Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Tunneling?Pipe Jacking of Large Diameter Pipes in O?Hare International AirportBy Mohammad Djavid
The one-pass tunneling pipe jacking method has often been the most schedule and cost efficient method for the pipe line installation. The main challenges in jacking pipes larger than 108 inches and fo
Jan 1, 2008
-
Tunneling?s Role In Sustainable Development Discussed At United NationsThe Earth?s population is approaching 6.6 billion people. More than half live in urban areas. And, as those figures continue to grow, the need to make wise use of the world?s natural resources as we
Jan 1, 2008
-
Tunnelling Concepts for Heterogeneous and Weak RockBy Gunther Riedmuller, Johann Golser, Peter Schubert
The paper deals with the experience of the authors to cope with tunnel projects in heterogenous and weak rocks. The procedures applied to the investigation of such areas, the geotechnical assessment,
Jan 1, 1993
-
Tunnelling for the Channel Tunnel Rail LinkBy David Court, Rab Brown
The paper discusses the work in progress on the construction of the extension of the High Speed Rail line from the Channel Tunnel into the centre of London UK known as the “Channel Tunnel Rail Link” (
Jan 1, 2003
-
Tunnelling In Glacial Deposits At The Example Grauholztunnel Bern (Makro-Tunnelling) And Sewer Moosstrabe Salzburg (Mikro-Tunnelling)By Claus Becker
Waterbearing, cohesive or non-cohesive grounds with glacial stone deposits are found very often in Europe. The problem consists of destroying the boulders and supporting the face simultaneously. At
Jan 1, 1989
-
Tunnelling on the South East Transit ProjectBy T. W. Peglas, J. Doherty, R. A. Day
The South East Transit Project is a $520 million project in Brisbane, Australia which includes the construction of a 32 km Busway to access the south-eastern suburbs. Close to the centre of Brisbane,
Jan 1, 2001
-
Tunnelling Technology And Our Nation’s Research And Development StrategyBy William S. Butcher
Research and development of tunneling technology is rapidly taking its rightful place as an important ingredient in the Nation's research and development strategy. The state of technology in t
Jan 1, 1997
-
Tunnelling Under Glaciers - Construction Update: Galore Creek Mine Access Tunnel, British Columbia, CanadaBy Dean Brox
The Galore Creek Mine project is one of the newest major mining projects under development in Canada. The project is located in a very remote area of northwestern British Columbia and is being develop
Jan 1, 2008
-
Tunnelling Under the Fraser River at 6 Bar - Design and Construction of the Port Mann Main Water Supply TunnelBy Tim Langmaid, Steve Skelhorn, Stephanie Robillard, Allen Mitchell
"The Port Mann Main Water Supply Tunnel project provides a critical water main crossing of the Fraser River for the owner, Greater Vancouver Water District (Metro Vancouver). The project consists of t
Jan 1, 2016
-
Tunnelling Under The Harlem RiverBy Jacek B. Stypulkowski
This paper discusses the challenges faced by the design team of the under-river crossings of electric transmission feeders in New York City, a densely populated urban area. The under-river crossing of
-
Tunnelling With Hydraulic Drills At Aabjoera Hydro Electric Plant In NorwayBy Alf Thidemann, Per Marius Nilsen
Tunnelling with hydraulic drills has been a success in Norway. In the fall of 1976 excavation of tunnels for the development of the Aabjoera scheme was started. Two and a half years later a total of 2
Jan 1, 1979
-
Tunnels - The Owners' ProblemsBy T. J. Jr. Corwin
This paper will cover the problems confronting an owner when planning and estimating the cost of a proposed tunnel. Three factors are known: the length, size and the time allocated for the completion
Jan 1, 1974
-
Tunnels And Shafts - Des Plaines SystemBy Thomas F. Martin, Daniel J. Sieve
In April 1988, the joint venture of Morrison-Knudsen and Paschen Contractors (M-K/P) was the successful low bidder for the Metropolitan Water Reclamation District of Greater Chicago's (MWRD) Cont
Jan 1, 1991
-
Tunnels And Shafts, Roosevelt Road To Ogden AvenueBy Thomas F. Martin
Contract 75-124-211 extends along the Chicago River from Roosevelt Road on the south to Ogden Avenue on the north. In addition a branch tunnel runs east from approximately mid-project ending near Lake
Jan 1, 1979
-
Tunnels for the Murum Hydroelectric Project - Pressure TunnelsBy Carlos A. Jaramillo, Seng Hing Ngu
"The Murum Hydroelectric Project is a 944-MW development consisting of a 145 meter high RCC dam, two 2660 meter long, 9 meter excavated diameter upper pressure tunnels, surge shafts, two 950 meter lon
Jan 1, 2016
-
Turbocharged engines require special lubrication maintenanceBy Jerry T. Shelby
Surface and underground mining operations require equipment with high power output ratings. Haul trucks, loaders, dozers, and other equipment need increasing horse-power to meet production demands.
Jan 3, 1987
-
Turbulent diffusion coefficient in mine airwaysBy N. P. Widodo
The ventilation measurements by tracer gas method at Pongkor gold mine show that effective diffusion coefficient, E, at straight airways indicated a similar range of measured one by the laboratory exp
Jan 1, 2009
-
Turbulent Models for Pollutant Transport in Open Pit Mines under Stable Boundary LayerBy R. V. Ramani, K. V. Raj
"The air flow problems in open pit mines are complex. Computational fluid dynamics (CFD) models provide a detailed knowledge of the airflow pattern and velocity distribution, temperature, and pollutan
Jan 1, 2015
-
Turbulent models for pollutant transport in openpit mines under stable boundary layer - SME Transactions 2015By R. V. Ramani, K. V. Raj, S. Bandopadhyay
The air flow problems in openpit mines are complex. Computational fluid dynamics (CFD) models can provide detailed information regarding air flow pattern, velocity distribution, temperature, and pollu
Jan 1, 2015
-
Turkey operates its first overland conveyor with horizontal curvesBy M. Sagheer
An 8.5-km (5-mile) conveyor has gone into operation in western Turkey to eco¬nomically transport crushed lignite from the mine area to a power plant. This conveyor has replaced trucks as the principal
Jan 1, 1989