Bureau of Mines conducted research on underground stope leaching of metalliferous ores. Leaching underground would minimize the environmental impact of ore processing on the surface and would m
Jan 1, 1998
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope
By F. Djahanguiri
The U.S. Bureau of Mines is conducting research on underground stope leaching of metalliferous ores to minimize the environmental impact of ore processing on the surface and to maximize minable reserv
Jan 1, 1995
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope
By F. Djahanguiri
The US Bureau of Mines con¬ducted research on underground stope leaching of metalliferous ores. Leaching underground would minimize the environmental impact of ore processing on the surface and would
Jan 1, 1997
-
Design and Construction of a Deep Underground Station in Urban Area - RETC2021
By Verya Nasri
This paper will present the design and construction of a deep underground station of the Réseau Express Métropolitain (REM) project; the Édouard Montpetit station. The Édouard-Monpetit station is an i
Jun 13, 2021
-
Design and Construction of a Deep, Dual-Cell, Slurry Wall Shaft in Soft Ground
By Edwin Itzig-Heine, Daniel Traylor, Bernard Tarralle, Michael McKenna
This paper discusses the challenges associated with the design and construction of a dual-cell, “figure eight” shaped shaft in saturated, soft ground for the Northeast Interceptor Sewer project in Los
Jan 1, 2003
-
Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project
By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal
Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som
Jan 1, 2001
-
Design And Construction Of A New Mine - The Design Of Mimosa #2 Mine ? Introduction
By Ulises Deveze T.
The coal company Minerales Monclova, S.A. (MIMOSA), the owner of the Mimosa R Line, is a subsidiary company of Altos Hornos de Mexico, S.A., the largest steel plant in Mexico with an annual capacity o
Jan 1, 1974
-
Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022
By John Murray, Daniel Ebin, Robert Gould, Yiming Sun, Lizan Gilbert
The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover
Dec 1, 2022
-
Design and construction of a surface air cooling and refrigeration installation at a South African mine
Impala Platinum?s No.16 Shaft mine is currently under construction and is expected to reach full production of 256 500 tons per month by 2014. Mining will start at 1 260 m below surface with a maximum
Jan 1, 2009
-
Design and Construction of a Vehicular Underpass Under a Live Highway
By Nai-piu Tong, Huaren Dou, Sui-shun Poon, Leslie H. Swann
This paper mainly presents geotechnical aspects of a vehicular underpass that was built across under one of the busiest highway in Hong Kong. The underpass, in a section comprising an upper arch and i
Jan 1, 2003
-
Design And Construction Of Access Shaft And Cross Adit Los Angeles Metro Rail Tunnel Contract A146
By Wolfgang H. Roth, Stephen J. Navin, Samuel K. Louis, Anthony F. Stirbys
This paper presents a case history of the design and construction of the access shaft and cross adit utilized to gain access to the Los Angeles Metro Rail tunnel alignment, at the A146 Contract site.
Jan 1, 1989
-
Design And Construction Of Bins
By F. Forbes
For many years, the Machinery Division of Dravo Corporation has been designing and constructing bins and hunkers as part of overall plant facilities. We have designed bins to handle a variety of mater
Jan 1, 1968
-
Design And Construction Of Bulkheads For Underground Backfill Systems
By A. Afrouz, F. P. Hassani
The types of bulkhead that contain backfill in stopes under various pressures and mining conditions are outlined. Conventionally adopted theoretical and empirical techniques were integrated in the des
Jan 1, 1993
-
Design and Construction of Clay Liners for Gold Tailings Facilities and Heap Leach Pads
By Bruce S. Brown, Jeremy P. Haile
The construction of tailings facilities and heap leach pads for gold mining operations generally requires the installation of one or more impermeable liners beneath the structures to satisfy environme
Jan 1, 1988
-
Design and Construction of Dulles Airport Tunnels
By Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field
With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn
Jan 1, 2007