    TARP—Torrence Avenue Tunnel

    By Bob Rautenberg, Luminita Calin

    The Tunnel and Reservoir Plan (TARP), commonly known as the Deep Tunnel Project, was developed by the Metropolitan Water Reclamation District of Greater Chicago as a two-phase solution to the problem

    Jan 1, 2001

  • SME
    Tata Chemicals North America finds stability, success in Southwest Wyoming

    By William Gleason

    "In a time that seems to be dominated with nothing but bad news coming from the mining industry, there is a success story that has been quietly happening in Southwestern Wyoming for more than 60 years

    Jul 1, 2016

  • SME
    Tax incentives are key to survival of Canadian mineral exploration

    By Kenneth A. Grace

    Introduction The 1980s have not been kind to the mining industry, especially in the United States. As mineral commodities prices plunged, marginal producers were squeezed out and then major players w

    Jan 1, 1989

  • SME
    TBM and Logistics for Constructing Twin Tunnels Between Artificial Islands in Hampton Roads - RETC2021

    By Sergio Estebanez, Martha Gross, Ruben Rubal, Yvonnick Rescamps, Alexandre Cochennec

    The Hampton Roads Bridge-Tunnel (HRBT) Expansion project in coastal Virginia, USA will add two 1.5-mile (2.4 km) TBM bored tunnels alongside two existing immersed-tube tunnels between artificial islan

    Jun 13, 2021

  • SME
    TBM And NATM Combined Solution For A Very Deep Tunnel?The ?Pajares? Case

    By Enrique Fernández

    INTRODUCTION The high speed rail link between Madrid and Asturias, in the North of Spain, has encountered in the Cantabrian range the biggest challenge of the whole line, a very deep tunnel, 25 km l

  • SME
    TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Fabrizio Fara

    As part of the Ship Canal Water Quality Project, 2.7-mile Combined Sewer Overflow tunnel is excavated with a 21.5-foot diameter EPB Tunnel Boring Machine. Due to the difficult geological and hydrogeol

    Jun 23, 2024

  • SME
    TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022

    By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell

    As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic

    Dec 1, 2022

  • SME
    TBM Data and Performance Monitoring on Large Diameter TBM Tunnels Lined with Shotcrete in the Himalayas—A Case Study - RETC2021

    By Gary Peach, Peter Mason

    Planning and estimating progress rates and costs for tunnelling is always best done based on experience and historic precedent. Much precedent is available but the use of data monitoring, data mining

    Jun 13, 2021

  • SME
    TBM Data Management And Quality Assurance For The Brightwater Conveyance Project

    By Jeffrey Mitsopoulos

    King County?s (KC) Brightwater Conveyance Project in Seattle, Washington involves the construction of approximately 21 kilometers (13 miles) of bored tunnel, in three contracts, with four TBM?s which

  • SME
    TBM Excavability: Prediction and Machine–Rock Interaction

    By Z. T. Bieniawski, José Miguel Galera, Benjamín Celada

    TBM case histories from over 400 tunnel sections are analyzed presenting a comprehensive application of the Rock Mass Excavability (RME) index (Bieniawski et al.2006). The paper introduces two new adj

    Jan 1, 2007

  • SME
    TBM Excavation Of Rogers Pass Railroad Tunnel

    By Gail B. Knight

    INTRODUCTION In May 1984, The Canadian Pacific Railway awarded to the Joint Venture of Foundation of Canada, Ltd. of Toronto, Atlas Construction Co. of Montreal, and S. A. Healy Co. of Chicago the

    Jan 1, 1987

  • SME
    TBM Excavation Through Pre-Existing Tie-Backs—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Franco Gasperin, Fabrizio Fara

    This document describes the challenging task of mining through tiebacks using a 21'-8" diameter Tunnel Boring Machine (TBM) as part of the Ship Canal Water Quality Project. The mining operation involv

    Jun 23, 2024

  • SME
    TBM Operation Challenges at DTL3 C931 Project in Singapore

    By Bo Kyung Sim, Dae Young Kim, Jae Won Lee, Ebrahim Farrokh

    "The contract C931 of the downtown line 3 (DTL3) mass rapid transit system of Singapore includes half a kilometer twin tunnels running between Mattar and Macpherson stations. An EPB TBM of 6.6 m diame

    Jan 1, 2016

  • SME
    TBM Performance At Four Hard Rock Tunnels In California

    By Tim Avery, Steve Klein, Mark Schmoll

    Tunnel boring machine (TBM) performance in hard rock is highly dependent on the geologic conditions, including the type of rock and hysical properties like the rock strength, hardness, and the spacin

    Jan 1, 1995

  • SME
    TBM Removal Within the Busiest Passenger Interlocking in the United States - RETC2021

    By Devan Naik, Matthew Stokes, Andy Nigro

    This paper describes the surgical removal of a 24 ft dia. Slurry Shield TBM entombed beneath one of the country’s busiest commuter rail interlockings, the Harold Interlocking in Queens, NY, and the co

    Jun 13, 2021

  • SME
    TBM Rescue Shaft, Tunnel, and Relaunch in Karst Conditions - NAT2024

    By Dan Swidrak, Bill Zietlow

    Halfway through a 17,770-ft long stormwater tunnel, an 11-ft diameter TBM encountered a karst void below the Mississippi River in Missouri, resulting in significant inflow. It was decided that the TB

    Jun 23, 2024

  • SME
    TBM Risk Management System considering Predicted Ground Condition Ahead of Tunnel Face: Methodology Development and Application

    By Hee-Young Chung, In-Mo Lee, Jeongjun Park, Hangseok Choi, Seok-Won Lee

    "When using a Tunnel Boring Machine (TBM) during tunneling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These reduce the stability of tunnels, and

    Jan 1, 2016

  • SME
    Tbm Shield Abandonment Beneath the Fraser River for Connecting Tunnel and River Riser of the Annacis Island WWTP New Outfall System - NAT2024

    By John Newby, Ulf Gwildis, Ken Massé, Guillaume Roux

    How to connect an effluent conveyance tunnel to riser shaft and diffuser arms of an outfall system is dictated by the ground conditions, which ideally include rock or soil strata of low permeability.

    Jun 23, 2024

  • SME
    TBM System Downtime - Causes, Frequency, And Duration On Six Tunnel Projects

    By Priscilla P. Nelson, Steven D. Glaser, Thomas D. Rourke, O&apos

    Construction records from six projects which employed full-face TBMs to drive 18 km of tunnel in sedimentary rock have been analyzed. More than twenty individual causes of delay could be identified. D

    Jan 1, 1985

  • SME
    TBM Technology for an Australian Coal Drift: The Grosvenor Project

    By Robert Marks, Enrico Dal Negro, Richard Schulkins

    "In July 2012 construction started on the Grosvenor project, a five million tonne per annum underground longwall mine planned for Moranbah in Central Queensland. Grosvenor is located immediately to th

    Jan 1, 2016