Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Site Evaluation Criteria, Exploration & Development of Small-Scale Placer Gold MinesBy Mortimer J. Richardson, Earl H. Malmstrom
INTRODUCTION The art of placer gold mine evaluation and mining has had an interesting evolution beginning in earliest times. DE RE METALLICA (c.1556), documents the use of rockers, circular sieves
Jan 1, 1987
-
Site Evaluation For Cavability And Underground Support Design At The Climax MineBy John T. McDonough
The Climax Mine of AMAX's Climax Molybdenum Division is currently producing approximately 34,000 tons of molybdenum ore per day from two underground levels (see Figure I), and initial design is u
Jan 1, 1977
-
Site Investigations And Geotechnical Assessment For The Construction Of The Deep Underground Science And Engineering Laboratory At The Former Homestake MineBy Z. J. Hladysz
A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, South Dakota, under the sponsorship of the National Science Founda
Jan 1, 2011
-
Site investigations and geotechnical assessment for the construction of the deep underground science and engineering laboratory at the former Homestake Mine - SME Transactions 2011By W. Roggenthen, Z. J. Hladysz, G. D. Callahan, W. G. Pariseau, W. Weinig, C. Randolph-Loar, R. Popielak
A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, SD, under the sponsorship of the U.S. National Science Foundation
Jan 1, 2011
-
Site Investigations And Mined Tunnel Costs--Comparisons And ConclusionsBy Charles W. Daugherty, Eugene B. Waggoner
In the construction of recent subsurface projects, particularly mined openings and transit systems, it has been apparent that final costs were often greater than first expected. Because many overruns
Jan 1, 1985
-
Site Investigations For Large Diameter Drilled ShaftsBy Donald P. Richards, William M. Greenslade, Daniel E. Albers
INTRODUCTION The application of oil field technology to large diameter hole drilling is beginning to offer a cost effective alternative to conventional shaft sinking methods. The drilling of ventil
Jan 1, 1981
-
Site Investigations Over Abandoned Underground Mines ? SummaryBy Robert M. Cox
A thorough geological engineering investigation is required before surface lands overlying abandoned underground mines can be safely recommended as building sites. The major problems confronting the g
Jan 1, 1975
-
Site planning process : Application to land use potential evaluation for mined land (Technical Paper)By R. J. Sweigard, R. V. Ramani
Productive and beneficial use of reclaimed surface-mined land is a concern of industry, government, and the general public. A process has been developed that will aid mine planners and public planners
Jan 1, 1987
-
Site Selection And Environmental Analysis Of Coal Gasification PlantsBy Sheridan A. Glen
As the Federal government along with individual states continue to grapple with the job of refining a comprehensive energy policy, coal continually stands out as an energy source which heralds a combi
Jan 1, 1977
-
Site Selection And Licensing Of Mined Geologic Repositories For Disposal Of High-Level Radioactive Wastes ? IntroductionBy M. Kehnemuyi
The U.S. Department of Energy is charged, by federal law, with the responsibility for developing and implementing programs for long- term storage and terminal disposal of high- level radioactive waste
Jan 1, 1981
-
Site Specific Blasting Model For Mine-To-Mill OptimizationBy K. M. Kim
A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in-situ block size (F80), the post-blast fragmentation (P80) and the intact tensile
Jan 1, 2011
-
Site Testing For Large Volumes Of Deep SpaceBy R. L. Loofbourow, Robert R. Miller
Deep, stable, unlined space promises secure, efficient, acceptable solutions to several current problems. With truly favorable conditions, it can be economic as well. The basic requirement is suffi
Jan 1, 1981
-
Site Testing Of Shafts, Tunnels And Caverns; The Pregrouting Of Excavations With Special Reference To South African Conditions.By Norman D. Harte, George W. Holl
The development of the most important tool used in Site Testing is reviewed briefly and the application of the information gained is described. The operation of Site Testing and pregrouting of undergr
Jan 1, 1981
-
Site-specific blasting model for mine-to-mill optimization - SME Transactions 2011By J. Kemeny, K. M. Kim
A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in situ block size (F80), the post-blast fragmentation (P80) and the intact tensile
Jan 1, 2011
-
Site-Specific Environmental Parameters ? A Baseline For The Development Of Tailored Indicator Approaches For Metallic Raw Material FlowsIn order to analyze and quantify distinct environmental properties in the vicinity of sites, the Site-Specific Natural Resources Information System (SARIS) has been developed based on a Geographic Inf
Jan 1, 2003
-
Site-Specific Predictions Of Ground Vibrations Induced By BlastingBy S. A. Shoop
Vibrations from thirty-seven blasts were monitored using three seismographs. Data analysis showed that square root, cube root, and site-specific scaling predicted ground motion with equal reliability.
Jan 1, 1983
-
Sitech Cyclone Linings A Breakthrough In Abrasion ControlBy Matthew Horsnell
Greenbank Terotech is a member of the Halley & Mellowes Group of Companies and is accredited t AS3902. Greenbank has been involved within the wear resistant lining industry for over 20 years. Initiall
Jan 1, 1995
-
Siting and Design of Tailings ImpounmentsBy Steven G. Vick
Not too long ago a mill superintendent, when asked where his tailings were being disposed, could simply shrug his shoulders and point to the open end of the thickener discharge pipe. This “out of sigh
Jan 6, 1981
-
Siting Synthetic Fuel PlantsBy William G. Wilson
In the U.S. today a number of tentative synthetic fuel plants have been sited by a number of major corporations. Each of these for a number of reasons have deferred construction. The only synthetic fu
Jan 1, 1977
-
SIU-Sim: A Novel Coal Preparation Plant SimulatorCoal preparation plant simulators are used to study flowsheet alternatives and determine product quality and quantity that can be produced under various operating conditions for individual circuits. S
Jan 1, 2008