Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • DFI
    Lateral Behavior Of Post Grouted Drilled Shafts

    By Emad Farouz, Ehab S. Shatnawi, Charles Winter

    The increasing demand for small deformations and high-capacity drilled shafts without enlarging drilled-shaft diameters has motivated the development and increased use of a base grouting (BG) techniqu

  • DFI
    Bi-directional Load Testing Using Donut Super Cells For Hangzhou West Railway Station

    By Antonio Marinucci, Robin Mao

    The new Hangzhou West Railway Station, which is currently in the early stages of construction, will be located in the city of Hangzhou, China. To accomplish the ambitious goals of the project, the con

  • DFI
    One Seam At A Time: Interactive Quality Assurance To Identify Coal Seams During Foundation Construction

    By Matthew Runion, Christopher Lawler

    The Aeolus – Jim Bridger Transmission Line Project is located in southern Wyoming, home to some of the largest coal seams in the world. Coal seams present unique challenges to underground construction

  • DFI
    Simulation Of Soil-structure Interaction With Sheet Pile And Retained Soil

    By Clarissa Aguiar, Seok hyeon Chai, Thamer Yacoub, Sina Javankhoshdel

    Sheet piles are used as an excavation support for soil retention. They are interlocked systems to form a wall for earth support along with anchors to provide an extra lateral support in excavations. T

  • DFI
    Risk Management For Dam Rehabilitation Projects

    By Dave Paul

    Dam rehabilitation involves a range of design, construction, and operation risks, some of which are not encountered in new dam construction. These risks can have significant impact on project schedule

  • DFI
    Lessons Learned From Construction Of A Tire Plant In Karst, Ns2 Tires, White, Ga

    By Robert L. Goehring, Fred Munene

    This case history for three major additions to a tire manufacturing plant in north Georgia discusses the impact of highly variable Karst (sinkhole) geology on both foundation design and construction.

  • DFI
    Quality Assessment Of Drilled Shaft Foundations At The Jane Byrne Interchange

    By Travis Coleman, Elvis Ishimwe

    Currently, more than 400 drilled shafts have been constructed by various contractors at the I-90/94 and I-290 Jane Byrne (Circle) Interchange, located near downtown Chicago, Illinois. Cross-Hole Sonic

  • DFI
    Centrifuge Modeling Of Axial Failure Of Helical Piles In Cohesive Soils

    By Richard Schmidt, Lijun Deng, Mohamed Abdelaziz, Weidong Li

    Helical piles are widely used as a foundation supporting a variety of different structures. Understanding the axial behaviour of helical piles is required to confirm the engineering design. Helical pi

  • DFI
    Pile Diameter Effects On Initial Modulus Of Subgrade Reaction For Laterally Loaded Piles

    By Hubert Law, Amin Rahmani

    This paper evaluates the effects of pile diameter on the initial modulus of subgrade reaction and proposes modifications to the subgrade reaction moduli that are commonly used in the current state of

  • DFI
    Trouble In Paradise: Micropiles As A Solution To Challenging Geotech And Steep, Rugged Terrain On The Island Of Oahu

    By Steve Davidow, Scott Tunison

    As the demand for electric power grows and generation facilities are constructed in more remote areas, the industry faces an increasing number of foundation construction challenges. The importance of

  • DFI
    On Driven Piles In The Arabian Gulf: Imperfections, Potential Challenges, And Lessons Learned

    By Waddah Akili

    The demand on pile installation in the offshore of the Arabian Gulf has, over the last two decades, experienced unprecedented boom, triggered by the construction of platforms, to help facilitate the p

  • DFI
    Non-destructive Testing Of Unknown Bridge Foundation Lengths Using Parallel Seismic Testing

    By Chetan D. Savani, Mike K. Muchard

    The necessity to evaluate undocumented foundation lengths is essential in assessing the useable life, need for scour protection, retrofitting, or full reuse of existing bridge foundations. For this pu

  • DFI
    Installing And Testing Multi-bar High Capacity Rock Tiedowns

    By Andrew Pontecorvo, Steven Lowe, David Sposito

    Buildings with large height-to-width ratios require foundations with significant uplift resistance. This paper presents a case study of the permanent rock tiedowns installed for One Manhattan West, a

  • DFI
    Three-Dimensional (3D) Limit Equilibrium Method (LEM) Comparative Study of a Landslide Case Study Supported with Piles

    By Terence Ma, Seok hyeon Chai, Jeff Lam, Thamer Yacoub, Brigid Cami, Sina Javankhoshdel

    The Limit Equilibrium (LE) analysis of pile-supported geotechnical structures normally assumes a constant shear force for the pile instead of considering the non-linear capacity of the pile which is r

    Sep 8, 2021

  • DFI
    Today’s Connectivity: Using Historical Data to Anticipate Future Risk

    By Michael Frawley, Deana Ruud, Jessica Turner

    Technology is allowing for new ways to mitigate risk associated with subsurface exploration and unanticipated subsurface conditions during construction. Unanticipated subsurface conditions have the po

    Jan 1, 2019

  • DFI
    Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And Construction

    By David R. Sutfin, Joseph Lodde

    110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method

    Jan 1, 2019

  • DFI
    Top-Loaded Bi-Directional Test and the Conventional Bi-Directional Load Test, a Direct Comparison

    By Patrick J. Hannigan, Seth Robertson, Frank Rausche, Rozbeh B. Moghaddam

    The Top-Loaded Bi-Directional Test (“TLBT”) and the conventional Bi-Directional Load Test (“BDLT”) are full-scale load tests where loads are applied bi-directionally to the foundation element. The BDL

    Sep 8, 2021

  • DFI
    Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load Testing

    By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam

    The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l

    Sep 8, 2021

  • DFI
    Tresfjord Bridge -Pile Works

    By Andreas Andenæs, Arne Schram Simonsen

    "AbstractThe Tresfjord bridge is with its variety in foundation concepts and difficult soil conditions one of the most geotechnically challenging projects in Norway at the time. The project comprises

    Jan 1, 2014

  • DFI
    TTMJ – The New System for Slurry (Diaphragm) Wall Joints

    By Maurizio Siepi, Paul van Horn, John Coupland, Julian Crawley

    "TTMJ is the acronym for the Slurry (Diaphragm) Wall Tension Track Milled Joint currently in development as part of the European Union's innovative and far-reaching Horizon 2020 initiative (FTI Pilot-

    Jan 1, 2017