Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • DFI
    Construction and Testing of Very Large Diameter Drilled Shafts for Abernethy Bridge

    By Peter Faust, Mike Muchard

    The I-205 improvements in Oregon include the seismic retrofit and widening of the Abernethy Bridge to withstand major earthquakes. When completed it will be the first earthquake-ready bridge that cros

    Jan 1, 2025

  • DFI
    Load Testing for Acceptance of Shafts with Questionable Integrity: case Studies

    By Stephen Slomski, Benjamin White, Bradley Klausing

    Integrity assessment of drilled shafts can be determined by considering information from many points in the construction process. Observation of the drilling and shaft installation can provide additio

    Jan 1, 2025

  • DFI
    Happy Birthday T-Value Method

    By Andrew Lees

    Where in-situ ground is too weak to support piling rigs and other mobile plants, a temporary platform of stronger granular material may be constructed to distribute plant loads safely to the underlyin

    Jan 1, 2025

  • DFI
    Fellenius Releases wave Equation

    By Bengt Fellenius

    I remember the 1983 conference and this "DFI News" note with its summary of my lecture - and how I cringed on seeing the heading of the note, claiming that I had "released the wave equation." The WEAP

    Jan 1, 2025

  • DFI
    Should the Industry Care About Scope 3?

    By Aaron Gallant

    Civil engineering and construction companies are increasingly aware of the environmental impact and associated greenhouse gas (GHG) emissions linked to their daily operations and design decisions. Man

    Nov 1, 2024

  • DFI
    Contract Documents of The Future

    By Derrick Dasenbrock

    Geotechnical engineers are usually well-acquainted with contractual and noncontractual documents used to convey geotechnical information in a construction project - typically sub-surface exploration l

    Nov 1, 2024

  • DFI
    Low Carbon Initiatives at Euston Station

    By Johann Kraxenberger, Matthew Gregory, Bauer Maschinen, Deon Lauw, Franz-Wener Gerressen, Robert West

    High Speed Two (HS2) is a major high-speed railway project in the U.K. connecting London to the West Midlands. The 21 km (13 mi) of twin-bore tunnels in London include numerous geotechnical structures

    Nov 1, 2024

  • DFI
    Enhancing Deep Foundation Practices in DOT Projects

    By Jesse Rauser, Gavin Gautreau, Xin Peng

    The field of deep foundation engineering is undergoing significant changes. Long reliant on established methods and expert judgment, the industry is now integrating data-driven techniques that are tra

    Nov 1, 2024

  • DFI
    Future Forward: Industry Roundtable

    By Katie Kontos

    The changing landscape of the deep foundations industry is being propelled by many things-most prominently, digitalization, automation and increased emphasis for sustainability. But this is only the t

    Nov 1, 2024

  • DFI
    Axial Capacity of Drilled Shaft in Overconsolidated Clay: Surprising Installation Techniques Impact

    By Emad Farouz, Ali Albatal, Ehab Shatnawi

    Drilled shafts are deep foundations that can carry heavy loads by transferring them to deeper and stronger soil or rock layers.  The paper focuses on the drilled shafts installed in the Potomac C

    Oct 7, 2024

  • DFI
    Performance Analysis and Remedial Measures for Distressed Tank Foundation: A Case Study

    By Mriganabh Choudhury, Sanjoy Bhowmik, Sampat Raj, Vijay Panwar

    Tanks play a vital role in Petroleum refineries and Petrochemical complexes by storing Petroleum substances at various stages. The performance of the foundation system of tanks significantly influence

    Oct 7, 2024

  • DFI
    Environmental Benefits of Repurposed Tubular Steel Sourced from Pipe Mill Secondary and Oil Field Surplus

    By Mark Dowling, Robert Holdway, Bill Baillie

    Extending the utility of materials through reuse, repurpose and recycling to minimize waste, pollution, water, and the consumption of finite resources, reduce environmental impacts and cut GHG emissio

    Oct 7, 2024

  • DFI
    Drilled Shaft Construction and Some NDT Surprises at the Portal North Bridge

    By Jim Glider, Peter Faust, David Joyner, Michael Muchard

    The existing, century-old Portal Bridge over the Hackensack River in New Jersey is a two-track moveable swing span bridge that is nearing the end of its functional life. A new fixed bridge with spans

    Oct 7, 2024

  • DFI
    Thinking Bigger – 32-Storey Building on Helical Piles

    By Joe Heinisch, Trevor Quayle, Brian Huber

    Helical piles have often been characterized as handy little tools in the toolbox of solutions for structural support of foundations. They have provided options to construct foundations and anchorage i

    Oct 7, 2024

  • DFI
    A Unique Application of Diaphragm Wall to Facilitate the Excavation of New River Channel on the Port Lands Flood Protection and Enabling Infrastructure Project in Toronto, Ontario

    By Max Ho, Hiu Lee

    The Port Lands in Downtown Toronto is a vast waterfront area that has been long remained undeveloped. This is due to the dual challenges of soil contamination resulting from decades of industrial acti

    Oct 7, 2024

  • DFI
    Special Construction and Geotechnical Considerations in Deep Foundation of Vaudreuil-Soulanges Hospital Center in Greater Montreal Area

    By Marcel Martineau, Vincent Landry, Simon Didone Arseneau, Ali Fallah Yeznabad, Damien Lamblot, Mathieu Cattone, Habib Akande, Marion Bouet

    Vaudreuil-Soulanges Hospital Center in Greater Montreal area is a substantially large construction project with challenging schedule and geological conditions. The foundation consisted of 519 piles wi

    Oct 7, 2024

  • DFI
    Marine Construction on Loch Lomond Inlet/Outlet Replacement Project at Newell Creek Dam, Ben Lomond, CA

    By Blaise Fettig

    Santa Cruz Mountains, Ben Lomond, CA Vortex Project Sponsor- Blaise Fettig Vortex PM- Peter Dworetzky Obayashi Corp (Prime Contractor) PM- Kenji Yamauchi ABSTRACT: The City of Santa Cruz Water Departm

    Oct 7, 2024

  • DFI
    Permeation Grouting of a Subsidence Impacted Watercourse in the Southern Coalfields

    By Glynn Price

    Myrtle Creek has been impacted by the subsidence associated with longwall mining at Tahmoor Coking Coal Mine in Picton, NSW.  Specific impacts are fracturing of the rock bed resulting in a reduct

    Oct 7, 2024

  • DFI
    Sustainable Practices in Mitigating Liquefaction-Induced Foundation Settlements: A Focus on Carbon Footprint Reduction During Sheet Pile Design

    By Md Kausar Anik, Ramin Motamed

    The phenomenon of liquefaction-induced ground settlements has been frequently observed in several significant earthquakes, such as the 2010–2011 Canterbury Earthquake Sequence (CES) in New Zeala

    Oct 7, 2024

  • DFI
    Installation of a Cutoff Wall Along the Mississippi River – A Case History

    By Michael Arnold, Matteo Bertoni

    This paper presents a project which received a DFI Special Recognition Award as a runner-up in the 2023 DFI Outstanding Project Award competition. The East St. Louis levee system is located in St. Cla

    Oct 7, 2024