Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Selection of optimum ferronickel grade for smelting nickel lateritesBy B. Wasmund, M. Y. Solar, I. Candy
The nickel laterite industry is divided into two camps when it comes to the grade of the ferronickels produced. One group, led by Falcondo and Cerro Matoso, markets high-grade ferronickels in the rang
Jan 1, 2008
-
Process Improvement Update at Brunswick MineBy Jodi Roberts, Curtis Deredin, Jean-Guy Paulin
"Since the establishment of the Six Sigma quality improvement program in 2001, several projects have been successfully carried out in the copper-lead, zinc, copper separation, lead upgrading and bulk
Jan 1, 2008
-
Copper Concentrate Quality Improvements at Myra Falls (40th Annual Meeting of the January 22 to 24, 2008 Canadian Mineral Processors Ottawa, Ontario, Canada )By Trevor Yeomans
"NVI Mining’s Myra Falls Operation is a forty year old underground mining operation feeding a 4000 mtpd concentrator.The current Mill, built in 1985, was designed to process a large massive sulphide o
Jan 1, 2008
-
Increasing Cezinc's Magnesium Bleed CapacityBy E. Benguerel, G. Monteith, L. Centomo, S. Pelletier
In early 2007, it became apparent that with changing concentrate feeds, the magnesium (Mg) load projected for CEZinc starting in 2009 and beyond would quadruple and overwhelm the current Mg process bl
Jan 1, 2008
-
Role and Behaviour of Copper in HBMS's Zinc Pressure Leach PlantBy S. Shairp
Copper is an impurity as well as a necessary reagent in the processing of zinc sulfide concentrate at Hudson Bay Mining & Smelting Co., Limited's (HBMS) zinc pressure leach plant. Copper is prese
Jan 1, 2008
-
Operational Improvements at Brunswick's Lead Blast FurnaceBy A. Longval, Q. Jiao, T. Shannon
In 2000, Xstrata Zinc (former Falconbridge Ltd.) Brunswick Smelter commissioned a modified lead blast furnace. Since then, efforts have been made to improve its operation in order to achieve optimal o
Jan 1, 2008
-
Teck Cominco's KivcetTM Furnace Operation - The First 10 YearsBy G. G. Richards, D. J. Rioux, R. L. Stephens
Teck Cominco Metals Ltd. operates an integrated zinc-lead complex at Trail, British Columbia, Canada. The year 2007 marks ten years of operation of KIVCETTM flash smelting technology for the treatment
Jan 1, 2008
-
The Recovery of Zinc from Baja Mining Corp's El Boleo OrebodyBy M. Holmes, R. Molnar, E. Norton, K. Baxter, J. Riordan
The Boleo Copper-Cobalt-Zinc-Manganese Project of Baja Mining Corp. is situated adjacent to Santa Rosalia on the Baja Peninsula of Mexico. The El Boleo ore is a mixed oxide-sulfide deposit with major
Jan 1, 2008
-
Sudden slumping of hydraulic fills inside geotextile bagsBy H. J. lgner
Hydraulic fills are widely used in the tabular, steeply dipping stopes of the South African gold and platinum mines as an integrated process within a daily cycle of drill and blast. There is therefor
May 1, 2007
-
The Hydrogen Economy: Current Reality and Future Prospects from the Perspective of a Major ProducerBy Pierre Gauthier
Is the hydrogen economy of the future just another fish story? Absolutely not! There have been many changes affecting the energy equation over the last 10 years and conditions have changed. In this
May 1, 2007
-
Energy/GHG Management Assessment Using TSM IndicatorsBy Lauri Gregg
Key Message Energy focused Change Management Process that engages operations managers is the missing tool needed to build capacity for energy/GHG management
May 1, 2007
-
The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground VoidsSafe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such
May 1, 2007
-
Use of Thickening for Sustainable Management of Mine TailingsBy Catherine N. Mulligan
Thickening of mine tailings is a relatively new concept for their sustainable management. Removal of water from the tailings to form a paste instead of slurry disposal decreases environmental and geot
May 1, 2007
-
The Integration of Photovoltaic and Solar Ventilation Technologies into a Pre-fabricated Outdoor RoomBy Himanshu Dehra
The pre-fabricated outdoor rooms are often utilised near the mines and construction sites for office purposes. The paper has presented modelling and simulation results of the integration of commercial
May 1, 2007
-
Iron Ore in Northern Labrador -The Rejuvenation of an Historic Mining Camp at ScheffervilleBy John F. Kearney
After World War II Canada?s fledgling iron ore mining industry developed along the ill-defined Quebec / Labrador border near what became the town of Knob Lake and later renamed Schefferville. For abo
May 1, 2007
-
Hydraulic Fill Research at James Cook University in the new MillenniumBy K. Pirapakaran
The Geotechnical Engineering research group at James Cook University has been working closely with all the leading mines in Australia in the area of minefills. They have carried out substantial resear
May 1, 2007
-
Energy Initiatives Ontario OperationsOntario Operaations Mining Garson Stobie Copper Cliff North Copper Cliff South Creighton Mcreedy East Milling Clarabelle Mill Smelting Smelter Matte Processing Anode Casting Refining Co
May 1, 2007
-
Rationale for Quantum Leap Innovations in Mine FillBy J. H. Nantel
Indications are that underground mining is gaining favour with large and small mining companies due to environmental and sustainability concerns. Dramatic changes to mine fill technologies will be nee
May 1, 2007
-
Using Effective Stress Theory to Characterize the Behavior of BackfillThe importance of understanding the behaviour of cemented paste backfill (CPB) within the framework of the effective stress concept is highlighted in this paper. Only through an understanding built on
May 1, 2007
-
Towards 5.0 million tonnes of pellets per annumBy Ronald C. Schimmel
In 2006, the Corus IJmuiden pellet plant produced approximately 4.6 mln tonnes of pellets. Corus IJmuiden is about to increase its pig iron production to 6.4 mln tonne HM per annum. The burden of th
May 1, 2007